LUTC PKT 07-02-2007
City of Federal Way
City Council
Land Use/Transportation Committee
July 2, 2007
5:30 p.m.
City Hall
Council Chambers
MEETING AGENDA
1. CALL TO ORDER
2. APPROVAL OF MINUTES: June 4, 2007
3. PUBLIC COMMENT (3 minutes)
4. BUSINESS ITEMS
A. Lake Lorene 50% Design and Authorization to Proceed to 85%;
Request to Combine with Lake Jeanne Project
B. Resolution to Set the Public Hearing for 2008-2013 Transportation
Improvement Plan (T.I.P.)
C. Grant Funding for Transportation Improvement Projects
D. Local Commute Trip Reduction Plan
E. City Center Access Draft Public Involvement Plan
F. "Transit Now!" Funding Letter ofIntent
G. Emergency Equipment
5. FUTURE MEETINGS/AGENDA ITEMS
6. ADJOURN
Action 5 minlBucich
Action 5 min/Perez
Action 10 min/Salloum
Information 15 min/Long
Perteet, Inc.
Action 30 min./Zukowski
Action 10 min/Perez
Action 10 min/Roe
Committee Members
Jack Dovey, Chair
Linda Kochmar
Dean McColgan
City StatT
Cary M. Roe, P.E., Assistant City Manager/Emergency Manager
Darlene LeMaster. Administrative Assistant If
253-835-2701
G:lLUTClLUTC Agendas ami Summaries 2007\07-02-07 LUTe Agenda.doc
City of Federal Way
City Council
Land Use/Transportation Committee
June 4, 2007
5:30 pm
City Hall
City Council Chambers
MEETING MINUTES
In attendance: Committee Chair Jack Dovey, Committee Member Linda Kochmar and Committee Member Dean McColgan;
Council Member Jeanne Burbidge, Mayor Michael Park, Deputy Public Works Director Ken Miller; Deputy City Attorney
Aaron Walls, Street Systems Manager/Deputy Public Works Director Marwan Salloum, Senior Planner Margaret Clark,
Community Development Services Director Kathy McClung, City Clerk Laura Hathaway, Assistant City Manager/CFO Iwen
Wang, Assistant City Manager/Emergency Manager Cary Roe, Surface Water Manager Paul Bucich, Associate Planner Andy
Bergsagel, and Administrative Assistant II Darlene LeMaster
1. CAJ.,L TO ORDER
Committee Chair Dovey called the meeting to order at 5:30 p.m.
2. APPROVAL OF MINUTES
The May 21,2007, LUTC meeting minutes were approved.
Moved: Kochmar Seconded: McColgan
Passed: Unanimously
3. PUBLIC COMMENT
There was no public comment.
4. BUSINESS ITEMS
A. Hearing Examiner - A ward of Contract
Laura Hathaway provided the background information on this item. There was no public comment. Committee
Chair Dovey inquired how long the length of the new contract would be, how long was the last hearing examiner
contract and could we bring a new hearing examiner in on a trial basis? Ms. Hathaway said the contract would have
a'two-year tern. At present, a contract is in draft form pending a pricing proposal (either fixed rate or hourly)
evaluation. Staff is waiting to negotiate a final cost plan with Mr. Olbrechts from Ogden, Murphy, Wallace. Until
now, the City has held an agreement with Steven Causseax for hearing examiners services since 1994. The contract
will also contain a termination clause that allows the City to terminate the agreement for any reason with a 60 verbal
or written notice. Committee Member McColgan asked if staff was recommending approval and executing of a
contract or was staff recommending the selection of a hearing examiner and approving entering into negotiations for
a contract? Committee Member Kochmar asked if this contract would be in place prior to Council consideration. Ms.
Hathaway explained that this agenda item will go before Council tomorrow evening, June 5, 2007. At this time, the
Committee will be approving the selection of and the recommendation to enter into contract negotiations with Mr.
Olbrechts of Ogden, Murphy, Wallace.
Moved: McColgan Seconded: Dovey Passed: Unanimously
Committee APPROVED entering into negotiations for a contract for Hearing Examiner services with Phil
Olbrechts on to the June 5, 2007, City Council Consent Agenda for approval. Staff will return to l,lJTC with
a recommendation to approve and execute a contract for Hearing Examiner Services with Phil Olbrechts
once a contract has been negotiated.
G:\LUTClLUTC Agendas and Summaries 2007\06-04-07 LUTC Minutes.doc
Land Use/Transportation Committee
Page 2
June 4, 2007
B. South 308m Street Stormwater Facility Modifications Project - Bid A ward
Paul Bucich provided the background information on this item. There was no public comment. There was no
discussion.
Moved: McColgan Seconded: Kochmar Passed: Unanimously
Committee PASSED Option 1 to the June 19, 2007, City Council Consent Agenda for approval.
C. Supplemental Funding for the Joe's Creek Salmon Habitat Restoration Project
Paul Bucich provided the background information on this item. There was no public comment. There was no
discussion.
Moved: Kochmar Seconded: iVlcColgan Passed: Unanimously
Committee PASSED Option 1 to the June 19,2007, City Council Consent Agenda for approval.
D. Amendment to the Interlocal Cooperation Agreement with King County for Conservation Futures Levy Funding
Paul Bucich provided the background information on this item. There was no public comment. There was no
discussion.
Mo,'ed: McColgan Seconded: Kochlllar Passed: Unanimously
CommittccP ASSED Option 1 to the .June 19,2007, City Council Consent Agenda for appnmll.
E. 2006 Comprehensive Plan Amendments - Chapters 1. 4. 6. and 7. and Site Specific Rezone ReQuests
Margaret Clark provided the background information on this item. Ms. Clark also distributed supplemental material
to the agenda packet, "Amendments to Chapter Two - Land Use" and also some information on parking ratios
utilized by various cities for medical/dental offices. This responds to issues raised at the last LUTC meeting.
Committee Chair Dovey revisited the change to parking requirements for medical and dental offices and asked how
many offices this revision may effect. Ms. Clark responded that the exact number of non-conforming existing
medical and dental offices is not known; however, if approved, the CE zone would nearly double the amount of land
and any new medical/dental offices would need to meet the new requirement.
Committee Member McColgan addressed the sign code for retailers, wanting to make sure that our sign code is fair
to all retailers. Ms. Clark replied that the proposed change would ensure that conforming signs would not be made
nonconforming and the change would allow one additional property to be eligible for a high-profile sign. She also
commented that WalMart has a high-profile sign. Committee Member McColgan also asked for the ratio of regular
parking stalls to compact stalls. Ms. Clark responded that 25 percent of the total parking stalls can be compact.
Ms. Clark presented the site specific requests. The following residents were present for Public Comment on this
topic regarding site specific requests to the Comprehensive Plan Amendments:
Barbara Napier - Request #6, Lifeway Church, 923 Shaw Road, Puyallup. Ms. Napier commented that she
concurs with staff's recommendation in regards to this request.
Vilma Taylor, 30432 Military Road South, Request #5-Taylor, Ms. Taylor is in favor of the Comprehensive
Plan Amendments in regards to this request.
Annette Ramsour, Federal Way. Ms Ramsour owns land near the Trimble property. She opposes the Trimble
Request-#2 and comments that she does not understand why Council is still considering this request when
surrounding neighbors are in opposition.
Carol Reaney, 31605 54th Avenue Sw, Federal Way, Request #2-Trimble. Comments in opposition to the
request. Ms. Reaney feels that if the Trimble land is rezoned, trees will be cut down, resulting in more noise.
Currently, trees are muffling noise from traffic, Dash Point State Park, etc. Ms. Reaney is also concerned that
potentially more homes could result in more traffic or increased speed of traffic. In addition, she asked if this
change would affect the property tax of the existing homes.
G:\LUTC\LUTC Agendas and Summaries 2007\06.04-07 LUTC Minutes.doc
Land Use/Transportation Committee
Page 3
June 4, 2007
Terry Trimble, 5445 SW 316/h Place, Federal Way. Request #2-Trimble. Mr. Trimble only wants to add two
. homes that his grown children will occupy. He does not want to change the atmosphere of the neighborhood.
He does not feel that these two additional residences will impact traffic.
Committee Member Kochmar asked with the proposed amendments, could more than two homes be added. Ms.
Clark answered, yes, three homes could be added; however, Mr. Trimble is only planning to add two. Mr. Trimble's
property taxes may be affected, but not other existing homes. Committee Member Kochmar asked if traffic and
noise level would be impacted. Ms. Clark commented that a traffic analysis would be done and the roads may have
to be improved, but there would be no significant impact to traffic or noise from the addition of two to three more
homes. Mr. Roe concurred.
Committee Chair Dovey asked ifthere was a way to take just the Trimble property and zone it so that only two more
houses may be built. Ms. Clark replied that the city's zoning is such that the only way to restrict the property to just
two more houses would require special conditions. Mr. Roe replied that it might be doable to place such a condition
on the property, but the legal department would have to research the issue to be sure.
Committee Chair Dovey expressed concern that changing the parking requirement for medical and dental offices
would increase the cost of any development and asked if the applicant for the Gramor request is aware of the
proposed change. Ms. Clark replied that they are aware of the proposed change and designed their conceptual plan
based on the proposed parking requirement. The Committee requested the applicant to respond to this concern.
John Graham, applicant for the Gramor Request #3. The proposed parking requirement for medical and dental
offices isfine because they need that amount of parking. He wants to be sure that parkingfor his development
be adequate and the proposal should do that.
Ms. Clark continued with the staff presentation. Committee Chair Dovey asked what would the process for anyone
proposing a development to find out if that development is near a wellhead, since Lakehaven Utility District does
not want to include maps of the wellheads for security reasons. Ms. Clark responded that city maps show the
wellhead protection areas (but not the location of the well) for those proposing developments.
Moved: Kochmar Seconded: McColgan Passed: Unanimously
Committee PASSED Option 1 - adopt the Planning Commission recommended amendments as shown in
Exhibits A, B, C, and n to the Draft Adoption Ordinance to the June 19,2007, City Council Consent Agenda
with the staff recommendation for site specific request #6, Ufeway Church.
5. FUTURE MEETING
The next regular meeting is June 18, 2007.
6. ADJOURN
The meeting adjourned at 6:40 p.m.
G:\LUTClLUTC Agendas and Summaries 2007\06-04-07 UiTC Minutes.doc
COUNCIL MEETING DATE: July 17, 2007
ITEM
CITY OF FEDERAL WAY
CITY COUNCIL
AGENDA BILL
SUBJECT: Lake Lorene Outlet Improvement Project - 50% Design Status Report; Request to Combine
with Lake Jeane Outlet Improvement Project .
POLICY QUESTION: Should the Council authorize staff to proceed further with design of the Lake Lorene Outlet
Improvement Project and return to the Council at 85% design completion for further reports, and authorize staff to
combine the Lake Jeane Outlet Improvement Project and the Lake Lorene Outlet Improvement Project into one
project in order to save project costs?
COMMITTEE: LUTC
MEETING DATE: July 2,2007
CATEGORY:
[gJ Consent
o City Council Business
o Ordinance
o Resolution
o
o
Public Hearing
Other
~!_~!~_I!~_"'Q~!}~~~_~~~L~:~_~~~hll?;~2_~~[~~...~_ate~M~~g__ _ ____.._.__~_~~!_:__~~?~~~_~~:.~~_____..__.______
Attachments: Memorandum to the Land Use and Transportation Committee dated July 2, 2007.
Options Considered:
1. Authorize Surface Water Management staff to proceed with design of the Lake Lorene Outlet
Improvement Project and return to the LUTC Committee at the 85% design completion stage for further
reports and authorization.
2. Authorize Surface Water Management staff to proceed with design of the Lake Lorene Outlet
Improvement Project and return to the LUTC Committee at the 85% design completion stage for further
reports and authorization, and to combine the Lake Jeane Outlet Improvement Project and the Lake
Lorene Outlet Improvement Project into one project and combine project funding.
3. Do not authorize staff to continue with the project design and provide direction to staff.
._.......___...............__........__......___.......__.__.___.._....__...__._._.._..._._w_....__.___.._____.._..___.___._..~_.-----....~-._._-.......-.,......-........--.......-.....-.....................--.-------......--.....---.--.--...-....--.-------...
STAFF RECOMMENDATION: Staff recommends forwarding Option 2 above to the July 17,2007 Council Consent
Agenda for approval.
CITY MANAGER ApPROVAL: hi(,
Committee
Council
DIRECTOR ApPROVAL: ~
Committe"'-
Council
COMMITTEE RECOMMENDATION:
Forward staff recommendation for Option 2 to the July 17,2007 City Council Consent Agenda.
Dean McColgan, Member
Jack Dovey, Chair
Linda Kochmar, Member
PROPOSED COUNCIL MOTION: "I move to authorize Surface Water Management stajfto proceed with design
of the Lake Lorene Outlet Improvement Project and return to the LUTC Committee at the 85% design
completion stage for further reports and authorization, and to combine the Lake Jeane Outlet Improvement
Project and the Lake Lorene Outlet Improvement Project into one project and combine project funding. "
(BELOW TO BE COMPLETED BY CITY CLERKS OFFICE)
COUNCIL ACTION:
o APPROVED
o DENIED
o T ABLEDIDEFERREDINO ACTION
o MOVED TO SECOND READING (ordinances only)
REVISED - 02/06/2006
COUNCIL BILL #
1 ST reading
Enactment reading
ORDINANCE #
RESOLUTION #
CITY OF FEDERAL WAY
MEMORANDUM
DATE:
TO:
VIA:
FROM:
SUBJECT:
July 2, 2007
. Land Use and Transportation Committee
Neal Beets, City Manager .
Paul A. Bucich, P.E., Surface Water Manage~
AG 06-031, Lake Lorene Outlet Improvement Project - 50% Design Status Report;
Request to Combine with Lake Jeane Outlet Improvement Project
BACKGROUND:
According to the Comprehensive Surface Water Management Plan, flooding is predicted around Lake
Lorene during the occurrence of a lOO-year storm, under existing development conditions. In order to
solve the flooding problem, SWM will add a new lake outlet system to augment the existing lake outlet
system. The new system will consist of a new lake intake and a piping system approximately 450 linear
feet to be connected to the existing stormwater conveyance system downstream. The new system will
only activate when the lake level rises and the existing natural system is at capacity. With the proposed
improvements, flooding around the lake can be controlled up to and including the lOO-year, 24-hour
storm event under future land use conditions.
The project design is approximately 50% complete, which includes the following completed tasks:
· Topographical Survey and Mapping
· Geotechnical evaluation of the site subgrade and groundwater conditions
· Gathering of existing utility information
· Drafting of SEP A checklist
· Project design plans to 50% level
Ongoing tasks include:
· Processing various permits including SEPA documentation, City's Director's Approval, and
potentially HPA Permit and Army Corp of Engineer's 404 Permit
· Coordination with utility providers to minimize impacts to existing underground utilities and
coordinate relocation where conflicts are unavoidable
· Monitoring groundwater levels
· Project design to 85% level
ESTIMA TED PROJECT EXPENDITURES:
Design
Year 2008 Construction (Estimate)
20% Construction Contingency
10% Construction Management
Pavement impact mitigation
Advertising and Production Costs
TOTAL PROJECT COSTS
$ 58,300
$ 241,000
$ 48,200
$ 24,lOO
$ 4,500
$ 4,000
$380,100
AVAILABLE FUNDING:
TOTAL A V AILABLE BUDGET
$390,000
July 2, 2007
Land Use and Transportation Committee
Lake Lorene Outlet Improvement Project - 50% Design Status Report
Page 2
The Lake Jeane Outlet Improvement Project is another. capital improvement project listed in the
Comprehensive Surface Water Management Plan. The design of this project was initiated in early 2006
in anticipation of constructing the project in the summer of 2007. On September 5, 2006, the Council
approved 50% design of the project and authorized SWM to proceed with the design and report back to
council at the 85% design stage. While the design team was proceeding with the 85% design, it was
thought that there was a potential risk associated with groundwater levels and it was recommended to
staff to monitor the groundwater levels through at least one summer season. As a result, the project
construction schedule was postponed till 2008 in order to conduct the monitoring in the summer of 2007.
The design of the project is therefore on hold pending this investigation.
Because of the close proximity of Lake Jeane and Lake Lorene, the similar nature of the two projects, and
now the same construction schedule, SWM is requesting to combine the two projects into one so that the
design and construction of the two projects can be managed together in order to save the costs of project
management as well as to realize a potentially lower construction cost on both projects.
cc: Project File
Day File
COUNCIL MEETING DATE: July 17, 2007
ITEM
CITY OF FEDERAL WAY
CITY COUNCIL
AGENDA BILL
SUBJECT: Grant Funding for Transportation Improvement Projects
POLICY QUESTION: Should City Council authorize staff to submit grant applications for transportation improvement
projects?
COMMITTEE: Land Use and Transportation Committee
MEETING DATE: July 2, 2007
CATEGORY:
IZI Consent
o City Council Business
o Ordinance
o Resolution
o
o
Public Hearing
Other
~!AFF R:~PQ~T .I.J_'::.:.JY:!~!:::Y._~~ S~!!g~E.?:?_~:~.:!_~!I:~_~!_._~~~!.!l~M~~~~e.!.:______..____ .._~~.~~:._~~~~~~~!_~_~_____.._______________..
Attachments: Memorandum to the Land Use and Transportation Committee dated July 2,2007.
Options Considered:
1. Authorize staff to submit a grant funding application under the 2009 Transportation Improvement Board
(TIB) Funding Program for the following transportation improvement project:
· Pacific Highway at S 356th Street Intersection Improvements
2. Modify the project for which staff should submit a grant-funding application.
3. Do not submit any grant funding application to TIB for these projects.
STAFF RECOMMENDATioN:-S-t~fi~eco;m;e~d~forn,-a~ding-6ptionTto.-theJuly-.if'2007-CouncifCon-~~~tAg-e;nda-fo~-
approval.
/hI/l.
DIRECTOR ApPROVAL:
Chvt
Committ~
CITY MANAGER ApPROVAL:
Committee
Council
Council
COMMITTEE RECOMMENDATION: Committee recommends forwarding staffs recommendation to the July 17, 2007
Council Consent Agenda for approval.
Jack Dovey, Chair Linda Kochmar, Member Dean McColgan, Member
. PROPOSED COUNCIL MOTION: "I move approval to authorize staff to proceed with submitting a grant funding
application under the 2009 Transportation Improvement Board (TIB) Funding Program for the following
transportation improvement project: Pacific Highway at S 35rJh Street Intersection Improvements. "
(BELOW TO BE COMPLETED BY CITY CLERKS OFFICE)
COUNCIL ACTION:
. 0 APPROVED
o DENIED
o TABLED/DEFERRED/NO ACTION
o MOVED TO SECOND READING (ordinances only)
REVISED - 02/06/2006
COUNCIL BILL #
1 ST reading
Enactment reading
ORDINANCE #
RESOLUTION #
CITY OF FEDERAL WAY
MEMORANDUM
DATE:
TO:
VIA:
FROM:
SUBJECT:
July 2, 2007
Land Use and Transportation Committee
Neal Beets, City Manager . n
Marwan Salloum, P.E., Street Systems Manager ~
John Mulkey, P.E., Street System Project Engineer
Grant Funding for Transportation Improvement Projects
BACKGROUND
This memorandum provides the Council with the current funding availability of new grant funding
programs for transportation projects. Staff has evaluated all projects listed on the City's Six Year
Transportation Improvements Plan (TIP) and concluded that the following project will likely be
competitive in the 2009 Transportation Improvement Board (TIB) Funding Program.
Project (Funding Phase)
Grant
Estimated
Pro.ject Cost
Possible Grant
Fund
Required
City Match
Pacific Highway At S 356th Street Intersection
Improvements
(Construction)
2009 Urban Corridor Program (TIB)
$7,400,000
$4,440,000
$2,960,000
COUNCIL MEETING DATE: July 17,2007
ITEM
CITY OF FEDERAL WAY
CITY COUNCIL
AGENDA BILL
SUBJECT: Setting Public Hearing for 2008-2013 Transportation Improvement Plan
POLICY QUESTION: Should City Council set a Public Hearing for adoption of the Transportation Improvement
Plan on September 4th, 200n
COMMITTEE: LAND USE/TRANSPORTATION COMMITTEE
MEETING DATE: July 2nd, 2007
CATEGORY:
~ Consent'
o City Council Business
o Ordinance
~ Resolution
o
o
Public Hearing
Other
.~!.~!!'_~!'-2.~!_~.Y:l~J~.~__!'.~~~:?,'._~:g:'.~~!Y_!~-'!f.f~~_~!I:~~!1.~~~m._______m
DEPT: Public Works
Attachments: Memorandum to the Land Use and Transportation Committee dated July 2, 2007.
Options Considered:
1. Set Public Hearing for adoption of the Transportation Improvement Plan on September 4th, 2007.
2. Set Public Hearing on an alternative date recommended by the committee.
_.____~___._H___..__...__....._.__._...__.....H._..........._........._.__,......._......._.....__.._..__....._....~.._._..._.~_....._M......................_..__..........___.........._......._.................._.........................................__..............._............__.......................
STAFF RECOMMENDATION: Staff recommends Option 1.
CITY MANAGER ApPROVAL:
~
Committee
Council
DIRECTOR ApPROVAL: ~
Committee
Council
COMMITTEE RECOMMENDATION: Forward staff recommendation for Option 1 to the July 17,2007 City
Council Consent Agenda.
Jack Dovey, Chair
Linda Kochmar, Member
Dean McColgan, Member
PROPOSED COUNCIL MOTION: "I move approval of the resolution setting the date of a Public Hearingfor the
2008-2013 Transportation Improvement Plan on September 4, 2007. "
(BELOW TO BE COMPLETED BY CITY CLERKS OFFICE)
COUNCIL ACTION:
o APPROVED
o DENIED
o T ABLEDIDEFERREDINO ACTION
o MOVED TO SECOND READING (ordinances only)
REVISED - 02/06/2006
COUNCIL BILL #
1 ST reading
Enactment reading
ORDINANCE #
RESOLUTION #
CITY OF FEDERAL WAY
MEMORANDUM
DATE:
TO:
VIA:
FROM:
SUBJECT:
July 2, 2007
Land Use and Transportation Committee
Neal Beets, City Manager fJ/rr'L-
Rick Perez, P.E., City Traffic Engineer
Setting Public Hearingfor 2008-2013 Transportation Improvement Plan
POLICY QUESTION:
Should City Council set a Public Hearing for adoption of the Transportation Improvement Plan on September 4t\
200n
BACKGROUND:
In accordance with the requirements of Chapters 35.77 and 47.26 ofthe Revised Code of Washington (RCW), the
City of Federal Way adopted its original Transportation Improvement Plan (TIP) and Arterial Street Improvement
Plan (ASlP) on July 23, 1991. The City is also required to adopt a revised TIP and ASlP on an annual basis to
reflect the City's current and future street and arterial needs.
The City is required to hold a minimum of one public hearing on the revised plans. Staff proposes that this occur
at the September 4,2007 City Council meeting. Once the revised plans have been adopted by Resolution, a copy
of the respective plans must be filed with the Washington State Secretary of Transportation and the Washington
State Transportation Improvement Board. The attached Resolution sets the public hearing date for the September
4,2007 City Council meeting. The TIP will be presented to the Land Use and Transportation Committee on
August 7 or 21.
OPTIONS:
1. Set Public Hearing for adoption ofthe Transportation Improvement Plan on September 4th, 2007.
2. Set Public Hearing on an alternative date recommended by the committee.
STAFF RECOMMENDATION:
Authorize Option 1 to set the Public Hearing date for adoption ofthe Transportation Improvement Plan for
September 4th, 2007.
COMMITTEE RECOMMENDATION:
Forward Option I to the July 17,2007 City Council Consent Agenda.
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OFTHE CITY OF
FEDERAL WAY, WASHINGTON, SETTING A PUBLIC
HEARING DATE OF TUESDAY, SEPTEMBER 4,2007 FOR
ADOPTION OFA REVISED SIX-YEAR TRANSPORTATION
IMPROVEMENT PROGRAM AND ARTERIAL STREET
IMPROVEMENT PLAN.
WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the City
Council of the City of Federal Way must adopt a revised and extended Six-year Transportation
Improvement Program ("TIP") and Arterial Street Improvement Plan ("ASIP") annually; and
WHEREAS, the City of Federal Way's SEPA Responsible Official reviewed the TIP and
ASIP under the State Environmental Policy Act, RCW 43.21C, and issued a Determination of
Nonsignificance on ; and
WHEREAS, a public _~earing must be held prior to the adoption ofthe revised and extended
Six-year Transportation Improvement Program and Arterial Street Improvement Plan;
NOW THEREFORE, THE CITY COuNCIL OF THE CITY OF FEDERAL WAY,
WASHINGTON DOES HEREBY RESOLVE AS FOLLOWS:
Section 1. Public Hearing. A public hearing shall be held on the 2008-2013 Federal Way
Transportation Improvement Plan and Arterial Street Improvement Plan at 7:00 p.m. on Tuesday,
September 4, 2007, at the Federal Way City Hall Council Chambers:
Section 2. Severability. If any section, sentence, clause or phrase of this resolution should be
Res. #
, Page I
held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or
unconstitutionality shall not affect the validity or constitutionality of any other section, sentence,
clause or phrase of this resolution.
Section 3. Ratification. Any act consistent with the authority and prior to the effective date of
the resolution is hereby ratified and affirmed.
Section 4. Effective Date. This resolution shall be effective immediately upon passage by the
Federal Way City Council.
RESOLVED BY THE CITY COUNCIL OF THE CITY OF FEDERAL WAY,
WASHINGTON this
day of
,2007.
. CITY OF FEDERAL WAY
MAYOR, MICHAEL PARK
ATTEST:
CITY CLERK, LAURA HATHAWAY, CMC
,.
APPROVED AS TO FORM:
CITY ATTORNEY, PATRICIA A. RICHARDSON
FILED WITH THE CITY CLERK:
PASSED BY THE CITY COUNCIL:
RESOLUTION NO.:
Revised: 4/18/06
Res. #
, Page 2
COUNCIL MEETING DATE: N/A
ITEM
CITY OF FEDERAL WAY
CITY COUNCIL
AGENDA BILL
SUBJECT: Local Commute Trip Reduction (CTR) Plan
POLICY QUESTION:
Should staff proceed with developing and implementing a Commute Trip Reduction plan and programs?
COMMITTEE: Land Use and Transportation Committee
MEETING DATE: July 2,2007
CA TEGORY:
o Cons~nt
o City Council Business
o Ordinance
o Resolution
o
~
Public Hearing
Other
_~!~!~ RE!2-~!_~l': S~!.~~y-!-~~g?__!~~.f.~}~!!.g!!.l:~~~_._.m_____.__.___.___
DEPT: Public Works
Attachments: Memorandum to the Land Use and Transportation Committee dated July 2, 2007.
Options Considered:
There are no options being considered at this time. This item is presented as information only.
_._---~......~_._.._..._.__..._.__._._....-._._._._.....__._..--.......-.....-........--............--........--.....-........--.....................--......-.----.------................-............---.-...-..-......--....--...,----.......--......--....--.......................-..-......--..........-......--.....
STAFF RECOMMENDATION: No recommendation. Item is for information only.
CITY MANAGER ApPROVAL: ~
Committee
DIRECTOR ApPROVAL:
th~
Committee
Council
Council
COMMITTEE RECOMMENDATION: No recommendation. Item is for information only.
Jack Dovey, Chair
Linda Kochmar, Member
Dean McColgan, Member
PROPOSED COUNCIL MOTION: No motion necessary. Item isfor information only.
(BELOW TO BE COMPLETED BY CITY CLERKS OF FlCE)
COUNCIL ACTION:
o APPROVED
o DENIED
o T ABLED/DEFERRED/NO ACTION
o MOVED TO SECOND READING (ordinances only)
REVISED - 02/06/2006
COUNCIL BILL #
1 ST reading
Enactment reading
ORDINANCE #
RESOLUTION #
CITY OF FEDERAL WAY
MEMORANDUM
DATE:
TO:
VIA:
FROM:
SUBJECT:
July 2, 2007
Land Use and Transportation Committee
Neal Beats, City Manager
Sarady Long, Traffic Engineer ~
Richard A. Perez, P.E, City Traffic Engineer ff
Local Commute Trip Reduction (CTR) Plans
BACKGROUND:
Washington State's Commute Trip Reduction (CTR) Law was adopted by the 1991 Legislature and
incorporated into the Washington Clean Air Act as RCW 70.94.521 through 70.94.551. Its intent is to
improve air quality and reduce fuel consumption and traffic congestion through employer-based programs
by encouraging the use of alternatives to single occupant vehicles (SOV) for the commute trip. In 2006,
the Washington Legislature adopted changes to the CTR law. As part .of these changes, the law requires
cities to develop Local CTR plans and adopt ordinances consistent with the new rules and guidelines
developed by the state. The most significant changes to the CTR law affecting the city include:
· Development of Local CTR Plans integrating CTR law with local, regional and state
transportation and land use planning. Plans must be approved by the Puget Sound
Regional Planning Council (PSRC) and CTR Board.
· Flexibility for a city to set employer goals beyond the state minimum drive alone rate
target a reduction of lO% for the next four years.
UPDATE:
The Washington State Department of Transportation (WSDOT) provides technical assistance funding to
the City for developing and implementing the Commute Trip Reduction (CTR) plans and programs. With
the passage of the new CTR law, the state also provides additional funding of $5,426 to the City for the
development of a Local CTR plan. Perteet, Inc. has been selected to prepare the required local CTR plan
for the City. A Draft Local CTR Plan is attached. Staff will submit this Draft Plan to PSRC for review in
July. The following are key due dates for submitting Local CTR plans.
· July 2 - Deadline for submittal of Draft CTR Plan to the Puget Sound Regional Planning
Council (PSRC)
· July 2 - August 31 - PSRC will review/comment on the program
· September 14 - Deadline for submittal of Final Local CTR Plans to PSRC
· October 1 - Deadline for submittal of Final Local CTR Plans to CTR Board
Due to aggressive schedule set by the State, staff is not requesting action on the CTR Plans at this time.
The project is presented only for your information and comment. Once staff receives comments/approval
from PSRC, the plan will be revised and presented at LUTC and Council for further action.
cc: Project File
City of Federal Way
Draft Commute Trip Reduction Plan
DwaAIFT
=
'0
-~
/:.~.
/ ..4
/ ~
June 2007
Table of Contents
INTRODUCTION ........................................................................................................... 1
I. BASELINE ASSESSMENT ...................................................................................... 3
II. AND III. BASELINE AND GOALS FOR 2011.......................................................35
IV. STRATEGIES FOR ACHIEVING GOALS AND TARGETS ...............................37
V. REQUIREMENTS FOR MAJOR EMPLOYERS ...................................................43
VI. FINANCIAL PLAN................................................................................................ 46
VII. IMPLEMENTATION STRUCTURE .....................................................................50
VIII. DOCUMENTATION OF CONSULTATION ........................................................52
List of Appendices
Appendix A:
Appendix B:
Appendix C:
Appendix D:
Appendix E:
Appendix F:
Appendix G:
Appendix H:
City of Federal Way Vicinity CTR Worksites
City of Federal Way Comprehensive Plan Map
City of Federal Way Zoning Map
City of Federal Way Transit Services and Facilities
City of Federal Way Non-Motorized Facilities
Commute Trip Reduction Workshop Summary
Summary of Policies That Support CTR
Glossary of Terms
Ci~ of Federal Way
Commute Trip Reduction Plan
June 2007
INTRODUCTION
On January 19,1993, the City of Federal Way adopted the Commute Trip Reduction Ordinance
(Ordinance 93-164). The purpose of this ordinance was to comply with the Commute Trip
Reduction Act RCW 70.94.521 adopted by the Washington State Legislature in 1991. This law
requires employers of 100 or more employees who arrive between 6 and 9 a,m, to develop and
implement a program to encourage their employees to redu'ce vehicle miles traveled and drive
alone trips.
In 2006, the Washington State Legislature pa,ssed the Commute Trip Reduction Efficiency Act
which amended the requirements for local governments in those counties experiencing the
greatest automobile-related air pollution and traffic congestion to develop and implement plans to
reduce drive alone trips. This plan has been prepared in accordance with these revisions to RCW
70.94.521.
Under the Washington State CTR Efficiency Act requirements, the City is required to prepare a
new CTR plan and set new goals.. The Commute Trip Reduction Plan is a collection of City-
adopted goals and policies, facility and service improvements, and marketing strategies about how
the City will help make progress for meeting the goals over the next four years. The goal of the
Federal Way CTR plan is to reduce drive alone trips by 10% and vehicle miles traveled by 13%
among major work sites. Building upon the success of the existing commute trip reduction
program, the City strives to meet the goals of the plan for the future by working in partnership and
coordination with other agencies and employers.
This proposed Plan has been developed through extensive involvement by CTR-affected
employers and King County Metro who helped identify strategies and ways for successful
achievement of the goals. This plan helps to support the achievement of the City's vision and the
goals of its comprehensive plan.
Benefits of the CTR Program to City of Federal Way
Although the Commute Trip Reduction Program only applies to a few sites in the City of Federal
Way, the CTR program will continue to grow and address a variety of transportation and
environmental issues. Several trends are increasing the value of CTR in Federal Way, particularly
as an alternative to expanding roads and parking facilities. The major transportation problems
facing Federal Way are traffic and parking congestion, inadequate mobility for non-divers, and
various economic, social and environmental costs associated with high levels of automobile travel;
all problems that can be addressed by CTR. The value of CTR is further enhanced by the following
trends:
. Rising facility costs. The cost of expanding highways and parking facilities is increasing, In
many cases it is more cost effective to manage demand than to continue expanding
supply. If the CTR program is successful, it will help reduce the demand on state, regional
and local streets, This in turn helps to reduce the need to expand the roadway system.
City of Federal Way
Draft Commute Trip Reduction Plan
June 2007
· Demographics. As the population becomes older and more mature, it will become more
important to increase the availability of quality travel options for non-drivers. Senior
citizens will be more dependent on transit and non-motorized travel options.
· Energy Costs. Vehicle fuel costs have risen dramatically ano are projected to increase in
the future due to depletion of oil supplies and environmental constraints. Rising costs
have increased the demand for non-drive alone travel altematives. The vanpool market, in
particular, has exceeded demand and there are currently waiting lists for available
van pools.
· Consumer preferences and market trends. CTR is addressing current consumer
preferences in which more consumers want to live in more multi-modal communities where
it is possible to walk and bicycle safely, use neighborhood services, and have access to
quality public transportation.
· Environmental concerns. CTR helps to address concerns over air pollution, sprawl and
other environmental impacts by reducing the demand for automobiles. Automobiles
comprise 55% of air pollutants. For each car that is taken off the road, there is a
significant benefit to the environment.
In summary, the CTR program is a cost-effective program that addresses a number of issues in the
City of Federal Way. Although CTR has been applied to only a few work sites, the program will
continue to grow and expand as solutions are needed to complex transportation and environmental
issues.
City of Federal Way
Draft Commute Trip Reduction Plan
2
June 2007
I. BASELINE ASSESSMENT
:~'ffejfJl~:t:~jfWprkSlte~', .'" ;,,'
As part of the requirements of the CTR Efficiency Act, the City of Federal Way conducted a
backgr.ound assessment of land use and transportation conditions of the CTR-affected work sites.
These conditions were used to develop strategies to help the sites meet their CTR goals. Under
the CTR ordinance, there are 13 affected worksites in the City of Federal Way. Those worksites
include the following:
Work Site Address
SI. Francis Hospital 34503 9th Ave S
U.S Postal Services, 34301 9th Ave S
Federal Wav City Hall 33325 8th Ave S
World Vision US 34834 Weverhaeuser Way South,
Beraer/ABAM 33301 9th Ave S
Virainia Mason'Medical Center 33501 1st Way South
'Financial Pacific Leasina 3455 S 344th Street
EDS 32275 32nd Avenue S .
WeYerhaeuser Coroorate 33663 Weverhaeuser Wav S
Weyerhaeuser East Campus III 33940 Weyerhaeuser Way S
Weyerhaeuser North Bui/dina I & II 32275 32nd AvenueS
Weyerhaeuser Northwest Plaza 840 S 333rd Street
Weyerhaeuser Technology Center 32901 Weverhaeuser Way S
A site profile for each CTR-affected work site has been prepared. The locations of the CTR work
sites can be viewed in Appendix A.. '
City of Federal Way
, Draft Commute Trip Reduction Plan
3
June 2007
~14~ItirJ~~'G~$~:R.~gar~i!uf.ba1iiH.Useand,rrali$~pi't~tiQnConditjo.n$Aroyhd:;g-t;ftw6fKi~11~$,i.
51. Francis Hospital. 34503 9th Ave 5
Existing and planned land use conditions: This worksite is located in an office park zoned area.
There are no proposed changes to land use in this
area.
Existing and planned transportation This worksite is located on a principle arterial with a
facilities: sidewalk.
This road is slated to be widened to thee lanes with a
bike lane.
Existing and planned transit services and This worksite is located near a bus stop for King
facilities: County Metro route 182 and is close to the South
Federal Way Park and Ride, which is served by King
CountyMetroroute 196. This worksite is also
serviced by the Dial-a-Ride' shuttle.
There are no proposed changes to transit service in
this area.
Existing parking conditions: There is free and ample parking for employees and
visitors.
'City of Federal Way
Draft Commute Trip Reduction Plan
4
June 2007
St. Francis Hospital-34503 9th Avenue South, Federal Way, WA 98003
, ,
~~f:~'6~6:~'~'
I':, ',"" -::"'~" ~ ,'ell i't"!lIl>E::1
I :,. '....,.... -j 'a.:..:.;l
"; "'r~;"'" ~l , , -tl
.i /,'kl" I", "~~ "'Ll
~:;..0.-~~~~ IL~,_4 l~fi~1](Illro,~'~~~~...::i&
.-. : BlttJ ~~i1:1ll .." 0
..~," " j,:b_ --.,O,.i~tl>t~,'
.x ," 11lt:.- "}~';'
'.. .,,--'~ ',',' :?~~:":~"'e.
Building entrance
t \eT ,:.::.~
'.,.
Bus stop
:Ci',of'federal Wa
ID Number:
Total Number of Employees:
Affected CTR Employees:
2011 Drive Alone Goal:
2011 VMT/Employee Goal:
Services Available:
Bus Routes:
Parkin : '
City of Federal Way
Draft Commute Trip Reduction Plan
&;. C
.. ~
~, (4~:;'~1:'
. . ~,i,
, "
':'J, ll,':
'" "':_,' iJ~\' ," -:. ,.... T , , , <'", ~,.
;'J" ",' _ '-1. X.." "\'(
l~~l:~:'~~>-~q~ ~~r,~., =~<: ~~=~' ;~~~
," .1/' '; ',_: :', ..
~ ~
~===~=~=
~'>:c,,,,..
~-'
Carpool parking
Parking lot
St. IFrariciis: I;Ios, it~1
E80028
1124
406
'74%
8 Miles/day
King County Metro
Metro Route 182
Free and am Ie arkin available
5 June 2007
U.S Postal Services. 34301 9th Ave S
Existing and planned land use conditions: This worksite is located in an office park zoned area.
There are no proposed changes to land use in this
area.
Existing and planned transportation. This worksite is located on a principle artenal with a
facilities: sIdewalk.
This road is. slated to be widened to thee lanes with a
bike lane.
Existing and planned transit services and This worksite is located near a bus stop for King
facilities: County Metro route 182 and is close to the South
Federal Way Park and Ride, which is served by King
County Metro route 196. This worksite is also
serviced by the Dial-a-Ride shuttle.
, There are no proposed changes to transit service in
this area,
Existing parking conditions: There is free and ample parking for employees and
visitors.
City of Federal Way
Draft Commute Trip Reduction Plan
6
June 2007
U.S. Postal Services - 34301 9th Avenue South, Federal Way, WA 98003
~ .~
~~.,,, 0
,,"'Ilr.:l
dJ
ftL~;::;'" } ~
"".f,'-
".":' I! .,. .i; M:'"
~..'.I'. lifj ~'.'._~";~Aj. ....-..."'. j'\o=>e
. "." " ~~ .
~.. ~ .. ':...-- ..~.'"_.- ~~ ~~'~~~--
Entrance'
9<.
-"
9111 Avenue South
Ci of. Federal Wa
10 Number:
Total Number of Employees:
Affected CTR Employees:
2011 Drive Alone Goal:
2011 VMT/EmpJoyee Goal:
Services Available:
Bus Routes:
Parkin :
Bus stop
~, ' .
u.s. Rostill Sel"lices
E80135
612
282
82%
10 Miles/day
King County Metro
Metro Routes 181 and 196
Free and am Ie arkin available
. S. '~I' .
City of Federal Way
Draft Commute Trip Reduction Plan
7
June 2007
City Hall- 33,325 8th Ave S.
Existing and planned land use conditions: This worksite is located in an office park zoned area.
. There are no proposed changes to land use in this
area.
Existing and planned transportation This worksite is located on a collector street, near a .
. facilities: principle arterial with a sidewalk.
The principal arterial is slate.d to be widened to four
lanes.
Existing and planned transit services and This worksite is located near King County Metro route
facilities: 903, This work site is also serviced by the Dial-a~Ride
shuttle.
There are no proposed changes to transit service in
this area.
Existing parking conditions: There is free and ample parking for employees and
visitors.
City of Federal Way
Draft Commute Trip Reduction Plan
8
June 2007
Federal Way City Hall- 33325 8th Avenue South, Federal Way, WA 98063
a.
',0 ~~o'
~ ~',~
.*'
.. .
~.~ ~
, l~__
:1 I> ~!. ~ Ft;deraIWa~.
:j~ . .. . 1
'", ".' J.lJ1S. ~dl Avenu~ 'SQ~rh I
~."~'~ '
lJ ~". ,:
Entrance
~
Pedestrian crossing
€i. ; of Federal Wa
10 Number:
Total Number of Employees:
Affected CTR Employees:
2011 Drive Alone Goal:
2011 VMT/Employee Goal:
Services AVailable:
Bus Routes:
Parkin :
City of Federal Way
. Draft Commute Trip Reduction Plan
l~ 0
. ,
t""
~':~~~-' ---~~~c~
~-
~ .
~~:~
Parking lot
~~
. '..., . i
:} '. 'i';1y:" '..\'
:::'~-t" \~...~,'~'~ <;,., .r.'"
. ".ol.. ~. "" .,<J .. ,
'~}~",;.: ~. o. .
Ul.'~., "-'('c"..' '='~1~'~i:i.~
'~~...:o:.-. 5:.'~ ' \ (j .
".--...~~_'~. .J.
.. ",_>,/:"~~~~':i
\, \ ~ ,Z <.E1 ~ ~'
... _..J,
'"
",dol
~ a,'"
~."~---,""..-.o"".-",n;>f,..-,"",~""'o:l ,~
,,",~ '.. _ -;:''''A~';''' ....: ',.1 "~<'-"_
". ~~' "_, .,..:_'~:_ : ~.!~:' .,' i.' _: ~ t,' ," . ',~ . -{!::', ~~,~
Van pool parking
EederalWa Cit Hall
E80176
306
168
73%
10 Miles/day
King County Metro
Metro Route 903
Free and am Ie arkin available
9 Jun'e 2007
World Vision US - 34834 Weyerhaeuser Way South
Existing and planned land use conditions: This worksite is located in an office park zoned area.
There are no proposed changes to land use in this
; area,
Existing arid planned transportation This worksite is located on a principle collector with a
facilities: sidewalk.
This road is slated to be widened to thee lanes with a
bike lane.
Existing and planned transit services and This worksite is located near Sound Transit route
facilities: 565.
There are no proposed changes to transit service in
this area,
Existing parking conditions: There is free and ample parking for employees and
visitors.
!
City of Federal Way 10 June 2007
Draft Commute Trip Reduction Plan
World Vision US - 34834 Weyerhaeuser Way South, Federal Way, WA 98001
til
~ ' "
'.~ -, -.-, '. -"- -,...,~ ~ ~ ...,....,...~-- .~--- ~
,-," ~~, ~~!11_,:~JI1""-'
~ ,', ~ ~~ It, , -..~ ';;,-3
~ 1Iiiii7"~~~:: - _..~"-~- '.
Parking lot
"h
'0
.," ..Jl;,,"
l ~,
I
c'
'\1i
"';l ;j r...:" J .., 1 l \;j
,;'---'2 0
,.4j,;" .,
~ ;3
.4>" C
. .
I~.
....,
I,'
'~"'i, '.", ""' ,
iI \~\;. ..-, 'i "".....",
~~7'~.:J~~':'.:t::"'~'1l~
Bus stop
l{cr;ofl Federal Wa
ID Number:
Total Number of Employees:
Affected CTR Employees:
2011 Drive Alone Goal:
2011 VMT/Employee Goal:
Services Available:
Bus Routes:
Parkin :
Bike lane in front of entrance
~ '0 " ?;.~ \'ii' . ~I' "'", ,:'; o. .
. "l':".~,~ =Ie",4 .,,~ ,I' " .
:',- '~~',""l!~P ~ .~ '-~Q <"" \ l ..., '" Ii
~., ; , < ~~ ' c; ;,~~ '_ ~1!;, "~'.:: \]
c~~&~.o ~~1,~W4-~'~'-"" ~,
<bO~'~'~~"'J, ~J- -',',-
~,., ~~,;,,,..:;;' ,~(-' "
n ~'Q
~t ~
. ............;....
Pedestrian foot path
World \;.Iisio11!lJ$"
E85779
549
410
77%
11 Miles/day
Sound Transit
ST 565
Free and am Ie
City of Federal Way
Draft Commute Trip Reduction Plan
June 2007
11
Bergerl ABAM - 3330191h Ave S
Existing and planned land use conditions: This worksite is located in an office park zoned area.
There are no proposed changes to land use in this
area.
Existing and planned transportation This worksite is located on a minor arterial with a
facilities: sidewalk.
There is a proposed signal near this worksite.
Existing and planned transit services and This worksite is located near a bus stop for King
facilities: County Metro'route 182. This worksite is also
serviced by the Dial-a-Ride shuttle.
There are no proposed changes to transit service in
this area.
Existing parking cOnditions: There is free and ample parking for employees and
visitors.
City of Federal Way
Draft Commute Trip Reduction Plan
12
June 2007
Berger I ABAM - 33301 9th Avenue South, Federal Way, WA 98003
, If., ~,__,';..:_ L ',~~: :\" '
,,' .' .t _ .....:fl. ,d,
___ : _ - \>i:!~ > O'~:" .~:;; J:;. ",..- . - - , _. __~
0'
'?'i~:,~"q,~,"", ~
".'Ct."
J '
Entrance
..:it~-_"B~L:c"""=-
"~"<a::.",=--Q .+
. ,', <:.'1.'" -
Driveway
€i of Federal Wa
ID Number:
Total Number of Employees:
Affected erR Employees:
2011 Drive Alone Goal:
2011 VMT/Employee Goal:
Services Available:
Bus Routes:,
Parkin :
City of Federal Way
Draft Commute Trip Reduction Plan
.. ''-.;::;'''::: -..,~
. :b..... ~ ,
Q i! c'?; '1'J
c.' ".':-JL ; .L '" .', =
" d"~~:;;;"7'" 'ifj) .:;..~ ~ '
~"." ~-'~t=c ~'-A- ~~~~
Parking lot
~
I 'oi.4<,
'i.. ',' ,~ e\~
~~ ~J ~'~, j' o~~,~l
, ~~ Ii - - 0" ?
~~==, ,"~'
~, ~'5'" o~":,j~
~~.. ~: '~~Q--'<.1
~ ~ " '" a, : '. ''?" ,~~'.
J ___ ~
~:....:_....:'_..:l, J;;--
"'~-"::::-::::.:;:::-
:...~r",L..--_
, "
o ,
Bike racks,
13
June 2007
Virginia Mason Medical Center-.335011sIWay South
Existing and planned land use conditions: This worksite is located in an office park zoned area.
There are no proposed changes to land use in this
area.
Existing and planned transportation This worksite is located on
facilities:
There are no proposed changes to the transportation
facilities in this area.
Existing and planned transit services and This worksite is located near King County Metro route
facilities: . 903. This work site is also serviced by the Dial-a-Ride
shuttle,
There are no proposed changes to transit service in
this area.
Existing parking conditions: There is free and ample parking for employees and
visitors.
~.. ~
I
I
I
City of Federal Way 14 June 2007
Draft Commute Trip Reduction Plan
Virginia Mason Medical Center - 33501151 Way South, Federal Way, WA 98003
..... '"
',,;'}fjl
'~r,~ll' 1']'; 'I :\
, J, -'.. -
~"~~~~Jl ~I~~~~~~-
Building entrance
'"
')~
~
Intersection at 336'0 Street
lCr.of,Federal Wa
ID Number:
Total Number of Employees:
Affected CTR Employees:
2011 Drive Alone Goal:
2011 VMT/Employee Gocil:
Services Available:
Bus Routes:
Parkin :
-_ -.;;:r.~ .
"
. l "
::-- ""':"-- -
Parking lot
(~
~ .~..
..fj ~-
~lt j J:-- _, ':-
,~, 'OC_. ~,,'
'J ~ .~. ;.~o ~ ~
t: ," (,
i t
~ '
Bus stop
Vii'--,nlli Masol1MediGal6eAter
E89706
270
125
79%
8 Miles/day
King County Metro
Metro Routet 903
Free and am Ie arkin available
City of Federal Way
Draft Commule Trip Reduction Plan
June 2007
15
Financial Pacific Leasing - 3455 S 344lh Street
Existing and planned land use conditions: This worksite is located in an office park zoned area.
There are no proposed changes to land use in this
area.
Existing and planned transportation This worksite is located on a principle collector with a
facilities: sidewalk.
This road is slated to be widened to th~e lanes with a
bike lane.
Existing and planned transit services and This worksite is located near Sound Transit route
facilities: 565.
Thereare no proposed changes to transit service in
this area.
Existing parking conditions: There is free and ample parking for employees and
visitors.
City of Federal Way
Draft Commute Trip Reduction Plan
16
June 2007
Financial Pacific Leasing, LLC - 3455 5 344th Way, Federal Way, WA 98001
:''''cfJI t:~
':".....~
Building
Vanpool parking
'Gi ,of,FedeFal Wa
ID Number:
Total Number of Employees:
Affected CTR Employees:
, 2011 Drive Alone Goal:
2011 VMT/Employee Goal:
Services Available: '
Bus Routes:
Parkin :
Parking lot
~-071
e.'~~j=
, a
", J 1'iJ"
;- ,. ,_ ~..:~.&..a,-. ~~ "
<I',,::o..-~..-' ....' _ 0<".. ..
'~:~ f- -~""=-.~~-
~":...:.~~-:~;..~~'~ ~ ~
.C" ,
~';_fu~:::..'
,_ .1
Sidewalk and driveway
, ", ' ,financiall?aeifie Leasin
E87890
124
121
71%
12 Miles/day
Sound Transit
ST 565
Free and am Ie
;;;:
~,,'
" ,. '~""a ","i
~ '1
1
--..l
City of Federal Way
Draft Commute Trip Reduction Plan
June 2007
17
EDS - 32275 32nd Ave South
Existing and planned land use conditions: This worksite is located in an office park zoned area.
There are no proposed changes to land use in this
area.
Existing and planned transportation This worksite is located on a minor arterial with
facilities: sidewalks.
This roadway is proposed to be widened to five lanes.
and a bike lane.
Existing and planned transit services and This worksite is located near Sound Transit route
facilities: 565.
There are no proposed changes to transit service in
this area.
Existing parking conditions: There is free and ample parking for employees and
visitors.
City of Federal Way
Draft Commute Trip Reduction Plan
18
June 2007
EDS- 32275 32nd Avenue South, Federal Way, WA 98063
__....u._.~"""'-'--'
r~ :-~
.J;~'~i .~. -~-;' ~~=~
'" '" .
, ~n';:'
. <> - - .' - . ~~-' ...,
-~ - ,- -~~
,~
,~ ,-'-'"
: ~~'----
~'~
i
"''.::.,.,...:;:
\\.1
___ J
~ 'L... ='--
Building entrance
Q~'.':o I,t:, ~ "G
!:!ill. It,
u::,'"
.-~;~
>~:ri!1._ '\l
, ~
<;,r.:.
"~
.,::. .~
~ -,
" '
Q....c~ ... '
\tl' , ' "
~
~-,o
\
Pedestrian footpath
~Ci ,of Federal Wa
ID Number:
Total Number of Employees:
Affected eTR Employees:
2011 Drive Alone Goal:
2011 VMT/Employee Goal:
Services Available:
Bus Routes:
Parkin :
eo,;
i;
~, ~
0. ~~'- '!~~~-o ;.: ~~
.:;"
~, '
~" _...........::. ~
~:;~~'~,~"
:.:.t...__ .-":"-'--"" I
Parking lot
_^"r- .
VanpoOI parking
ED'S, .
E89169
115
109
58%
11 Miles/day
Sound Transit
ST 565
Free and am Ie
City of Federal Way
Draft Commute Trip Reduction Plan
19
June 2007
Weyerhaeuser Corporate - 33663 Weyerhaeuser Way S.
Existing and planne~ land use conditions: This worksite is located in an office park zoned area.
There are no proposed changes to land use in this
area.
Existing and planned transportation This worksite is located on a minor arterial with
facilities: sidewalks.
This roadway is proposed to be widened to five lanes
and a bike lane.
Existing and planned transit services and This worksite is not located within a Yt mile.of a bus
faciliiies: stop, but the closest route serving the southern
portion of the campus is Sound Transit route 565.
There are no proposed changes to transit service in
this area. ,
Existing parking conditions: There is free and ample parking for employees and
visitors.
City of Federal Way
Draft Commute Trip Re.duction Plan
20
June 2007
Weyerhaeuser Corporate - 33663 Weyerhaeuser Way South, Federal Way, WA 98003
.":: ~ "--"
6':;, ~".-,
.~~
~""'
. .
.' ,"~-,7' ,,'
" -. ,.,~ -...",,-~. '~.".
~.:: ~t .~.."'. .', ':.
'. ~<.;'1',J'"'" ~..., j
;~~~' ,..;~\~.;c,~~~~ '''.:..l~,t
- '~~... ,..,""-~~j. ol
,,"1\ ".~~ ..;'~:^<~ :;'~;:'-J
\~-~:;',. ',~\!
. "
'"
~."-
Q;~"
"., .,
- ,'.:2j ,
r/;'. ."
dil .~
"~ "ill'
.' - %i
~" ~'\'::'..-<
'R ., ,":.-
. , .
I ~
l ;--J '- 'V
"::0,
.. -:.~<=, J """_'~':'l,fV;J ~~~~=-:.."
'-:'= ~ -=-S::'='--
Q~T",~,,;::-,
I'i
h
ril~~"'~~r~':""".
Directory board at entrance
Parking lot
, ;J. ....
, ';:'~
" ~. "~-="-'L,,-, :j
. .~~~ ....- '0. '. .... '.- ~.~
.'~ ..... ,-~~.".
n " I' '.
'91 Q ~\!
~(
.\;f~l '\, "I' ~~:-::n
7~)1~'~1~~,~ ;~>~ ", .. .~,
:,'" -'1', ~ % _ Ol,~
~~ >~a; u <Wi.... ~ ,C"~'\
'I;~ I,"'" ". -' . , ,
. ~', '-~ ~" .,. i!/~t,-
~? II '0 ~":'" 0 'it ~ _~.
(J" .... ".;:.' t:", :~,-
-', -. ~ ~..~-:}
~~3;"'-~~~~',~
Carpool parking
Bus stop
;€i of, Fedenli Wac ' ,
ID Number:
Total Number of Employees:
Affected CTR Employees:
2011 Drive Alone Goal:
2011 VMT/Employee Goal:
Services Available:.
Bus Routes:
Parkin :
....:.
City of Federal Way
Draft Commule Trip Reduction Plan
21
June 2007
Weyerhaeuser East Campus 111- 33940 Weyerhaeuser Way S.
Existing and planned land use conditions: This worksite is located in an office park zoned area:
Existing and planned transportation
facilities:
Existing and planned transit services and
facilities:
Existing parking conditions:
City of Federal Way
Draft Commute Trip Reduction Plan
There are no proposed changes to land use in this
area.
This worksite is located on a minor arterial with
sidewalks.
This roadway is proposed to be widened to five lanes
and a bike lane.
This worksite is located near Sound Transit route
565.
There are no proposed changes to transit service in
this area,
There is free .and ample parking for employees and.
visitors.
22
June 2007
Weyerhaeuser East Campus 111- 33940 Weyerhaeuser Way South, Federal Way, WA 98003
,~: ~J' :l~ :~'~ G
t ~\~ ~ &
"- "" - ~:"'cl
cJ---= - - ~'" ~ _ :(
;r--~o
-1 '';(ii!~.
.~ . .
'"
['
t
"
Building entrance Parking lot
,JI
..
=.,~
~ c.,.j,~
"'/~
:r\O l~Q~~~'~-
"
'"
Bike racks
~€i . of. Federal Wa
ID Number:
Total Number of Employees:
Affected eTR Employees:
2011 Drive Alone Goal:
2011 VMT/Employee Goal:
.Services Available:
Bus Routes:
Parkin :
Vanpool parking
We .erhaeuset-Easf~am .usifli"
E88260
1321
829
72%
11 Miles/day
Sound Transit
5T 565
Free and am Ie
City of Federal Way
Draft Commute Trip Reduction Plan
June 2007
23
Weyerhaeuser North Buildings I & 11- 32275 32nd Ave S.
Existing and planned land use conditions: This worksite is located in an office park zoned area.
There are no proposed changes to land use in this
area.
Existing and planned trarisportation This worksite is located on a minor arterial with
facilities: sidewalks.
Thisroadway is proposed to be widened to five lanes
and a bike lane.
Existing and planned transit services and This worksite is located near Sound Transit route
facilities: 565.
There are no proposed changes to transit service in
this area.
Existing parking conditions: There is free and ample parking for employees and
visitors.
City of Federal Way
. Draft Commute Trip Reduction Plan
24
June 2007
Weyerhaeuser North Buildings I & 11- 32275 32nd Avenue South, Federal Way, WA 98001
-,J#.>JfJ'
"S~'~<''i"'"
'" ' di" ~3&:,^i ""
,^.: "1-'1' ,.'~\, ~ r-- ~i'
I '~'.;':~
d1 .~ ... ~ -.
"
':
~~~=-~ ---
Driveway entrance
~- ,
, . ,rl&f1~:,~" ' :,'
J,.: :.,\. ,~~~"". '. 'I"'" ',' .~ I
.' . (.~ ~
. . '. . '3., '~i -\, ':::;
, . ~,.~ .~ ,
~ ~. :rcJ\"_,':.c~,,------.I:li 'L
.t:""-~~~"1~ :)j
,-,~" ,~. ~~ · -"-1
~;~-'~" '- -~~ .. :~~~~~~---~'
~~~ ~----:
Parking lot
ei : of, Federi:liiWa',' , "
ID Number:
,Total Number of Employees:
Affected CTR Employees:
2011 Drive Alone Goal:
2011 VMT/Employee Goal:
Services Available:
Bus Routes:
Parkin :
I
"
~, -'---\;,.
.--'";,
..... -,
I;:; _
'! ~
'>l !:~" I. fi' 4\
_. . '.....0.
Employee shuttle stop
:'\
r--- 'T'
, \
I \
I
32"" Avenue South
We "e,rhaeuseFNorth Suildin ~ I & II' ".~' \ "
E80510
783
'495
70%
10 Miles/day
Sound Transit
ST 565
Free and am Ie
City of Federal Way
Draft Commute Trip Reduction Plan
25 June 2007
Weyerhaeuser Northwest Plaza - 840 S. 333rd Street
Existing and planned land us'e conditions: This worksite is located in an office park zoned area.
There are no proposed changes to land use in this
area.
Existing and planned transportation This worksite is located on a collector street, near a
facilities: principle arterial with a sidewalk.
The principal arterial is slated to be widened to four
lanes.
Existing and planned transit services and This worksite is located near Sound Transit route
facilities: 565.
There are no proposed changes to transit service in
this area.
Existing parking conditions: There is free and ample parking for employees and
visitors.
City of Federal Way
Draft Commute Trip Reduction Plan
26
June 2007
Weyerhaeuser Northwest plaza - 840 S 333rd Street, Federal Way, WA 98003
""-'" ,
/.-.
"d~."
J'I
i
I
'0
-,,~.
".l;',,"
" ^
, . 0'" -'1" 'f-~--I'
Driveway entrance
Q:,"
-'-'-.-~":""_......... -,,~--"--
. .. - . .--.-
-=-'..'-~---,---.~-~'~.:~ >-
-----.--
Crosswalk
E~ ,of Federal Wa
10 Number:
Total Number of Employees:
Affected CTR Employees:
2011 Drive Alone Goal:
2011 VMT/EmplQyee Goal:
Services Available:
Bus Routes:
Parkin :
City of Federal Way
Draft Commute Trip Reduction Plan
Parking lot
Vanpool parking
We ^erhaeus~r';Nor;t6w.es,tl'.laza
E80313
117
114
72%
12 Miles/day
Sound Transit
ST 565
Free and am Ie
27
June 2007
Weyerhaeuser Technology Center - 32901 Weyerhaeuser Way S.
Existing and planned land use conditions: This worksite is located in an office park zoned area.
There are no proposed changes to land use in this
area.
Existing and planned transportation This worksite is located on a principle collector with a
facilities: sidewalk.
This road is slated to be widened to thee lanes with a
bike lane.
Existing and planned transit services and This worksite is located near Sound Transit route
facilities: 565.
There are no proposed changes to transit service in
this area.
Existing parking conditions: There is free and ample parking for employees and
visitors.
("
City of Federal Way
Draft Commute Trip Reduction Plan
28
June 2007
Weyerhaeuser Technology Center - 32901 WeyerhaeuserWay South, Federal Way, WA
98003
Building enlrance
'~"'~~' ". .'~"
". .' ~. . ,; .
.0.
0,
"
~~ =' ,.~-'~... . '= ='-~.
. ~.ui"~':'--~J'~"-
~_: ~~~~~t
~~,\,~
'~
Vanpool parking
Ci of Federal Wa
10 Number:
Total Number of Employees:
Affected CTR Employees:
2011 Drive Alone Goal:
2011 VMT/Employee Goal:
Services Available:
Bus Routes:
Parkin :
4
Parking 101
'::. ~.-r,:'.. "'F~ \'~
~: " ,,.; ~
. .0;.,.... ,,"u~,::J. ~,,_., . "
.' ~ ~ -..~. '!:i.'::,t-. ....
J . "'[ ':/ . I&~., - , ~
~~, ~~ .:~_.:E'~"~~~
",,~~,_'""'l'--'
'~,:'::~~~3~ ;'
... ~'~"
;::r.
,J,'~.'
~~f .;
Pedeslrian fool path
Weerhaeuser Technolog
E80572
735
588
59%
10 Miles/day
, Sound Transit
8T 565
Free and am Ie
City of Federal Way
Draft Commute Trip Reduction Plan
29
, June 2007
;$.upp6r{i~~iC"~il)~reh~"h~IV,ePI~riiPdildli$'; ".
The City reviewed its current Comprehensive Plan to identify policies and goals that support the
City's CTR program. The most current version of the City of Federal Way's Comprehensive Plan
was adopted on July 2002. The City has a number of policies and goals that support CTR which
are described in their land use and transportation elements. They include:
City of Federal Way land Use Element
The City of Federal Way has designated two City Centers - the City Center Core and City
Center Frame. The creation of an identifiable and vibrant "downtown" is one of the
primary goals identified by the Comprehensive Plan. The policies of the Land Use and City Center
chapters envision a concentrated City Center comprised of mixed-use developments, pedestrian-
oriented streetscapes, livable and affordable housing, a network of public spaces and parks, and
development of superior design and quality.
City of Federal Way Transportation Element
The City of Federal Way Transportation Element has a number of pOlicies and goals that support
CTR, including the development of a multi-modal transportation system, non-motorized system and
transportation demand management. Described below are the goals and policies trom the
Transportation Element that support CTR:
Multimodal Transportation
TP29 Reduce reliance on the single occupant auto by prioritizing and implementing supportive
local-level transit, HOV, and non-motorized improvements.
TP30 Identify and plan for multi-modal freeway, arterial, and collector street improvements which
ensure. more efficient use of existing roads and enhancement of HOV, transit, and related non-
motorized operations. . .
TP31 Integrate the traffic circulation network with high capacity transit, HOV, bicycle, and,
pedestrian networks with consider.ation to regional system needs, including air and port facilities.
TP32 Structure the City's improvement program to strategically place increments of public and
private investment that complement the multi-modal vision of the plan. This should include
"matching" improvements to supplement the efforts by other agencies to provide HOV and transit
facilities. .
TP33 Acquire rights-ot-way for high capacity transit whenever possible in advance of their need,
and make accommodations for any improvements, whether public or private, to provide for future
high capacity transit needs without major redevelopment (e.g., locate structures so they would not
need to be altered to accommodate future high capacity transit facilities).
Non-Motorized Transportation
City of Federal Way
Draft Commute Trip Reduction Plan
30.
June 2007
Non-motorized transportation facilities will be increasingly important to the City in meeting the
travel needs of its residents and workers and to reduce our dependence on automobiles. The
pedestrian and bicycle systems can be implemented through a prioritized series of improvements
to complement.lhe transit, and HOV systems as well as create a key link to business, cultural,
recreational, and residential elements that are a part of the FWCP Vision.
Goals
TG4 Enhance community livability and transportation by providing a connected system of
pedestrian and bicycle ways that is integrated into a coordinated regional network.
Policies
TP50 Provide sidewalks on both sides of all arterial streets as funding allows. Provide a one-mile
grid of bicycle faCilities connecting major activity centers, recreational facilities, and schools.
TP52 Incorporate pedestrian and bicycle features as design elements in the City Center as
reflected in the FWCP Vision and City Center Street Design Guidelines.
TP53 Ensure that City facilities and amenities are ADA compatible.
TP54 Work to extend the existing system of sidewalks, bikeways, and equestrian ways in the city
to provide safe access to public transit, neighborhood and business centers, parks, schools, public
faCilities, and other recreational attractions.
TP55 Work with other agencies, particularly relating to regionally significant facilities! to pursue
funding for pedestrian and bicycle amenities.
TP56 Inform and educate the public on safety and use of non-motorized facilities.
TP57 Ensure non-motorized facilities are safe and well maintained.
Transportation Demand Management
The Transportation Element acknowledges the City's CTR ordinance and describes
recommendations and goals for supporting CTR:
1. Encourage voluntary expansion of the CTR Program to employers of less than 100
employees. The encouragement by employers may be as diverse as subsidized bus
passes, car pool space priority, bike racks, shower facilities, van pools, car pool
information access, telecommuting, variable work hours, etc.
2. Encourage the formation and expansion of area-wide ride-sharing programs. Such
programs operate with little direct cost to the City and are highly cost-effective.
3. Facilitate the creation of Park and Ride facilities and tran'sit centers to supplement
the regional system, either directly through acquisition of property or indirectly
through development conditions where employer vans are required to shuttle
employees to Park and Ride facilities or transit centers.
4. Facilitate enhancements to the HOV System. This may include the acquisition of
property for HOV lanes, construction of arterial HOV lanes on City arterials and
State highways, and priority treatments for buses at traffic signals. At the very
least, opportunities to support improved access to the State system of HOV lanes
should be identified and supported.
City of Federal Way
Draft Commute Trip Reduction Plan
31
June 2007
Through TOM options, the City recognizes it can maximize the effectiveness of the public
investment dollar. Many jurisdictions are finding non-construction, or management actions, critical
to the overall achievement of congestion management and protection of neighborhoods.
As such, the TOM goals for Federal Way can be expressed as follows. .
Goal
TG5.
a. Employ and promote the application of non-construction, and transit/HOV construction actions to
preserve and enhance mobility and assist in achievement of the land use vision.
b. Develop methods to successfully measure and achieve the foJ/owing HOV & Transit mode split-
levels by the year 2010:
. 15 percent of all daily trips over one mile in length;
. 30 percent of all work trips; and
. 40 percent of trips between major activity centers.
c. Assist all CTR affected and voluntary employers in the Federal Way planning area to achieve the
Commute Trip Reduction Act travel reduction goals.
d. Ensure that all members of the community, including those with transportation disadvantages,
have viable travel options or alternatives.
Revised 2003 111-65
Use transportation demand management to help achieve an appropriate arterial
level of service that balances the economic, ecological, accessibility, and
livability needs ofthe City's residents, consumers, employers, and employees.
,;.;
Policies
TP58 Support the achievement of City and regional mode split goals through encouragement of
local and regional work at home and transportation coordination programs such as ride matching
services and van pools.
TP59 Support other transportation demand management programs that can be shown to be cost-
effective in achieving plan goals, while allowing residents and employers discretion to choose the
methods they wish to employ. .
TP60 Develop an arterial street HOV system and related enhancement, which complements the
regional freeway HOV system, through the following actions:
. Place emphasis on the development of HOV and transit priority improvements; especially those
requiring minimal cost or construction. These improvements should pace the extension of the
regional system and minimize the gap between traveler needs and system capacity.
. Establish an urban traffic control system that gives priority to buses and HOVs.
. Establish policy that when arterials require more than four through lanes to maintain the adopted.
LOS, additional travel lanes will be for HOVs. As HOV lanes reach the adopted LOS standard,
increase the vehicle occupancy requirements for their use (e.g. increase from two or more to three .
or more occupants). LOS will then be calculated by the average delay per person.
TP61 Provide improved operational efficiency to the City's transportation system and support
regional monitoring programs through regular, structured reporting, monitoring, and performance
evaluation.
TP62 Modify the development review process by:
). l
City of Federal Way
Draft Commule Trip Reduction Plan
32
June 2007
, Incorporating revised impact analysis procedures that comply with GMA concurrency and other
requirements, The revisions need to include revised level of Service standards.
. Streamlining it to the extent possible to minimize private development costs, Where
develop"ments are consistent with this plan, they should be allowed to proceed by mitigating site
impacts; developing appropriate components of the HOV, transit, non-motorized and motorized
chapters; and participating in an equitable citywide improvement funding or mitigation payment
program. 'Incorporating requirements of the Americans with Disabilities Act.
, Requiring explicit consideration of pedestrian and bicycle circulation, as'
well as parking and general circulation needs.
TP63 Adopt a flexible level of service standard which employs a measurement factor that
accommodates pemand management to help balance likely levels of growth, with opportunities to
create a multi-modal transportation system.
TP64 Encourage non-motorized improvements which minimize the need for residents to use
motorized modes by providing: 1) access to activity centers; 2) linkage to transit, park & ride lots,
and school bus networks; 3) completion of planned pedestrian/jogging or bicycle trails; and 4)
designating a network of streets that can safely and efficiently accommodate bicycles.
TP65 Enhance a non-motorized system by the following actions:
. In instances where the citywide system of bike lanes, trails, and sidewalks crosses or abuts new
development or redevelopment, consider requiring the developefto mitigate the impact of the
development on the City's transportation system by constructing bike lanes, trails, and sidewalks
that interface with the existing system.
. Coordinate development of the non-motorized system with surrounding jurisdictions and regional"
system extensions.
, Extend the existing system of City sidewalks to all streets.
TP66 Recognize that TOM requires coordination, and work with regional representative and other
adjacent communities to develop coordinated TOM strategies,
Review of Comprehensive Plan Policies
Appendix G includes an analysis of the comprehensive plan goals and policies that support eTR.
The CTR Planning Guide included a list of goals and policies that CTR-affected jurisdictions should
incorporate into their comprehensive plans. The analysis shows that there are a number of goals
and policies that are not yet incorporated in the Federal Way Comprehensive Plan. During the
next update cycle, the appropriate steps could be taken to create a stronger basis for the City's
eTR program.
rSUlmortil1l9 lIransit I?lan Policies at:ld P,rogram$
I
Public transit service is provided to area residents by a combination of fixed-route,
express, dial-a-ride, and subscription bus services. King County METRO serves the City
directly, while Pierce Transit buses provide connections from the Park and Ride lot on 1-5
at South 320 th to Tacoma and Puyallup. Sound Transit serves the Federal Way and Star
lake Park and Ride lots with regional express buses between SeaTac and Tacoma, and
between Federal Way and Bellevue. METRO and Pierce Transit provide bus and park & ride
facilities to Federal Way. "
City of Federal Way
Draft Commute Trip Reduction Plan
33
June 2007
Sound Transit is reviewing a high capacity transit system alternative for a second phase. The City
plan identifies stations/transit centers on or near the 1-5/SR-99 corridor ai South 272 nd Street,
South 316 th Street, South 336 th Street, and Souih 3481h Street. Until light rail transit is extended
to Federal Way, the transit centers would be for bus transit only. The integration of the road system
for vehicles and buses with high capacity transit is incorporated into this plan,
Specific projects that are planned are:
. Federal Way - Seattle
New peak period, peak direction commuter service between the new Federal Way City
Center transit center/P&R and downtown Seattle, operating every 6 to 15 minutes.
Supports new P&R capacity in Federal Way planned by Sound Transit.
. Twin Lakes - Seattle
Improves service levels between the Twin Lakes P&R and the South Federal Way P&R;
. operate every 7 to 15 minutes. Supports new P&R capacity in the Twin Lakes area of
Federal Way.
· Link LRT: Extension from S 272nd Street to Federal Way Transit Center via SR 99
Continue extension of the Central Link light rail. system for approximately 2.8 miles from S.
272nd Street to Federal Way (S. 317th St) in the vicinity of existing Federal Way Transit
Center, including a new station in Federal Way. The project will include all necessary
components such as infrastructure, systems, and stations. For prototypical costing
purposes, the alignment is assumed to be aerial primarily along SR 99. The
final alignment and station locations will be determined through project level design and
environmental review. Prototypical cost estimates for the alignment are presented
here.
· Link LRT: Extension from Federal Way Transit Center to S 348th Street via 1-5
Construct an extension of Link light rail transit from Federal Way (vicinity of the existing
Federal Way Transit Center) to South Federal Way. For prototypical cost estimation
purposes, the line is assumed to be a mix of aerial, at-grade and retained cut and fill
primarily along the western edge of 1-5, and would include a new station in the vicinity of 1-
5 and S 348th Street. .
City of Federal Way
Draft Commute Trip Reduction Plan
34
June 2007
II. and III. BASE.L1NE AND GOALS FOR 2011
The goal of the CTR program is to reduce drive alone vehicle use and vehicle miles traveled
among employees who work in CTR-affected worksites by 10% and 13% respectively. The targets
are based on the most recent CTR work site drive alone and vehicle miles traveled rates.
The target was established by taking the most recent drive alone rate and multiplying the rate by
10%. This number was then subtracted from the most recent drive alone rate and the result
established the target for 2011.
Drive Alone Target = Most recent drive alone rate - (Most recent drive alone rate:> .10)
Vehicle Miles Target = Most recent VMT - (Most recent VMT > .13)
" I . I
(ifj~~ ~ ~
~ ~ \Y.li.ill
City of Federal Way Reduce Reduce
(overall) 0.81 by 10% 11,64 0.73 by 13% 10.12
" I. I
~ ~
~ ~ \Y.li.ill
St. Francis Hos ital 0.74 9.11 7.92
U.S Postal Services 0.82 11.38 9.90
Federal Wa Cit Hall 0.73 11.59 10.08
World Vision US 0.77 12.87 11.19
Ber er/ABAM 0.73 10.97 9.55
. Virginia Mason Medical
Center 0.79 9.66 8.40
Financial Pacific Leasin 0.71 14.13 12.29
EDS 0.58 12.53 10.90
0.69 11.73 10.21
0.72 12.10 10.53
0.70 11.67 10.15
City of Federal Way 35 June 2007
Draft Commute Trip Reduction Plan
1&"
Weyerhauser Northwest
Plaza
Weyerhauser Technology
Center
City of Federal Way
Draft Commute Trip Reduction Plan
0.80
0.66
36
by 13%
Reduce
2 13.32 by 13% 11,59
Reduce
9 11.01 by 13% 9,57
June 2007
-----------
0.7
0.5
IV. STRATEGIES FOR ACHIEVING GOALS AND TARGETS
P6t~n~i~l;).[el)'9Q~.~fQ.~ the~Jt}ftoi:iiiPil1~tl~: ~a.~tij.r~' . ... '.. ..
.. . '.~ ',~" :., ~>-, .' .. >.....,
To help make progress towards reaching the City's CTR goals, the City explored different
strategies. The following potential strategies were identified that would help the City achieve its
2011 goal. The City would perform these strategies in coordination with King County Metro and
other South King County jurisdictions .
· Parkina
To increase the percentage of commuters using transit, vanpool, carpool and non-
motorized forms of transportation, the City will work with CTR employer.s to
implement a parking management program, such as implementing preferential
parking for carpools and vanpools and reducing parking capacity. The City will
also review its current policies and development code for parking requirements
and possibly identify changes that could help reduce drive alone travel.
· Transit
Sound Transit and King County Metro operates transit services in the City of
Federal Way. Currently, less than 1 % of commuters who travel to CTR-affected
work sites use transit. To increase the transit ridership at CTR-affected work sites,
the City will work with transit providers to enhance transit services to make transit
more accessible and convenient to commuters. The City will work with Metro and
Sound Transit to extend service hours, increase coverage, expand span of service
and make transit stops more accessible to work sites,
· Create Local Networkina Opportunities for CTR-affected Work Sites
To increase opportunities for ridesharing and creating partnerships between
employers, the City, in coordination with King County Metro, will create local
networking opportunities for affected employers. Local networking with other
CTR-affected employers and businesses will offer opportunities to discuss CTR
and transportation issues, coordinate ridematching services, conduct joint
commute options promotions, and offer coordinated programs that can b.enefit
their employees.
~,.,
· Land Use
The City will implement its current land use policies that encourage the
development of its City Centers. Employers will be encouraged to locate in the
Centers where higher levels of services, such as transit, non-motorized and TOM
programs are offered.. Higher densities will be allowed which will help increase
transit. van pooling and ridesharing activities.
City of Federal Way
Draft Commute Trip Reduction Plan
37
June 2007
· Employer Assistance
To help CTR-affected and other business work sites, achieve their goals, the City
and King County Metro will continue to provide assistance to employers with
implementing their programs. King County Metro will help promote CTR programs
at work sites through a variety of services and preparing public information
materials. .
· Manaqement Support and ETC trainino
The City, in coordination with King County Metro. will work with.~nterprise Seattle,
chambers of commerce and other business organizations to increase support for
CTR programs. It will also develop guidelines for Employee Transportation
Coordinators and provide training to help them implement their programs.
· Work with Developers to hnplement Transportation Manaqement Plans
Through the City's development review process. the City will encourage
developers to implement various TOM measures that will help encourage
commuters to use non-drive alone alternatives. TOM measures include installing
commuter information centers. preferential parking for carpools and van pools.
offering transit pass discounts. and using pedestrian-friendly design that
encourages transit use.
City of Federal Way
Draft Commute Trip Reduction Plan
38
June 2007
'Recoilltb~@e9'Sti1!tegjeW1~:~~i}1~l/,~(fo.~lr: ~:; ,':'"
Based on the feasibility of implementing various potential actions that were identified, the following
strategies are planned that will help the CTR-affected work sites make progress towards their 2011
goal. These strategies will be performed in coordination with King County Metro and other South
King County cities.
. filll!lo., . ,
Implement City's Vision for Federal
Wa 's Ci Centers
Employer Notification and
Enforcement
ETC Trainin and Guidelines
Amend Comprehensive Plan to
include language about the CTR
Efficienc Act
City of Federal Way
Draft CommuleTrip Reduction Plan
, {)eseription
The City of Federal Way has designated two City
Centers that includes visions for higher density
mixed-use development that is supportive of
transit, rideshare, pedestrian and bicycle use. The
City will work to implement this vision which will
support CTR-affected work sites efforts for
meetin their CTR oals.
The City will work to improve the system of how
employers notify the City when they become
affected by the CTR Law and how existing CTR
affected employers notify the City about program
chan es.
The City will work with Employer Transportation
Coordinators (ETCs) to implement successful CTR
programs. ETCs will be responsible for
coordinating annual fairs, conducting promotions,
distributing information, notifying the jurisdiction
about program changes, and reporting employee
numbers. The City will work with employers to
ensure that ETCs are given adequate time and
support to be successful to meet their goals. This
includes enforcin existin uidelines for ETCs.
The City will review its Comprehensive Plan and
add new policies to correspond with its CTR plan,
if necessar.
The City will work with developers to implement
TOM elements in new development, including
commuter information centers, preferential parking
for carpools and van pools, bike lockers, showers,
bike racks, and bus stops. The City will require
develo ers to work with Kin Count Metro earl
39
June 2007
"Strat
iilll!l ~
Transit Services
Sound Transit Services
Park and Ride Lots
Van 001 Services
Car 001 Services
Enhance Bicycle and Pedestrian
Facilities
T elework Pro ram
City of Federal Way
Draft Commute Trip Reduction Plan
IDescri, tion
in the plan development process to ensure transit
oriented design occurs.
. King County Metro will continue to provid6"transit
. services toCTR work sites, where service is
curren y aval a e. mg oun y e ro WI ma e
service enhancements based on its updated Six-
Year Transit Develo ment Plan.
The City will work with Sound Transit to implement
additional services on Regional Express Bus .
services.
The City will work with King County Metro to
expand the King County park-and-ride lot system.
The City and Metro will explore leasing parking
lots for park and ride and adding capacity at
existing park and ride lots where the usage
exceeds ca acit .
King County Metro will target adding 2 new vans
er ear between 2007 and 2011.
The City and King County Metro will continue to
encourage carpooling and van pooling through the
use of www.rideshareonline.com.
The City will work with major employers to
encourage the provision of amenities such as bike
lockers, access to shower facilities and changing
facilities to increase usage of non-motorized
trans ortation.
The City will work to improve its system of bicycle
and pedestrian facilities. As part of its Capital
Investment Program, the City will add new bike
lanes and pedestrian facilities that will increase
walkin and bic c1in .
The City will work to create a telework education
program that would increase employer knowledge
on how to implement telework at their work site, if
applicable. The program includes education on
human resource policies and information
technology assistance to allow employees to work
from home.
40
June 2007
Strat Des~ri tion
The City will work with King County Metro to
expand Vanshare usage as appropriate. This
program will help commuters (1) travel from a
home area to a transit center or park-and-ride lot
where they will connect with transit or (2) from a
transit center or park-and-ride lot to their
destination after having used a bus or the train to
that location. Vanshare travel a maximum of less
individuals who use a mass transportation mode to
VanShare Pro ram or from the vanshare location.
The City will work with employers to encourage
them to offer alternative and flexible work
schedules for their employees, including
Alternative and Flexible Schedules com ressed work weeks.
King County Metro will provide a limited number of
rides to non-drive alone participants from their
work site to their home in the case of an
Guaranteed Ride Home emer enc .
The City will provide assistance to affected
employers to help them meet the requirements of .
the CTR Efficiency ACT and implement their
ro rams.
· tillr!J~
Management Su ort
The City and King County Metro will work with
CTR worksite managers and owners to educate
them about the benefits of CTR to their
or anizations.
The City, in coordination with King County Metro,
will encourage employers to offer subsidy
programs to persuade employees to shift to non-
drive alone commute modes. Examples include
six-months of free van pool participation, transit
pass subsidies, and gift cards for starting a
car 001.
The City will work with King County Metro to
expand education efforts to CTR employees about
alternative commuting including workshops,
information brochures, and advertisin .
Subsidies
Marketing and Education
Promotional Events
The City will work with King County Metro and
ma'or em 10 ers to conduct on site romotions,
City of Federal Way
Draft Commute Trip Reduction Plan
41
June 2007
Strate
Descri tipn
transportation fairs, and activities to increase
awareness and use of commute alternatives.
. Networkin 0 ortunities
The City and King County Metro will work with the
major employers to create networking
opportunities to discuss CTR issues, coordinate
ridesharing programs, and conduct joint
romotional efforts.
City of Federal Way
Draft Commute Trip Reduction Plan
42
June 2007
V. REQUIREMENTS FOR MAJOR EMPLOYERS
. A CTR-affected employer is an employer that has 100 or more employees that arrive at a site
between 6 and 9 a.m, Each CTR-affected employers is required to reduce their drive alone trips by
10% and vehicle miles traveled by by 13% during a four-year period. In addition, CTR-affected
employers will be required to implement the following program elements:
Designate Employee
Transportation
Coordinator
The Em 10 ee Trans ortation Coordinator is the oint of contact
between the ~mployer and its workforce to implement, promote and
administer the organization's CTR program. He/she is also the poin't of
contact between the employer and the local jurisdiction to track the
employer's progress in meeting CTR requirements
Affected employers will be responsible for providing adequate training
for the ETC, allow them to attend networking meetings, and provide
them with the necessary time to administer the program.
Employers will be encouraged to select an employee for this role who
is hi h enou h in the or anization to effect chan e.
Information about commute alternatives will be distributed at least
monthly to employees. Information packets will be distributed to new
employees at CTR-affected work sites. Examples of information that
will be distributed will include:
Regular Distribution of
Information to
Employees
CTR Reporting
· Description of the employer's commute options program
· Transit system maps and schedules
· Van pool information
. Weekly traffic alerts
· Wheel Options campaign promotional materials
· Other timely promotional materials
Once a year, the employer is required to complete the Employer
Report and Program Description Form to determine if progress is being
made towards achieving the goals. Reports will be submitted to the
Cit.
Biennially, the CTR affected employers shall distribute and collect
Commute Trip Reduction Program Employee Questionnaires (surveys)
to achieve at least a 70 ercent res onse rate.
The employer is required to implement a set of measures that are
designed to increase the percentage of employees using some or all of
the following modes:
CTR Survey
Implementation of a Set
of Measures
· Transit
City of Federal Way
Draft Commute Trip Reduction Plan
43
June 2007
· Van pool
· Carpool
· Bicycle or walking
· Telework, Compressed Work Week, or Flexible Work
Schedule
· . Other non-drive alone vehicle modes
Measures to reduce drive alone trips and vehicle miles traveled
include, but are not limited to:
· Provision of preferential parking or reduced parking charges
for high occupancy vehicles
· Instituting or increasing parking charges for single-occupant
vehicles
· Provision of commuter ride matching services
· Provision of subsidies for transit fares
· Provisions of vans for van pools
· Provisions of subsidies for carpooling or van pooling
· Provision of car sharing services
· Permitting the use of the employer's vehicles for carpooling or
van pooling
· Permitting flexible work schedules
· Establishment of a program of alternative work schedules such
as compressed work week schedules (such as 4/40 or 9/80)
· Cooperation with transportation providers to provide additional
regular or express service to the worksite
· Construction of special loading and unloading facilities for
transit, carpool, and van pool users .
· Provision of bicycle parking facilities, lockers, changing areas,
and showers
· Provision of a program for parking incentives such as a rebate
for employees who do not use the parking facility
· Establishment of a program to permit employees to work part
or full time at home or at an alternative work site closer to their
homes
Implementation of other measures designed to facilitate the
use of high-occupancy vehicles such as on-site day care
facilities and emergency taxi services
· Employers or owners of worksites June form or utilize an
existing transportation management association or other
transportation-related associations by RCS 35.87A.010 to
assist members in develo in and im lementin commute tri
City of Federal Way
Draft Commute Trip Reduction Plan
44
June 2007
~ "~"i'"
~ . reduction programs
City of Federal Way
Draft Commute Trip Reduction Plan
45
June 2007
VI. FINANCIAL PLAN
The City of Federal works with King County Metro to implement its CTR program. Currently, the
City receives funding from WSDOT to implement its CTR program and contracts with King County
Metro to perform various services. Described below are the funding sources, planned
expenditures and funding gaps for the City of Federal Way CTR program.
1:..!;undib'9.S6lJrc~~,
. .:~' ":~': .~: ,:-:1::~.~. -'~ \ .
The CTR programs administered in Federal Way are funded by a number of sources, as described
in the following table:
WSDOT ~gQt~9Q
King County $ZQ,QQQ
Metro
King County ~mQ,Q.QQ
Metro
~lQjQg9
~~g:QQ.q
~lQ~,QQg
~20,O]g
~1!1.9JlJ!
~JQ.Q,~Qg
~20,llQd
l\':,;.__,;",__.:~~.,-,
~20; . ,0 . ____ tomm~nt [J1}: Financial numbers.
,"",,- -.-- -. --- -- . - \!'1~ed~t() be v.erified by Federal Way,
~tPMOG
City of Federal $1 o;Ood ~IQ,QOd ~10,00Q ~} Q..99Q
>t:._Ln-'i-,~.._.l
Way
$150,000 $150,000 $150,000 $150,000
City of Federal Way
Draft Commute Trip Reduction Plan
June 2007
46
I""" '. ' ..'" d;", "
':PtQgr~m, ':)(J"~~'S~~,
'.""."-, ':;,':':"..., "l'~"_~"l~' .:,:~'! ,_,
"
\ " ;: ,<' ""'I
The cost of implementing is shared primarily by the City, the transit agency, and the employers.
The following is a summary of the types of expenses incurred throughout King County.
plan, update
Comprehensive
PI~n; and CTR
ordinance
Employer
Notification
Administer CTR
program (contract
management,
annual reporting,
program review,
surveys,
coordination
meetin s
Implement
supporting King
County Metro
services
Offer program
incentives
TOTAL
.. .. . a
~
Way
~
OOEfiM
. "0
~
OOEfiM
. '0
~
OOEfiWmJ
. "0
. "0
~
m
City of Federal $5,000
Wa
King County Metro $20,000
$5,000
$20,000
$100,000
$20,000
$150,000
$5,000
$20,000 '
$100,000
$20,000
$150,000
$5,000
$20,000
$100,000
$20,000
$150,000
City of Federal Way
Draft Commule Trip Reduction Plan
June 2007
King County Metro $100,000
Cities, County, ' $20,000
King County Metro,
Em /0 er
$150,000
47
I jri.in~an~I'liifG""'a"~-'
, r ...."". i"'.J:,-,..,:_.~",_..R..., '. ..
"'; '';. '.- '., '<t:' ~
, . . ' ..
il'"
:, "; I
' '-.
The following table summarizes program areas that are not currently funded. However, some
potential funding sources have been identified for the applicable organization to target.
Develop Chief Executive Increase management $25,OOO/annually
Management Officers, support for CTR program
Support program by giving employer
managers recognition and
- describing benefits of
ro ram to CEOs
Telework CEOs, ETCs Training and assistance $25,OOO/annually
Education and to help set up telework
Compressed Work programs,
Week
Transit, vanpool Commuters at Subsidies to encourage $50,OOO/annually
and carpool CTR-affected commuters to shift to
subsidies work sites transit, van pool and
car ools
Marketing and Commuters at Increase awareness of $25,OOO/annually
Promotions CTR-affected transit and ridesharing
work sites ro rams.
Bicycle Amenities Commuters Work with employers to $25,OOO/annually
provide amenities to
bicycle commuters, i.e.
bike racks, lockers, and
ublic information.
TOTAL- $150,000
The following funding sources have been identified that potentially could be used to fund CTR
programs:
., Congestion Management Air Quality Grants
· Surface Transportation Program Grants
· Employer Trip Reduction Performance Grants
· Washington State Construction Mitigation Funding
· Transit Agency ~unds
Local Jurisdiction Funds
· Major Employers
City of Federal Way
Draft Commute Trip Reduction Plan
48
June 2007
1,~s'Limll'i~'i;\1
..~._..:..:. ..,:.,.:_ ,.r/~
'. :'. /e:0:'I't:":,r ';~:'.~\:.' ,', "
;: ~ ., ,-~";'Jr..'-. _~ _.: .1\:;-" . '. -" '.~ .
'. : ~ ':.,.,,' '-,' .
,.,..'."'.1
'. .....".
The following table shows the amount of money necessary to implement all of the proposed
strategies listed in the previous tables. There are insufficient funds at this time; however, some'
potential funding sources have been identified below,
Potential funds to be used to fill in funding gaps:
· Congestion Management Air Quality Grants
· Surface Transportation Program Grants
· Employer Trip Reduction Performance Grants
· Washington State Construction Mitigation Funding
· Transit Agency Funds
· Local Jurisdiction Funds
· Funds from Major Employers .
. " . ., . '0 . '0
L.i.'illiJ:!EjJ~ 1.i.'fil:iIllij~ ti.'mil:lliIl ~ I..i.'miI!lill
Wli13 WIl]) WJ:ru ~~
$150,000 $150,000 $150,000 $150,000
$150,000 $150,000 $150,000 $150,000
$150,000 $150,000 $150,000 $150,000
$150,000 $150,000 $150,000 $150,000
City of Federal Way
Draft Commute Trip Reduction Plan
49
June 2007
VII. IMPLEMENTATION STRUCTURE
The City plans to work in partnership with King County Metro and its affected work sites to
implement the CTR program.
City of Federal Way
King County Metro
Major Employers
The City will be responsible for developing and implementing their
local CTR plan. It is responsible for ensuring that CTR plan is
consistent with its local comprehensive plans. As part of its CTR
plan, the City will set the goals and targets for the affected
loyers. For erR program adrnlnlstra ,
responsible for ensuring that affected employers are in compliance
with the CTR law.
In partnership with the City, King County Metro will be responsible
for employer outreach, conducting marketing and promotional
activities, and rovidin services toCTR-affected work sites.
Employers that are affected under the CTR law are responsible for
notifying the City when they are affected. Employers are
responsible for implementing their CTR program requirements,
including information distribution, designating an ETC, submitting
program reports, delegating adequate time for ETCs to perform
duties and im lementin rogram elements.
I'iCTR P,rograrn Aetivitiei:;<: ":., .:",;- ';
Policies and Regulations. "
Update Comprehensive Plan
CTR Pro ram Enforcement
Implement Vision of Downtown
Federal Wa and Centers
Review Parkin Policies
fServices and Fadliti.es
< 'L
Transit Services
Van pool Services
";'_~C'_'._-", ';"'j !<~ .. '. .,. .,. ->.f.'t-:"
... ~"" ',-:"".. _' - _... I.:., .
<1
.. .. . .
'1;
City of Federal Way
2008
Cit of Federal Wa
City of Federal Way
2008 - 2011
, >'" ~-
On- oin
On-going
Sounder and Regional Express Sound Transit
Bus
Ridematchin services Metro
On-going
On- oin
City of Federal Way
Draft Commute Trip Reduction Plan
June 2007
50
Bicycle and Pedestrian City of Federal Way
Facilities
~M~t~~fii1~'and'lne~~liYes' "
r
Wheel Options Campaign
Management Support
Subsidies
Parking Management
Promotional Events
Marketin and Education
Coordination with Health
A encies
On-going
On- oin
On-going
On oin
. On- oin
On-going
City of Federal Way
Draft Commute Trip Reduction Plan
June 2007
51
VIII. DOCUMENTATION OF CONSULTATION AND PUBLIC
INVOLVEMENT
On June 6, 2007, the City of Federal held a meeting with employer representatives from its CTR-
affected work sites. The purpose of the meeting was to review the CTR Efficiency Act and to
inform the employers of the new requirements. The City also discussed ideas and strategies that
could help the CTR-affected work sites make progress towards meeting their goals. The meeting
summary of the workshop can be found in Appendix F.
In addition to meetina with employers. the City of Federal Way coordinated the development of its
CTR plan with King County Metro, the Puget Sound Regional Council and other jurisdictions in
King County.
City of Federal Way
Draft Commute Trip Reduction Plan
52
June 2007
APPENDICES
Appendix A
CITY OF FEDERAL WAY
VICINITY CTR WORKSITE PLANS
." ;-
legend
,___I '* eTR Siu
~rlell/llfll1
-Principal
',-..- -CoIlecto,
0_... -,
';- -Local
"',<- i. ( '-,,~i r~r~;;r'~-~ - ._-1
.. : ,,--.....
;
;
..,.~ I ;
,<""
,,",:'
~:~~-~:.'
,
h1JY
:\..l(
..i!'-: "; i
i i!
~
j.'
.....---!
- -I ) ~
:,'.:',1i, J . ~ ,
J1c~;:~~ . .
---.- or-=-
, -
!,,-.
L.':
'::~Hdj
,---- \ it/. l'Ibyeth_ilmPlo'
: \. ,,' ,.. !l
, . ,., .... ... , -}..a.rgerll\llPll\'
Co.) .'. ~"''''._: _ ;
r,.'
-.!
)
1. }<: L
,\!-.
e -r- _--f
_T~:;:t - f
~, I
. -_M'--I ,--
, . ,," I
-~~';';~.smgir---
1d\1sl~ --
.-'---
ui--::-i- -
/ . f L_
L +!j1_1
[ ; -/ q j
!
[lJ
Perteet
M~y 14, 2007
;-~i-: ,1,"-
; i '.,'
, ,
r-'-
o
0.25
0,5
0.75
1
.Miles
Federnl Way CTR Plan
Federal Way CTR Worksi!""
FkJlIIe A
Appendix B
CITY OF FEDERAL WAY
COMPREHENSIVE PLAN
. City of Federal Way Comprehensive Plan
1:Z-?~
::;:-::;;:.~
,g.r, "tGn~' "."
j::; ,. CPilnty J
I!f {:~t~ ... .{,'.,
PUj?,f;.'t. .cioun<!
i
I
I .
;j
'I
, .,l.
'-.-
_J
o
, i}
l;~~~f~~"'= h_' ~Fed~.~.~
Federal Way CTR Plan
Federal Way CTR Employers
2006 Comprehensive Plan
Map Source Date: April 2006
Figure B
~
Perteet
May 14, 2007
Appendix C.
CITY OF FEDERAL WAY
ZONING MAP
City of Federal Way
"~G:J~:-'---"':'~'~"_~'.'
i ~"..
f CIlVlIt'/.'
.: .0, . '. .!
. . . ..' _ l. '.
. .. ,.
: ," ..,';. ,I
. .
Official Zoning Map
~~~:..
P~:g('t Sound
....--.r-~ r.}.., ~'T~!
! I\~- ~f-'~'- ; _ i ._"J
,h Yi '.1
;
-~
! .
!
" I f
~~. i
'\0 (
'. "'-
~ ,,/
'i-0'1'
\..J .~~ '
.. __.!J
L.;
h;., .
lit> /.
,'1' "
Fo
.
"-'.:.]-';1
,"< J~
'"j"" "'" ,.)
<. .'.. ' ;ll
" -p...........-----f. . I
, J~~, " " I'; /;.:",;,'1
II '.f ./". I
. .,'., ,o.K'j
. "/ ,-
. "1" .' ,.... j
, . ;4':1." /.'1, ..
~ . '..t...."..
~"--"--_.-.-
, ,
.Jl.~___~_~__
. ;}
l.~~~~~:~~=;:
..J
~ ~eralWay
~
~
Perteet
May 14. 2007
Federal Way eTR Plan
Federal Way eTR Employers
2006 Zoning Map
Map Source Dale: April 2006
Figure e
AI~pendix D
CITY OF FEDERAL WAY
TRANSIT SERVICES AND FACILITIES
~ng CountyMetJo Bus Stop
Padl & Ride
;-1 '
- __..J..--
>-
N i
!
J\;-ut:l-~
~
Perteet
M~y 14, 2007
i
i
~:-i.__
? 1=:.
'Ut'J
i>+~- ,HOO
\ " i '.,! [:'
i l~ ) ) 1\1.(
,,'HWln1tH#1
o
0.25. 0,5 0.75
1
,Miles
Federal Wny eTR Worl<s ites
Tmnslt Routes, Bus Stops. and
Park & Rid. Facilities
FigureD
r----.-'-."" -~._--_.
I '" l iE is E lit D
_ '''IiloU..,"",~~
I - !D.I!i~"~aotil~
I ~DM.OIl!$1I"Iin, ~.rio'l~~,Il,'~IW
cd PO"""'t..jl"",~f'*t1iiii4,l....
II m II II
.,.~ ~, ~ ~
!. ~~l..;j.i~"d.~1jII!
~~JIi~{mI:~
~,~~, ~~"iW,JJ~~'
11;i'uII~
~O'~ €I ~i~
~~~G1/lI61l
I1rI:itcil~~
~~"~\'!i'J;jl~~,~
'"':. ""t,".;:':
, OO'fmltl
'lilJ~ ~i1:
, <,:1' " , ,:f~J:l:
~. '--........,.....
,\
.~~:~
1~1~.ao.
~fn, 1 ~
1~
.' .
~-~......-
\ . ~,,~i\
Gi"~iii .
1)1L I~
II g. Ir,.m~
I'il. 1~il'(l
[ill. I~O
.i ~ !~~
~ Q. ~
;:1'. I~
il:l.l~
,] ~ I~~
I
11:Q.1~
! 15. ~;;
; 1-g. I~~
,_!!,.I~
\,
I
.I
FIE:O,IERA,l WA.Y
Actfive CTR S;iites
'"
~
.
"'"
~~.~1
llEGENID
-:.~:r~l1Jf~
:::JI:E: ~~~~""""'w~~.!;~
~~1iIlj.1v,.jiJ"'."'1'~T
- ""'I1s;!~li!i'!2Ifr:1~f1Jl\";I:fq;1l1lJ;!l~::
......... P.!2.:<:lI\I~;~~~>P: Uij!
II _lEl1!p>4.~~~
GJ ~~!tr @ ""~I~~
fimSI'iV-lJ.lI;iB\ll;T1:lll""""",IJl..IlJj1i],
fII:I~F'~~
'd1F>>
,,~, < .
,l'. ,
~{\
"
'!'
I!Il
,.
....
r:~~.~~
-'8
~f,gmrtr
\
~.",
".
.. .~
(~~..,.,.~.
,d'" " ~,'~ '
~~~
'7 ~"\ "
" \"
FEID'EIRA,L, 'W'A Y
T rans[~ Routes
n.. IE G IE INlII}
.
, -.. ~'~wDllkby.~ . ,';',.,
': - ~,R~i..fiput~~ ,
r-- IC;;n ~ IhmbU'll - :'
r--1t.. ~. ~ l!k.~ ..L.~1
L.:!!!.J.i!I~ L!:!J ~ E!!I """".., ~
E) =r~\l4I l "
:'.'J ,to.-," '1_0
",,c,,''',''
....'~
.._--:":...v..~,,,...-- , . J
.. ;
+:'
I'
t
I
lffirrn1I~i ~
;8
1Dn!Jl &grdy
Appendix E
CITY OF FEDERAL WAY
NON-MOTORIZED FACILITIES
~
Scale:
~ ~\e
/"':'-./
/.....
/v'
N
N
Federal Way CitY LimitS
potential AnneY-atiOn Mea
ClasS 1 {separate Trail)
ClasS 2 {Marked Bike Ulnes)
ClasS 3 {Bike Route)
~
perteet
May 14, 2001
B\cyc\e Facmt\eS p\an
federal Way C1R Plan
federal Way C1R Erllployers
Non_MotOrized facilIties
Map Source pate: october 2006
. figure E
~ federal Way
Appendix F
COMMUTE TRIP REDUCTION
WORKSHOP SUMMARY
City of Federal CTR Employer Workshop
Tuesday, June 5, 2007
Federal Way City Hall
On June 5, 2007, the City of Federal Way held a meeting to discuss the CTR Efficiency Act with
CTR-affected work sites in Federal Way. The following individuals were in attendance at the
. meeting:
AQenda:
· Introductory Remarks - Sarady Long, City of Federal Way
· Overview of eTR Efficiency Act - Jonathan Dong, Perteet Inc.
· Group Discussions led by Jonathan Dong, Perteet Ine
Summary of Small Group Discussions:
1. What are the challenges facing your organization as it implements the CTR program?
· It is very difficult to convert people from using drive alone vehicles to non-drive
alone vehicles because people want flexibility with their travel.
· Some organizations have very limited resources and it is difficult to provide
resources for the CTR program.
· There is high turnover among staff at some organizations,
· Transit is not accessibility to some of the work sites.
· Van pools are hard to form because it is difficult to get at least five people together
who have the same schedule.
· Van pooling is difficult because it is hard to get drivers.
· Van pooling is cost prohibitive.
2. What are your suggestions for improving the CTR program?
· Implement tolls at bridges which will discourage people from driving.
· Provide incentives for using non-drive alone modes, particular vanpooling.
· Provide subsidy to vanpool if they are unable to fill the van with at least 6 riders.
· Increase communication to commuters about non-drive alone alternatives.
· Restructure the way van pools are charged. Instead of charging by the van,
charge by the trip to allow for flexibility for more riders.
· Allow van pools to pick up other riders that do not regularly ride in the van.
· Encourage employers to offer telework which is very popular among commuters.
3. What types of assistance would you like to see from the City and Metro?
· Provide monetary assistance for using non-drive alternatives
· Follow up with the van pool program to allow for more flexibility with ridership and
cost structure.
· Increase marketing and promotional activities.
A~endix G
COMMUTE TRIP REDUCTION
SUMMARY OF POLICIES THAT SUPPORT eTR
COMPREHENSIVE PLAN GOALS AND POLICIES ANALYSIS
This section provides a list of CTR supportive comprehensive plan goals and policies that the City
of Federal Way either has or doesn't have. The right hand column identifies the policies that the
jurisdiction has in place relating to the recommended goals and policies in the left hand column. If
the jurisdiction doesn't have some of the recommended goals and policies listed below, then they
June want to consider adding some of these recommended goals and policies to their
comprehensive plan during the next update.
~~lliUJ~{!j
~".':: f~
Land Use Element
Enter into agreements and establish procedures for setting priorities,
programming, maintaining and financing for countywide, regional and
state transportation facilities and services consistent with the GMA
current federal transportation legislation
Land use and transportation goals and decisions should be integrated
with one another and coordinated with adjacent jurisdictions and with the
Regional Transportation Plan to determine the types and levels of
transportation facilities to be provided within the unincorporated county.
The county/city should use future land use projections to identify and
provide for adequate safety, structural, rights-of-way and other possible
improvements that support vehicle transportation, non-motorized and
. transit needs of the region plus use alternative transit modes as areas
develop. .
Integrate Commute Trip Reduction land use planning by requiring non-
motorized pedestrian connections between retail, living, and work places.
Non-motorized connects shall include, but not be limited to: transit
connections, bus stops, sidewalks, bike facilities, trails and encouraging
employers to participate in ride sharing programs.
When evaluating land use changes to the Comprehensive Plan,
proposals should include an analysis of how the development furthers the
goals of Commute Trip Reduction planning.
LUP46
None
None
Recommendations,
but no policies or
goals.
LUP17, 31, 32, 41,
43
None
~~ 1~f2J
~....I" I~
Pursue transportation demand management (T
local/regional level by coordinating with region
customers see their travel choices and the var
coordinated, integrated system that makes a d
Example:
Regulations to influence travel behavior
Marketing
Improvements in services and facilities
Require the integration of non-motorized and Ir
planning and developing urban centers or GTE
Establish urban centers and/or GTEC's where
regional transit agencies, or work with the app
expand service to the urban center within a re
~~~
Ihl (!ffimill ~
OM) strategies at the None
al and state,partners so
ious TOM promotions as a
ifference in the community.
ansit connections when LUP38
-C's. . . - . . -
they can be served by LUP38
ropriate transit agency to
asonable timeframe.
ocated in urban growth NA
of community and safe,
i1ities and public transit
would trigger development NA
ble comprehensive plans,
ng pedestrian facilities, LUP25
tacles, public art, and open
newly developing areas of LUP31. 32
kages with the rest of the
friendly design features in LUP 38
view process. Examples
Iking distances to activities
alkways or arcades
d waiting areas for transit
walks and walkways are NA
strip or drainage swale.
Urban Design
Encourage new housing developments to be I
areas and small towns to help provide a sense
non-motorized transportation to community fac
modes.
Discourage transportation improvements that
that is premature or not consistent with applica
policies, or zoning. .
Provide aesthetic and functional amenities alo
such as water fountains, benches, trash recep
spaces (such as seating plazas).
Provide pedestrian, and bicycle connections in
the city, promoting both internal access and lin
city.
Incorporate transit-supportive and pedestrian
new development through the development re
include:
Provide pedestrian pathways that minimize wa
and to transit stops.
Provide weather protection such as covered w
connecting building developments, and covere
and ridesharing.
Incorporate guidelines for addressing that side
separated from the roadway by a landscaping
'~~'f.I1t:j~~
~...... .~
Adopt pedestrian friendly design guidelines, especially in high pedestrian
activity zones, such as wide sidewalks, lC!ndscape buffers or strips, street
trees, adequate lighting, traffic calming measures (such as traffic circles,
curb bulbs, raised medians, speed tables and chicanes), special
avements, and bollards.
Adopt development design standards that promote a pedestrian friendly
environment. Such standards May include reduced building setbacks,
requirements for display windows, building entrances oriented toward the
street, and locating parking lots to the rear or side of buildings.
Secure bike lanes and trail improvements or easements through the
development review process to develop portions of the bicycle and
pedestrian system.
Require new developments to incorporate non-motorized features or
programs designed to promote use of alternatives to single-occupant
vehicles, such as;
. Preferential parking for car pools and van pools
. Special loading and unloading facilities
. Transit facilities, including comfortable bus stops, and waiting areas,
adequate turning room, and where appropriate, signal preemption and
queue-jump lanes
. Bicycle parking and related facilities
Pursue strategies that make transit safe, secure,comfortable, and
affordable.
Integrate multiple access modes, including buses, carpools, and
van pools, bicycles, and pedestrians.
Integrate transit-oriented development opportunities with the private and
public sectors.
Discourage the development of major, stand-alone park and ride facilities
with city limits. Situations where additions to park and ride capacity could
be considered include:
At the terminus for a major, regional transit system.
When opportunities exist for "shared parking "(e.g., where transit
commuter parking can be leased from another development. Such as a
shopping center, movie theatre, church, etc.)
Areas where alternatives to automobile uses are particularly inadequate .
(e.g., lack of direct transit system, or pedestrian and bicycle access) or
cannot be provided in a cost-effective manner.
l;~~~
i.Ilil~~
LUP25
LUP32
LUP61, 170
None
None
None
None
None
,
't;
j~~1i1UJ~&j ~&j~
~.... .1' . I~ 1tJ~~
Allow a reduction in the number of required parking spaces if a Recommendations,
development provides ride-share programs, car pool parking spaces, bike but no policies or
racks, lockers or other approved non-motorized parking options.. goals.
Encourage transit oriented development and pedestrian friendly land use LUP38
characteristics through zoning and land use policies that encourage
mixtures of land uses, increased densities in targeted areas with design
standards.
Adopt a parking credit program that allows developers to reduce the Recommendajions,
number of required parking spac~$_ if they PUJvide a[l511t~rnaJive but no policies or
- . goals. - -
transportation program to drive alone vehicles.
<, . ltousing Element c- . -
: ;.
Work with other jurisdictions to achieve ajobs/housing balance that None
makes it possible for people to live closer to where they work.
Promote quality, community-friendly residential development, through None
features such as enhanced open space and pedestrian connectivity.
" tJ~pital 'Facilities Element .
..
Explore the possibility of encouraging cooperative funding for bicycle None
trails.
Implement a methodology for public-private partnerships when it would CFP 27
result in a. more efficient use of public resources.
Aggressively seek funding opportunities for safety, mobility, intermodal, CFP 22, 24
bicycle, pedestrian, neighborhood, and transportation demand
. management improvements
Provide adequate and predictable funding to construct and maintain None
pedestri?n and bicycle capital projects.
Effectively link pedestrian project funding and approval decisions to None
priorities identified in the CTR plan, as well as the Non-Motorized element
of the jurisdiction's Comprehensive Plan.
Support a greater investment in pedestrian enhancements, and ensure None
that all new transportation projects include funding for pedestrian
improvements.
Continue programs to construct, maintain, and repair sidewalks. None
Assign high priority to pedestrian and bicycle projects that provide access None
to major employment areas and activity centers, provide linkages to
transit, complete planned bicycle facilities and provide system
connectivity.
,,;.
~~~~i2l
~..I" I~
Effectively link TOM program funding and approval decisions to priorities
identified in the CTR plan, as well as the transportation element of the
jurisdiction's Comprehensive Plan.
Utilities Element
Secure sidewalk and trail easements over existing utility lines where ever
feasible
T.ransportation Elefn'ent
~i2l~
lID @!m.:n:fi ~
None
Carpools, Van pools, & Ride Share
~
None
Ensure that the city as an employer sets a positive example by
maintaining a strong transportation demand management program for its
employees.
Pedestrian System Connectivity ~
The city should ensure that continuous and/or direct bicycle lanes are
provided between all jurisdictions and major activity centers.
Consider pedestrians along with other travel modes in all aspects of
developing the transportation system. Provide safe and convenient
pedestrian access in all new and improved transportation projects, unless
exceptional circumstances exist.
Remove barriers and deterrents along the existing pedestrian system to
create better access between employment facilities, residential and other
uses.
TP62
TP62
Recommendations,
but no 'policies or
goals.
Coordinate the local jurisdiction's existing and planned pedestrian system TP65
with adjacent jurisdictions to provide a continuous, coordinated system,
especially when major employment and activity centers are nearby.
Secure sidewalks and trail Improvements or easements through the
development review process to develop portions of the pedestrian
system.
Recommendations,
but no policies or
goals.
Pedestrian Safety and Security ,'., '
Adopt and use national (American Association of State Highway and
Transportation Officials, AASHTO) design standards for pedestrian
facilities.
Address the special needs of citizens with various degrees of mobility in
planning, designing, implementing and maintaining pedestrian facilities.
Provide consistently designed pedestrian activated signal crossings, and
consider technologies that enhance pedestrian safety at crossings"such
as longer crossing times and audible crossings.
ReCOmmendations,
but no policies or
goals.
TP53, 70
None
Pede
Cond
arou
and t
Inclu
trails
(for WI
lmple
pede
cente
recre
1 . ~li1ru~.&!J ~&!J~
."00, .1' '". I~ ttn~~
ider access management to reduce the number of conflict pOints TP22
ways) between pedestrians and vehicles, thereby improving
strian safety.
re that pedestrian facilities are designed and monitored to improve Recommendations,
rity and safety, through lighting, openness, vegetation upkeep and but no policies or
rity features such as panic buttons at key locations. goals.
gn midblock crossings with safety as a high priority, and consider None
vements such as pedestrian crossing signals, flared curbs
outsM>edestriaruefugeJslands,Jlledians,-ancladequatasight
nce around parked vehicles.
strian and Bicycle Convenience ~
uct periodic analyses of bicycle and pedestrian environments in and None
nd urban centers and regional transit stations to identify deficiencies
o plan access improvements.
de bicycle facilities in the six-year capital improvement program (for None
that will be utilized by bikes) or the six-year transportation program
'dening shoulder projects that will accommodate bikes).
ment way-finding (signage) along sidewalks and trails that direct None
strians to key locations or destinations, such as major activity
rs, business districts, institutions, major medical facilities, parks or
ational facilities.
ide internal pedestrian circulation systems within and between TP62, TP64, TG4
ing, new or redeveloping commercial, multi-family or single family
lopments, and other appropriate activity centers. Provide convenient
ections to frontage pedestrian systems and transit facilities.
urage transit use by improving pedestrian and bicycle linkages to the TP74
'ng and fu.ture transit and school bus system, and by improving the
rity of and utility of park-and-ride lots and bus stops.
ide bicycle connections and secure bicycle parking and storage Recommendations,
enient to major transit facilities; increase the number of secure but no policies or -'.:
ng areas for bicycles. goals.
uct bicycle transportation studies to improve safety and overall None
ty of bicycling.
erate with the public and private schools, bicycle clubs and other TP56
sts groups to provide education and strategies to promote safe
skills and the transportation and recreation opportunities of
ling.
~
l~
Cons
(drive
pede
Ensu
secu
secu
Desi
impro
Ihl"1b
dista
or
Prov
exi~t
deve
conn
Enco
existi
secu
Prov
conv
parki
Cond
quali
Coop
.intere
riding
bicyc
. .. ~li1UJ~&!l
@:I!rlffi)~. .t. . .. .~
Improve mobility and safe access for walking and bicycling, and create
incentives to promote non-motorized travel to employment centers,
commercial districts, transit stations, schools and major institutions, and
recreational destinations
Update and review the Pedestrian and Bicycle transportation Plan every
five years. The updates should consider the existing and future role of the
single-occupant vehicle in relation to non-motorized and public
transportation modes, as well as newly annexed areas, areas
_experiencingJJllf.or.es.eeo.-de'LelQpment andLouedevelopment and other
emerging issues.
Develop an effective "share the road/share the trail" concept for
pedestrian and bicycle education programs .for the motorized and non-
motorized public.
j ~&!l~
fi1J @:nmrrfi~
TP54, 56, 57, 64
None
" Recommendations,
but no policies or
"goals.
Accessibility ._
Sidewalks or pedestrian facilities should be located along all both sides of TP50
all arterials, collectors, and at least one side of most local streets.
Pedestrian facilities should be wide enough to allow the disabled, such as TP53, 62
wheelchair users, to access them, usually a minimum of 5' to 6'. A wider
facility should be provided along principal arterials (generally a minimum
of 8'), or in business districts that attract more pedestrians.
Direct pedestrian linkages should be considered whenever possible, to TP54
connect between internal land uses and arterials. This reduces walking
distances to transit stops and commercial uses.
Public Transportation , '
Encourage interconnections and time coordination of public transportation TP71
modes (bus, coach and rail) to increase level of service and ridership.
Work with transit providers to provide transit service that is fast, frequent, TP71
and reliable between urban centers and urban villages and that is
accessible to most of the city's residences and businesses. Pursue
strategies that make transit safe, secure, comfortable, and affordable.
Support development of an integrated, regional high capacity transit TP25, 31, 33, TG6
system that links urban centers within the city and the region.
Develop partnerships with transit providers to implement projects TP71, 74, 62
providing neighborhood-to-transit links that improve pedestrian and
bicycle access to transit services and facilities.
~~~~!2J
~........ .~
Coordinate with regional, state, and federal agencies, local governments,
and transit providers when planning and operating transportation facilities
and services in order to promote regional mobility for people and goods
and the urban center approach to growth management.
Design transit access into large developments, considering bus lanes,
stops, shelters, non-motorized lanes & facilities as part, of the project.
design
Coordinate with transit providers and the private sector to develop and
_. -- - impLeme.ol..c.ornp.atibl.eJr.allSP-Qrlation demand management re ulations
and strategies that are consistent with the Commute Trip Reduction Act.
Work with car share companies to provide car.share opportunities at key
locations, such as major employers, business districts, and high density
residential areas.
Provide preferential lanes, such as High Occupancy Vehicle (HOV) lanes Recommendations,
on roads which will benefit commuters the most, such as those with major but no policies or
goals.
transit routes, and those experiencing the weatest congestion.
l ~!2J~
lID ~ IillillliJ
TP71
TP73, 75
TG5, TP58, 59, 66
None
For water-borne travel across puget Sound, encourage the expansion of
the passenger-only ferry service and land-side facilities and terminals that
encourage walk-on (by-foot, bicycle, transit) trips rather than ferry travel
with automobiles.
7
Coordinate ferry arrivals and departures with mass transit systems to None
ensure an efficient flow of people and traffic.
Educate.the general public and public officials about the economic,
transportation system performance, environmental, health and social
.benefits of walking and biking and develop improved programs to
encourage increased levels of walking and biking.
Educate drivers and pedestrians about pedestrian safety issues, and
enforce pedestrian related laws.
Consider the formation of a pedestrian advisory committee to provide
input to the jurisdiction (staff and elected officials) on pedestrian related
issues and needs, as well as review of major transportation projects to
ensure that pedestrian needs are adequately addressed or considered.
Recommendations,
but no policies or
goals.
Recommendations,
but no policies or
goals.
Already in place
~~liiijj~&!J
~~.,...", .~
Develop a pedestrian walking/biking map that is focused on major activity
centers, such as business districts or major employment areas. The map
should identify sidewalks, trails, bike routes, transit corridors and bus
stops/transit centers, and key activity centers such as institutional uses
and government centers, major employers, commercial or retail areas,
parks, and other points of interest.
: ~&!J~
! rru~~
Already exist
Monitoring "
'"-,,,",
Ensure that the local government monitors the results of its TOM
programs and-policies, and continually -evalu-ate-changs-s-n-e-eded-to
improve mode split goals.
Continually evaluate large employer CTR program effectiveness and
reduce the employer threshold if needed to achieve the jurisdiction's
mode split goals. .
~ ...'!:,c::oti.~ffiiFPevelopnient~h~megt ..
Promote public awareness of the impact travel choice.s have on
household finances, personal quality of life, society, and the environment,
and increase awareness of the range of travel choices available.
TG5
TG5
Recommendations,
but no policies or
goals.
Employment .
Require large employers to implement a commute trip reduction program None
for employees, as mandated by the Commute Trip Reduction Act.
The county/city should encourage employers in urbanized areas to offer None
staggered work hours or flextime and other Transportation demand
Management programs such as parking management, ride match
services and preferential parking of van pools, carpools, covered bike
racks, lockers and showers at work sites.
Encourage employers to provide information and marketing on commute None
altematives, such as transit schedules, rideshare information, and
guaranteed ride home programs.
Encourage employers to develop telecommuting options, which allow None
employees to work one or more days at home or at a "satellite work
center" closer to their homes.
Encourage employers to allow flexible work schedules or compressed None
work weeks to help reduce the number of vehicles using local and
regional roadways.
Encourage major employers to provide daycare opportunities onsite or None
nearby.
~~'WUl~f2l
~..... .~
Encourage employers to provide subsidies to employees who commute
using other modes, such as free or reduced prices for transit passes, or
discounted parking for rideshare vehicles.
Parks & Open Space Element
Provide for adequate roadway, pedestrian, and bicycling connections in
newly developing areas of the city, promoting both internal access and
linkages with the rest of the city.
Identify areas to be designated as pedestrian promenades, with
pedestrian-friendlyenvironments.
Provide for uniform bicycle and pedestrian markings and design
standards for travel along city bikeways and walkways.
.
~
ement.
~,
ement
-
ement
~f2l~
IID~
None
No P&O EI
No P&O EI
No P&O EI
A~endix H
GLOSSARY OF TERMS
GLOSSARY OF TERMS
Affected Employee: Under the Commute Trip Reduction (CTR) law, an affected employee is a
full-time employee who regularly begins work between 6 a,m. and 9 a,m., at a single work site, on
tow or more weekdays for at least 12 continuous months.
Affected Employer: An employer is "affected" under the CTR law if there are at least 100
"affected" employees at a single work site,
Alternative Work Schedules: AWS programs offer alternatives to the typical eight-hour work day.
OpJiQns include Vex-time, a compressed wor~ week, and stagge(ed work hours, _ _ _ _
Automobile Dependency: Transportation and land use patterns that result in high levels of
automobile use and limited transportation alternatives. In this case, "automobile" includes cars,
vans, light trucks, SUVs and motorcycles
Base Year: The CTR law requires affected employers to measure the results of their employee
trip program against base year values for VMT and drive alone vehicles. The goal year is 2011.
Bus Rapid Transit: Special lanes dedicated to transit buses, often incorporating other features to
insure high quality transit service. -
Carpool: Two to six people age 16 and older, sharing the ride in an automobile to and from the
work place.
Commute: The trip made by an employee between their home and work locations, regardless of
the distance or mode used.
Compressed Work Week: A work week that is compressed from the typical five-day, 40 hour work
week into a shorter work week but maintaining the same number of hours.
Commute Trip Reduction Program: A CTR program is comprised of strategies used by an
employer to reduce employee use of single-occupant vehiCles (SOVs) and the vehicle miles
traveled (VMT) per employee. The CTR program specifies the measures to be used that will
achieve the target goals.
Drive Alone Vehicles:.A vehicle that is occupied by one person.
Employee Transportation Coordinator: The CTR law requires employers to appoint an
employee transportation coordinator, or ETC. The personal is personal change agent who
provides the "human touch" needed to remedy traffic congestion and air pollution problems. An
ETC is the organization's key contact person providing commuting information to employees and
liaison activities with transit agencies and local jurisdictions. The ETC creates marketing
strategies, administers employee ridesharing programs, and measures results. _
Guaranteed Ride Home (GRH): GRH programs provide an emergency ride home for employees
who commute to work in a ridesharing mode and have an illness or emergency. Typically, an
employee can take a cab ride home and charge the ride to their employer's account or be
reimbursed for the expense.
High-Occupancy Vehicle (HOV): a passenger vehicle carrying more than a specified minimum
number of passengers. HOVs include carpools, vanpools, and buses. HOV requirements are often
indicated as 3+ (three or more passengers required) or 4+ (four or more passengers required).
HOV Lane: This is a traffic lane limited to carrying high occupancy vehicles (HOVs) and certain
other qualified vehicles.
HOT Lanes (High Occupancy Toll Lanes): HOV facilities that allow lower occupancy vehicles,
such as solo drivers, to use the facility if they pay a toll. This offers users three options: drive alone
on an un priced but congested general purpose lane, drive alone and pay to use a less congested
lane, or rideshare (carpool, vanpool or ride transit) to use a less congested lane without any
additional fee.
Mobility: The movement of people and goods.
Mobility Management (Also called Transportation Demand Management): Various strategies that
change travel behavior (how, when and where people travel) in order to increase transport system
efficiency and achieve specific objectives such as reduced traffic congestion, road and parking cost
savings, increased safety, improved mobility for non-drivers, energy conservation and pollution
emission reductions.
Nonmotorized Transportation (also known as Active Transportation and Human Powered
Transportation) includes Walking, Bicycling, Small-Wheeled Transport (skates, skateboards, push
scooters and hand carts) and Wheelchair travel.
Parking Management: Strategies aimed at making better use of available parking supply. Parking
management strategies include preferential parking or price discounts for carpools and/or short-
term parkers, and disincentives, prohibitions and price supplements for those contributing more to
congestion.
Parking Pricing: Strategy to reduce automobile use by requiring motorists to pay directly for using
parking facilities. Time variable parking pricing can be used as a congestion reduction strategy.
Parking Cash.Out: This means that people (typically commuters, and sometimes residents of
multi-family housing) who are offered a free parking space are also offered the cash equivalent
when they use alternative transportation modes and so do not impose parking costs.
Ridesharing: Ridesharing is any cooperative effort of two or more people sharing a motor vehicle
traveling to a common destination, such as a work site. Carpools and vanpools are common forms
of ridesharing.
Smart Growth: Land use development practices that create more resource efficient and livable
communities, with more Accessible land use patterns. An alternative to sprawl.
Sprawl: Dispersed, low-density, single-use, automobile dependent land use patterns.
Stakeholder: Individuals or groups that are affected by a'decisionand have an interest in its
outcome.
Teleworking: Teleworking involves the use of telephones, computers, and other technology to
work from a location other than a conventional office.
Transportation Demand Management (TOM): Various strategies that change travel behavior
(how, when and where people travel) in order to increase transport system efficiency and achieve
specific objectives such as reduced traffic congestion, road and parking cost savings, increased
safety, improved mobility for non-drivers, energy conservation and pollution emission reductions.
Also called Mobility Management.
Transportation Management Association (TMA): A TMA is a partnership or organization that
brings interested parties together to work on transportation issues.
Van pool: A van pool consists of seven to fifteen people sharing their commute in a passenger van,
generally riding to the same place of employment.
Vehicle Miles Traveled: Number of miles a vehicle has traveled for a commute.
COUNCIL MEETING DATE: July 17,2007
ITEM
CITY OF FEDERAL WAY
CITY COUNCIL
AGENDA BILL
SUBJECT: City Center Access Project - Draft Public Involvement and Communication Plan and Public
Stakeholder Team Member and Process Approval
POLlCY QUESTION: Should Council approve the Draft Public Involvement and Communication Plan that
includes the Public Stakeholder team level of involvement?
COMMITTEE: Land Use and Transportation Committee
MEETING DATE: July 2, 2007
CATEGORY:
~ Consent
D City Council Business
D Ordinance
D Resolution
D
D
Public Hearing
Other
_~!::\J.:_~_~~_~~~!~~_:_.._M~!),.'.lnn~_.~~~~~~~iL~':~=-'-_~~!!!~~I!:~f.f.!~~!!_g~l!~~!__._._~~~~:_.~~?.~_~~~~_r.:~~_____.__.._____._.._
Attachments:
· Memorandum to the Land Use and Transportation Committee dated July 2, 2007
· Federal Way City Center Access Project Draft Public Involvement and Communications Plan
Options Considered:
1. Approve the Draft Public Involvement and Communications Plan (PICP) (attached) which includes the
Public Stakeholder team level of involvement proposed by staff for Phase II of the City Center Access
Project.
2. Approve the Draft Public Involvement and Communications Plan (PICP) (attached), but do not approve
the Public Stakeholders team level of involvement proposed by staff for Phase II of the City Center
Access Project and provide direction to staff.
3. Do not approve the Draft Public Involvement and Communications Plan (PICP) (attached) or the Public
Stakeholders team level of involvement proposed by staff for Phase II of the City Center Access Project
and provide direction to staff.
_._..._-~.-._--_._...._._---_.._.._.._---_._........_.._-..........----..................---....-..--......__..__.....___......_...___.___................_...._.____....._....._.......___.._.__._.._._...d___......._.______..__._._.____
STAFF RECOMMENDATION: Staff recommends forwarding Option 1 to the July 17,2007 City Council Consent
A enda for a roval.
CITY MANAGER ApPROVAL:
DIRECTOR ApPROVAL:
~/{
Committee-
Council
Committee
Council
COMMITTEE RECOMMENDATION: Forward staffrecommendation for Option 1 to the July 17,2007 City Council
Consent Agenda for approval.
Jack Dovey, Chair
Linda Kochmar, Member
Dean McColgan, Member
PROPOSED COUNCIL MOTION: "I move approval of the Draft Public Involvement and Communication Plan
which also includes the Public Stakeholder team level of involvement proposed by staff for Phase II of the City
Center Access Project. "
(BELOW TO BE COMPLETED BY CITY CLERKS OFFICE)
COUNCIL ACTION:
o APPROVED
o DENIED
o TABLED/DEFERRED/NO ACTION
o MOVED TO SECOND READING (ordinances only)
REVISED - 02/06/2006
COUNCIL BILL #
1 ST reading
Enactment reading
ORDINANCE #
RESOLUTION #
CITY OF FEDERAL WAY
MEMORANDUM
DATE:
TO:
VIA:
FROM:
SUBJECT:
July 2nd, 2007
Land Use and Transportation Committee (LUTC)
Neal Beats, City Manager
Maryanne Zukowski, P.E., Senior Traffic Engineer ~
City Center Access Project - Draft Public Involvement and Communication Plan and Public
Stakeholder Team Member and Process Approval
BACKGROUND:
In May of 2007, City Council approved authorization to proceed with Phase II of the City Center Access
Project, Final Access Point Decision Report (APDR) and Environmental Assessment (EA). From 2003 to
2006, the City of Federal Way, in conjunction with project partners, Washington State Department of
Transportation (WSDOT), Federal Highways Administration (FHW A), Puget Sound Regional Council
(PSRC), the additional supporting agencies (the "Core Support Team"), and the Public Stake Holder
Team performed a feasibility study to determine viable access solutions to the safety issues and the
congestion at the interchange of S 320th Street and Interstate 5 (1-5) (access to Federal Way City Center).
The FHW A stated that the City of Federal Way Feasibility Project was one of the finest examples of
"Context - Sensitive" design that the FHW A had ever seen. The "Context - Sensitive" design approach
the staff used in the previous project phase was the inclusion of a Public Stakeholder Team. The Public
Stakeholder Team level of involvement is not defined in the federal public involvement requirements, but
it is important to note that this form of team has significant amounts of benefits to the project itself and
the project's success. A public team has the opportunity to provide input and guidance into the formation
of decision making structure. A public team also provides local knowledge to a consultant team and
external agencies not directly linked to the community. The public team acts as an advisory body.
PROPOSAL
Staff would like to make the Committee aware that there are impacts to project cost and scope for the
inclusion of a Public Stakeholder Team. Based on staff experience and knowledge of the level of work
involved, this project should include approximately ten (10) Public Stakeholder team meetings, at
significant milestones during the life of the project (two and one-half years).
DRAFT PUBLIC INVOLVEMENT AND COMMUNICATIONS PLAN (PICP)
A requirement for this project is to participate in specific levels of public interaction during the
environmental process. Staff has prepared a draft plan (attached) for the Committee and Council to
comment on prior to including this task in the Request for Proposals. The PICP will remain in draft form
for a majority of the initial stages of the project. Staff would also like to make the Committee aware that
the scope proposed thus far carries the component of the Public Stakeholder Team at a level of
involvement and interaction with the community that will benefit the project's process and progress.
Federal Way City Center Access Project
Drafl Public Involvement and
. Communications Plan
Working Document
Prepared for
City of Federal Way
Land Use and Transportation Committee
City Council
January 2007
Revised May 23, 2007
Revised June 5, 2007
Prepared by Maryanne Zukowski, P.E. City of Federal Way
K:\TRAFFIC\I-5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBLlC INVOL VMENT ORAFT\JUNE VERSION PHASE 2 PI_PLANJEDWA Y _CCAP _1.2007.DOC
JUNE 19.2007
Contents
Introducti on . ......... ... .... '" ..... ....... ... ...... ...... ............ .... ...... ..... ............ ....... ... ..... ..... ........................ 3
Public Involvement and Communication Goals ................................................................... 3
Opportunities for Public Input to the Study Process ........................................................... 6
Mechanisms for Sharing and Receiving Information................................................. 6
Stakeholder Team Recruitment.... ......... ......... ......... ................ ..... .......... ..11
Stakeholder Team Meetings....... ......... ....... ...... ..... ............... ......... .., .... ...12
Project Flyers/Invitations (Press Releases) .................................................................. 8
Open Houses.................................................................................................................... 9
Specialty Briefings............................................................................. ....10
City Council Briefings........................................................................... .13
Newsletters....................................................................................................................... 7
Web Page .................................................................. ........................................................ 9
Figures
1 Phase 1 Study Area.......................................................................................................... 5
Tables
1 Stakeholder Team..................................................................................7
2 Template for Public Involvement Milestones and Schedule ................................... 20
K:ITRAFFICII-5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBLlC INVOLVMENT DRAFT\JUNE VERSION PHASE 2 PI_PLANJEDWAY_CCAPJ2007.DOC 2
JUNE 19. 2007
Introduction
The City Center Access Project Phase 2 is an assessment oftwo transportation infrastructure
alternatives and various transportation demand system options within the vicinity of S 320th
St. and the Interchange at 1-5. The specific study area is to be determined by the Phase 2
project in an Environmental Assessment (EA). Figure 1 shows the Phase I study area.
The City of Federal Way's 6-year Transportation Improvement Plan (TIP) and the 20-year
Capital Ifuprovement Plan (CIP) identify the City Center Access Project as a variety of
potential integrated projects to mitigate safety and congestion as the S 320th St. Interchange
at 1-5. The number of options that were screened in Phase 1 was 47. Currently, Phase 2
includes local road improvements and modifications to current interstate access at two
specific locations.
The City Center Access Project has multiple phases. The Phase 1 Feasibility Study and Draft
Access Point Decision Report (APDR) were completed between 2003 to 2006. The schedule
for Phase 2 is three years and will result in a preferred alternative of transportation
improvements. The Phase 2 project scope will propose screening processes to be approved by
the project core team, with input from the Public Stakeholder Team. The processes are
intended to identify and evaluate the two alternatives against a "no build" alternative. These
processes are intended to be presented to the public and City Council for approval.
An APDR request is the first step in the process of securing the necessary approvals from
WSDOT and the Federal Highway Administration (FHW A) to modify an interstate
interchange. Phase 2 ofthe study, preparation of the Final APDR, EA, and Preliminary
Engineering is expected to take at a minimum of three years.
Public Involvement and Communication Goals
Public involvement and communication are important parts of the City Center Access
Project, and this Draft Public Involvement and Communications Plan (PICP) provides the
guidelines for informing the public about this study and for soliciting the public's opinions.
The Draft PICP is a working document to identify and define the scope of work of the
project.
The PICP for Phase 2 ofthis project is determined to be a "Complex Project" for the "Level
of Involvement." For this reason staffhas developed a draft PICP to be completed by a
consultant and approved by Council. The PICP is a working document and shall be modified
appropriate for the specific customers identified for this specific project.
The consultant, as part of the contract for the project will gather demographic data from the
City of Federal Way "Housing & Human Services Consolidation Plan 2006 - 2010" adopted
March 7, 2005 and from the 2000 Census, identifying the general locations of minority and
low-income populations within the study area. This data will also be reviewed to determine if
populations in the study area will require special accommodation in the PICP in compliance
with the Limited English Proficiency (LEP) Act. Populations include citizens who may
K:\TRAFFIC\I-5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBLlC INVOL VMENT DRAFNUNE VERSION PHASE 2 PI_PLANJEDWA Y _CCAP _1.2007.DOC 3 JUNE 19. 2007
traditionally be left out of the public interaction process. The PICP will be modified as
appropriate for specific customers identified for these project improvements. The PICP shall
also consider the need for and/or benefits of additional members to be added to the Public
Stakeholder Team.
Prior to finalizing the PICP, the consultants, in consultation with the city staff will identify a
list of additional Public Stake Holders with which to conduct interviews. The interviews will
promote a better understanding of community issues prior to the first public meetings and
will determine whether or not additional members shall be added to the Public Stake Holder
Team.
The public involvement and communication goals ofthe study are to:
. Inform the public about the project.
. Provide opportunities for members of the public to share their local knowledge and
express their opinions.
. Create a liaison between the public and the technical core support and advisory team
members.
. Create an exchange of information that leads to public support for the project.
K:ITRAFFICII-5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBlIC INVOLVMENT ORAFTlJUNE VERSION PHASE 2 PI_PLANJEDWAY _CCAP _1.2007.DOC 4 JUNE 19, 2007
I'l~t<;'~, l""':'I~?,?"1:~~ ~l--~. \~: ..1
. j I 'I'....~ 1\";'"..."t' ) l . '" .,. 1
I' " ~ '.' ." ) ....-! r ' -'
.., -~.':-- 11""" l.&' - '~" ..^'. . j
.. " '- '), '" ~~ :" i 1 ~ ~:;c. -, -'.'
..", l .-'Tl.~j:o,'~ -, (~t 3. -<-'...- ~
\ .,.... ,:;;,~,~' 'i '3 ,~".J
\(.\ . ;~~~ ;: .~1~~-..1
.' a ,''''jl~C'I-lc.~:w..~".{"", /, I' -: 0' .' . ~
· " t . a. ~Wi.1:I3J v r ^ . o' - \ I
,lo; ,":' .,.,,'. .... -iJ '/" ';'~'~'-J'l
(~. ~ . ~ 8}'-: l;~,.'.:\'~~~l\:t':~~~> j ~~." 'j]
,,:. . H..,' I " l "" :\', \"'-- ~ .., " ,)'
,'~~', . ..' a ~t;~\, :i".: .'~>/:L~' \ , ":1<:.' \1H~\lj
L.'.,' . a. i\..""'t:; .. r ',\.('~i''''''' .'. ; ': Jj
" .' '.' j:l l'.,~ ~'"".." :.' ~"h". -.' "".: \\\'~Y:.I' .:-. .~ \, J
i:I (,~ ~ ~. '. :-':. .., , 'j t '1"~",'" '. .
. "0 'f j .-\~. ~...r:: 1:L,'; \ ~.~,. 'I P \
'r. "~-$:-";::: .. _' I_.').~., "-8)
l i ':, . ".' \.. i\' :;q\.' ,. !:J \
, ..1,_.,,'.~ .~., "~'~i:. ,"'''11 ,,~"T'l
. };: fl~.' -. ~.I '\{\. t ' P ,j
.1'1.;:' -' b ~ '... 5 ':. "1
. I~'t~ '~, ,.'~ '..... ,...~-:"~ ~ 1_"
,t, 1\.,~.I' '..;,f.} .
" ... ~~.tf.,,' ~ ("~ ~~l I
1 Is';" ':1">" .~, J .,"".j ~~..j
g,J,,,~';im; , . . I
t'1: . ,j ~ ~ II.~ ~ -.,..j(': "'I..~'"." . :>.:'\ ,~'V i c
~.~ :,~ "', . "~'\:-;~ . .~:.." ',,' :'~'I':'~')~ ";\
t....6:JiT.TQ...nl"n::8f' :" ~.'~~~ ,:-.' '~~'. I.!. '. \ '.' " . '.1
fa}? '.', 'J i~']:l"i;r. ;~~i<, ..~~.\t.~ ~ij
~.J :P,. 0..' ;:~ }J. '''1
? "j ~ i.'~; ~.".' . -fl" ~
~~ '. "I '~('fci:.a~~'..if, '. ,__ " ~ j
a. . ,... '~I 'I . 1-" I
'~ .:J 'l -\'''' 'J ~'it :1J'.-, !,
, I ~ \J'I! -'\.' - ,J " . Iii, ,
, ~,. . f \" 1 J ij 1 - " - I tL "1
. ," '... "~-""''iI~' I -.. 'ar '-f
0, . (f'n'-'--l.~ ...,j..l",,"..... "I"""
=tci::Jc:LJl:LlDO-:X;, '. ~ "a: l,.. . t ,,/ :"\) >"" "
. a~;:-: 'f;""..;-',~ '~~~f~',: ::
, I !'~ '! 'f,:' ,..J, ~..
~: ~ I~~~' ~~ Q 0 ~~~~ }~ ,.<X ". :~'# (I ~ All
,J. " Cl "- ., !. I.i '" I ~ ...r.
.1~~"}~''^'~1 ~ ----J-) ,~~) ~:~: .j~'~:
'il t. ~51 L': :) ( . f ~ i:.... ,;:.' "I I
. ,.(", "I,S, , \ '5""',......1. "",! II--- \'G \ ''j,j:'' j
'>.i -_',.' ~ '?' 8 .1':JJ'\~,\~,'/ 1 " ;::.:~ ~' ,:1
\"", A [::J. 0 I " --'" ,-,:t ,..~", ~,,,-. '
~ . ~....:-:... t.:r'] ..~J"l ,{ J.~~) \", .) J. . , ~ ~
If t;(j L'" 1-;' - o'");~,)/ lJ - ~........ /
". ~ ... ; 'Jo.~l' J 'I ..,tJi..ti, (.' · Ill'!.
,..@JI~~'Rr."'-,~:J.(~, ),' j ",:",1
r " ; ".J.".....,.,j{-;'7"- '.1":., I ';'i
t:. ,.,?~;:t,. i~~\/,;.c;(~;~l>. ~,;
, ,1.J,l:.. cI .,..,
.;... /;. '[l]t'~'r -,,', . :
~.c,-,. -. {;\:jj~ :.,I~~.'i;:,~=~i,,~-. _ - .' .
I' ,. ...-..;...,1/".": l)....y~~ '
" . . I ...---4i~~' ~ d-,~ - 'I..' 11' f:tit'YJNiJmi1 --'-..
~. CJ,.r: \ ,[ ~:.- .:..,.- . :'j ~
. . /' ,~ . ~l\'~ ; ',1 . tJ . .:, .' "
".Ji:';':. :-. " _.; ,>~~~{t ~/. ; ...... ,~;4~~
',T}. :~ : ,,{~. 'J(-~. ~ ::.~ ;,,' _.t .:.1 (t., 'J.
7",.,. (!~~ ~~> \t~'.~.: ,~:!~J
Figure 1
Study Area
~.} ,
K:\TRAFFIC\I.5 TO CITY CENTER ACCESS PROJECT PHASE 2\PUBLlC INVOL VMENT ORAFT\JUNE VERSION PHASE 2 PI_PLANfEDWA Y _CCAP _1.2007.DOC
5
JUNE 19, 2007
Opportunities for Public Input to the Study Process
The public will have opportunities for involvement throughout the study. Scoping,
meetings, Public Stakeholder meetings, Special Interest Group meetings, and Open Houses
will provide opportunities for members of the public to meet and talk with City staff and
the consultant team, and to share information, concerns or questions they may have with
regards to the project.
The major factors in the structure ofthe public involvement process plan will identify:
. The desired participants / stakeholders and input to be requested.
. The special approaches to solicit input of those traditionally underserved by
transportation (Environmental Justice and Title VI) populations.
. The legal requirements and constraints.
. The special issues and areas of concern.
. The need for public education on the project and environmental process and the
best ways(s) to accomplish.
. The procedures for considering and responding to public comments.
. . The program for monitoring, evaluating and restructuring the plan when
necessary.
. The major project decision milestones and program scheduling.
. The points at which specific public interaction is requested.
The PIep for this project will use the following two approaches to solicit input from agencies
and local citizens in the design and environmental process:
. Informational program for dissemination of information to the general public,
businesses, citizens groups, public agencies, Tribes, key stakeholders, public
officials.
. Scoping, Public Stakeholder meetings, Open Houses, Special Interest Groups and
EAJDesign Hearing.
Mechanisms for Sharing and Receiving Information
The following describes the mechanisms and tools that are planned to be used to both
inform and involve the public.
Informational Program
The consultant will develop and maintain the project's mailing list and e-mail list of
all interested parties to include potentially affected residents, businesses, public
officials, Tribes and environmental organizations.
The mailing list developed and the database established is so that an extracted list of
the recipients ofthe EA and the Revised / supplemental EA can be produced.
Information will be extracted as needed for mailings to citizens, legislators, agencies
K:ITRAFFICII-5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBLlC INVOLVMENT DRAFl\JUNE VERSION PHASE 2 PI_PLANJEOWAY _CCAP _1.2007.DOC 6 JUNE 19. 2007
(federal, state, county, city and regional) and Tribes. The city will be informed of any
additions, deletions, or corrections to the list of which they become aware.
Potential topics to be covered in each of the informational programs could include
one or more ofthe following:
· Time and location of any meetings.
. A review of the purpose of the study.
· A list of study participants.
· Project progress to date.
· Contact names, addresses, and phone numbers.
· A simplified project schedule indicating project statues.
· A review of major issues.
· A report of input received at the previous open houses or meetings.
· A discussion of project alternatives with graphics.
· A review ofthe process used to evaluate alternatives.
All written materials for review by the public and facilities used for public
involvement in developing the EA will also conform to the requirements of the
Americans with Disabilities Act (ADA), contain the ADA message concerning the
availability of alternative format material upon request, the Title VI message on
discrimination, and a statement that facilities meet ADA requirements.
The Informational Program will take six (6) primary forms:
(1) NEWSLETTERS
The consultant will prepare a newsletter for each of the three milestones
described below. The target audience will be based on zip code mailing,
adjacent property owners, Tribes, all agencies with interest, the environmental
groups, and freight / commercial users and other names as directed by the city
as discovered through the public process. Subsequent audiences are those
people who have previously attended the open houses or have expressed an
interest in being advised of the project's progress along with adjacent property
owners, Tribes, all agencies with interest, the environmental groups, and
freight / commercial users. Newsletters will be finalized, printed, and mailed
by the consultant. For informational purposes, the City's bulk mailing of
41,600 newsletters three times a year. For this project, we are assuming a
bulk mailing of3000 newsletters and a project mail of up to 500 newsletters.
Staff anticipates that it will also utilize the City newsletter for information and
updates of the project milestones, as written by staff. The three project
newsletters as prepared by the consultant will be three 8 Yz by 11 newsletters
and are planned at the following milestones:
· Project kickoff
. Proj ect Update
· After a Proposed Action is selected
KITRAFFICII.5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBLlC INVOl VMENT DRAFT\JUNE VERSION PHASE 2 PI_PLAN_FEDWA Y _CCAP _1.2007.DOC 7 JUNE 19, 2007
The city staff will e-mail the newsletters to the elected officials three days
prior to each mailing.
(2) BULLETINS IPOSTERS
The consultant will prepare a project bulletin / poster (one side of one 8 1/2" x
11 " page). The consultant will produce and post final bulletins / posters at
businesses and other conspicuous, highly visible public locations in the
project area, two weeks prior to each public meeting. The consultant will use
the demographic analysis and determination based on the LEP to determine
the need for translating the bulletins / posters and postings in location that will
capture the attention of those identified groups typically not included in
transportation planning.
For budgeting purposes the consultant will assume that 100 bulletins will be
posted and distributed. The consultant will prepare a total of three (3)
bulletins / posters: one each for the public scoping meeting and the two
public open houses (showing the proposed screening criteria and the
Proposed Action). What was successful to the other project open house
notices was the use of signage at congested intersections as well as VMS
boards at various locations that advertised the open house event. Staff
recommends this process to gain additional interest in the project.
(3) PRESS RELEASES I PRESS PACKETS
The City stall will prepare and process press releases and distribute them to
newspapers, community groups, and public agencies at various times during
the project to give information on progress and upcoming hearings or public
meetings.
(4) PAID ADVERTISEMENTS
City staff plans to write, prepare, and place appropriate legal notices and
display advertisements in selected newspapers to announce:
. Declaration of Significance / Notice of intent / Notice of Scoping
. The project Open Houses
The advertisements will list the purpose of the advertisement, the date, time
and location for each Open House or meeting by City staff. For the project
open houses the advertisements will be published approximately three weeks
prior to the event and again within five to twelve days prior to the event.
(5) HANDOUTS AND COMMENT FORMS
The consultant will prepare meeting handouts with a tear-off comment form
for the public meetings, Public Agency Scoping Meeting, Open Houses and
K:\TRAFFICII.5 TO CITY CENTER ACCESS PROJECT PHASE 2IPUBUC INVOLVMENT ORAFTlJUNE VERSION PHASE 2 PI_PLAN_FEDWAY _CCAP J2007.DOC 8 JUNE 19, 2007
Community Group Meetings. Handouts and comment forms will contain the
information explaining the purpose and need ofthe project, the public input
process, major issues, the proposed alternatives, areas of impact, alternative
evaluation criteria, and project schedules. A summary of past events, present
events, and future events shall be highlighted in each handout.. The handouts
are intended to solicit comments from the meeting attendees. The consultant
will tabulate and summarize the written comments received from the public at
the public scoping meeting and the public open houses. The consultant will
print the handouts for all meetings.
The consultant will also prepare a meeting hand out with a tear-off comment
form for a Project Advisory Committee meeting comprised of extended
agencies, member specific to projects involved identified by the Core Support
Team. Handouts and comment forms will contain similar information to the
handouts used in the public and community meetings with the addition of the
recommendation of the selection of a preferred alternative and supporting
information. The handouts will solicit comments from the meeting attendees.
The consultant will prepare meeting handouts with a tear-off comment form
for the Agency Scoping Meeting. The handout will take the form of the
Agency Scoping Information Package four weeks prior to the meeting for
review by City staff. The consultant will print and mail this package two
weeks prior to the meeting. The Agency Scoping Information Package will
contain similar information as described for the handouts, but with more
information as appropriate for the intended audience.
(6) CITY OF FEDERAL WAY WEB PAGE
The City of Federal has an extensive web site. Press releases, notices, the
project flyers/invitations, and newsletters will be posted on the City's web
site. The format for the web page is planned to be of the same format as the
WSDOT project site web links for conformity to sharing information and
gaining contact information and comments to and from the public.
Public and Agency scoping meetings, open houses, and community meetings
Community and Public Meetings will be held to inform the public on the design and
environmental processes and to solicit comments. Meeting are intended to be held at
the City of Federal Way Community Center or City Hall. The Project Advisory
Committee meeting is expected to be held close to the project vicinity, and will occur
just prior to the second public Open House. The Agency Scoping Meeting is
expected be held the same date as the Public Scoping Meeting at a location close to
the project and is for agency briefing and solicitation of agency comments on the
project.
City staff plans to send notices, which include a copy of the press releases, to State
Legislators, Mayors and Council Members of appropriate cities, and County
K:ITRAFFICII,S TO CITY CENTER ACCESS PROJECT PHASE 21PUBlIC INVOLVMENT DRAFTlJUNE VERSION PHASE 2 PI_PLAN_FEDWAY _CCAP J2007.DOC 9 JUNE 19. 2007
Executives, inviting them to attend the public meetings. The legislators are expected
to be notified by staff and bye-mail.
The staff and the consultant preliminarily plan to budget for two (2) staff members to
attend each of the meetings:
· Project Advisory Committee Meeting
· Agency Scoping Meeting
· Public Scoping Meeting/Open House
· Open House / Screening Alternatives
· Open House / Preferred Action
· Specialty Briefings
The project scope will call for special interest group briefings, a total of ten
(10) briefings or workshops that each may include one or more of the
following groups:
· City of Federal Way Chamber
· Friends of the Hylebos
· Belnior Park
· Steel Lake Park - Special Interest
· Special Environmental Interest
· Special Senior Housing Area Interest TBD
· King County - P AA
· Regional Transportation Meetings
The consultant will prepare audio-visual displays, exhibits (2' x 3' or larger is
typical), fact sheets, handouts, and graphic displays for each meeting to
include:
· EA Milestones bar chart -
Computer simulations including still photographs and video of those
still photographs (up to four images)
· Acetate overlays over aerial photographs.
· Up ten Typical Roadway Section(s) including Bridge Sections.
· Vicinity Map
· Roadway Alternative Plan Sheets.
· ADT and PM Peak Hour Traffic Counts -
Map showing sensitive environmental areas (wetlands, steep slopes,
hazardous waste, bodies of water, etc.,) right of way lines, and
jurisdictional boundaries.
· Project schedule information
· Up to four other displays and other information appropriate to a
particular meeting. .
· Conceptual mitigation plans and conceptual landscape plans and
sections.
K:\TRAFFICII,5 TO CITY CENTER ACCESS PROJECT PHASE 2IPUBLlC INVOLVMENT DRAFTlJUNE VERSION PHASE 2 P'_PLANJEDWAY _CCAP J2007,DOC 10 JUNE 19. 2007
The public meetings are tentatively proposed as follows:
(1) ONE AGENCY SCOPING MEETING
The intent of this meeting is to allow public agencies the opportunity to
provide input on their concerns, help identify potential impacts of the
alternatives being considered, help identify potential areas of mitigation, and
develop a working relationship for the remainder of the environmental
process. This project meeting may be combined with the kick off meeting.
(2) ONE PUBLIC SCOPING MEETING I OPEN HOUSE
The intent of this meeting is to formally re-introduce this project phase to the
public and officials, identify new issues to be considered in the preparation of
the Environmental Assessment (EA), and receive public input relative to the
project alternatives and concerns.
(3) SECOND PROJECT OPEN HOUSE I ALTERNATIVE SCREENING PROCESS
The open house is to advise the public of the screening process identified
to select a project action moving forward.
(4) THIRD PROJECT OPEN HOUSE I PROJECT ACTION MOVING FORWARD
The open house is to advise the public ofthe screened and selected project
action moving forward.
Public Stakeholder Team Recruitment
The Previous Phase 1 Feasibility Study
Recruitment of members was a six-month process. The process included:
. Internal and external agency requests to support agencies of the City of
Federal Way.
. A series of newspaper articles written to trigger interest in the project study.
. City of Federal Way web page advertisement and announcements
. A series of press releases
. Announcements at City Council meetings
. A Town Meeting and presentation
. Newspaper advertisements requesting citizens apply
. City Council recommendations naming additional members -
The result was a committee with 32 members that represent local residential,
civic, and business organizations, and local, state and federal government
interests (see Table 1 for a list of original members. The active members at the
K:ITRAFFICII,5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBlIC INVOL VMENT DRAFTlJUNE VERSION PHASE 2 PI_PLAN_FEDWA Y _ CCAP J2007,OOC 11 JUNE 19. 2007
end ofthe project are in bold.) In Table lA are citizens who participated over
the course of time in Phase 1 of the project.
The Phase 2 Study EA Staff Proposal
City Staff is recommending that the active and interested members and new
members who expressed an interest from the public process of the Phase 1 Study to
participate in Phase 2 of the project.
Staff encourages that the City Council possibly assigns a few members to fill the
positions. Staff anticipates that eight (8) of the original members may return and
currently we have eleven (11). Though the public scoping process, as well as
identifying those traditionally underserved by the transportation process, additional
members may be retained. Other member representation that may be assigned to
the team are:
. Belmor Park Residents
. Senior Housing Residents on 28th Ave S
. City Center Business Owners
. Commons Representatives
. Steel Lake Park Interested Parties
Public Stakeholder Team Meetings
The Public Stakeholder Team will provide input and guidance on study issues
City staff and the consultant team. The Public Stakeholder Team is a very
important means for collecting local information about the study area and
sentiments about proposed alternatives and solutions. The opinions of the
stakeholders will help prioritize issues and will assist in shaping the
development of the alternatives and guiding the selection of a preferred
alternative. The Public Stakeholder Team will be an advisory body.
Stakeholder Team meetings were held on a regular basis throughout Phase 1
of the project (every month). Meeting dates and potential topics will be listed
in the future working plan of Table 2 of this PICP after the contract scope is
defined and the consultants are selected for the project. A draft Table 2 is
shown for reference.
Staff sent out a survey to the previous project members requesting the level of
their preferred involvement ofthe project. Some prefer monthly meetings
paralleling the agency meetings (similar to the Phase 1 project). The others
prefer milestone meetings. City staff is recommending a total of ten (10)
meetings over a two and a half year period of time beginning with a
Stakeholder Chartering meeting prior to beginning the project process. The
Stakeholder Chartering meeting would help educate and inform the team of
the EA process as differentiated from the previous phase of the project. Staff
is also encouraging the use of a web page to view meeting notes and
documents prepared so the Stakeholder Team may remain involved to the
K:\TRAFFICII,S TO CITY CENTER ACCESS PROJECT PHASE 21PUBlIC INVOLVMENT ORAFT\JUNE VERSION PHASE 2 PI_PLANJEDWAY _CCAPJ2007,DOC 12 JUNE 19, 2007
. level of involvement particular to each person involved, which may create a
burden for some participants. Staff proposes a link to record written
comments to this web page.
Land Use and Transportation Committee (LUTC) and City Council
Briefings
Up to a seven (7) or nine (9) briefings as presented by staff are planned be
held with the Land Use and Transportation Committee (LUTC) and/or the full
City Council over approximately 3 years. These briefings will be in a study
session format to outline the project progress for the benefit of the City
Council and to respond to items of interest from the City Council. Future
Table 2 will show the suggested topics for the meetings. Suggested topics are:
1) Provide overview of input from the community at open houses,
specialty briefings, scoping meetings, and the review the results of
screening levels including Stakeholder Team input.
2) Review results of final screening levels and preferred alternative.
Provide Stakeholder Team input. Seek concurrence on the preferred
alternative. Preview material to be presented at the second and third
open houses.
3) Report results of second open house and seek confirmation of
preliminary preferred options/alternatives.
K:\TRAFFIC\I.5 TO CITY CENTER ACCESS PROJECT PHASE 2\PUBlIC INVOLVMENT DRAFTlJUNE VERSION PHASE 2 PI_PLAN_FEDWAY _CCAP J2007,DOC 13 JUNE 19, 2007
PHASE 1 CITY CENTER ACCESS STUDY PREVIOUS STAKE HOLDER TEAM
TABLE 1
Stakeholder Team
Group Name Contact E-mail or Address Information
1. Federal Way Parks Department Donna Hansen/Kurt Reuter Don na. HansenaD.citvoffederalwav .com
Kurt. ReuteraD.citvoffederalwav .com
253.661.4040
2. Federal Way Chamber of federalwavaD.federa Iwavcha mber.com
Commerce Federal Way Chamber of Commerce
P.O. Box 3440
"also representing employers and Federal Way 98063
local businesses 253.838.2605
Chair - Board of Directors: dinid@multi-servicecenter.com 253.835.7678
Dini Duclos
Chair Elect - Board of
Directors: Bob Hitchcock hitchmobob@bigplanet.com 253.838.8823
Member - Bob Griebenow griebenow@abam.com 206.451.2325
Contact Tom Pearson Tom PaD.federalwavchamer .com
3. Federal Way School District Administration 3140518'" Ave S., Federal Way, WA 98003
253.945.2000 -
Contact: Cindy Wendland e-mail - cwedlandaD.fwps.ora
4. Lakehaven Utility District Don Perry 31627-1st Avenue South. P.O. Box 4249.
Federal Way, Washington 98063
Federal Way: 253-941-1516. Tacoma: 253-
927-2922. Fax: 253-839-9310
e-mail - dperry@lakehaven.org
5. Federal Way Public Safety Police Chief - Brian Wilson Bria n. WilsonaD.citvoffederalwav .com
6. Federal Way Fire Department Fire Chief Allen Church alien .churchaD.federalwavfire .ora
Headquarters
316171st Ave S
Federal Way, WA 98003
phone: (253) 839-6234
fax: (253) 529-7205
7. Sandy Paul-Lyle Citizen spaulaD.ci. pacific. wa. us
City of Pacific
100 3rd Avenue S.E.
Pacific, W A 98047
253.929.1100
K:\TRAFFICII,5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBLlC INVOLVMENT DRAFTlJUNE VERSION PHASE 2 PI_PLANJEDWAY _CCAP _l,2007.00C 14
JUNE 19, 2007
8. Mike Klingman Citizen mikeiklinqman~lwmconnect.com
2910 South 304 n Street
Federal Way, WA 98003-5126
9. H.David Kaplan Citizen Hdk1934~hotmail.com
30240 27 Ave S
Federal Way, WA 98023
253.941.3819
10. Scott Chase Citizen s.chase@comcast.net
212 SW 32in PL
Federal Way, WA 98023
253.874.4755
253.382.2628
11. Hope Elder Citizen Autumnl1 @aol.com
30105 2nd PI SW
Federal Way, 98023
253.804.9190
12. Larry Paterson Citizen impater~~te. net
3330135 Ave SW
Federal Way, WA 98023
253.838.5127
13.Geoffrey Converse Kelly Citizen celldumred~foxinternet. net
312 SW 325n Place
Federal Way, WA 98023
253.838.8742
253.927.8173
14. Charles O'Donnell Citizen odonnell@oz.net
253.661.2727
32911 49th Ave S.W.
Federal Way, WA 98023
work phone is 253-815-1130
15. Bruce Johnson Citizen haaken@att.net
206.799.5057
1233 SW 325tn PI
Federal Wav, WA 98023
16. Joe Ganem III Citizen ioe3@qanem.net
253.670.0735
253.874.0453 F
17. Bill Wilkinson Citizen bill@pnwsales.com
206.510.2534
P.O. Box 3919
Federal Way, WA 98063-3919
18. William 0 Foulkes III Citizen bfoulkes~hammesco.com
3442610 Ave SW
Federal, WA 98023
253.661.6683 home
206.464.4200 work
206.790.2857 cell
206.464.4201 fax
K:\TRAFFICII-5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBlIC INVOLVMENT DRAFNUNE VERSION PHASE 2 PI_PLANJEDWAY _CCAP J2007.DOC 15
JUNE 19. 2007
19. Lisa Cooke-Tinsley Citizen LisakaaY@ll1sn.com
253.332.8220
20. Steve Davis Citizen Steven. davis5@comcast.net
253.946.4129
125 S 309th St
Federal Way, WA 98003
21. Steve Rapp Citizen Steve. Rapp@comcast.net
253.839.1276
253.988.2161
29836 12th Ave SW
Federal Way, WA 98023
22. Ron Nowicki Citizen Renowicki@aol.com (will change soon)
253.661.2664
253-927-5233
33516 9th Ave S #6
Federal Way, WA 98003
23. Pat Rhodes Citizen prhodes@rhodescpa.com
31620 23rd Ave S Suite #218
Federal Way, WA 98003
24. Jan Gibson Business Jan.Gibson@weverhaeuser.com
Weyerhaeuser Company
Mail Stop CH 3G18
33663 Weyerhaeuser Way South
Federal Way, WA 98003
P.O. Box 9777
Federal Way, WA 98063-9777
253.924.442 work
253.661.0490 home
25. Hold for King County
Temp contact
Patrick Duhon
Community Relations Planner
King County Department of
Transportation
KSC-TR-0824
201 South Jackson Street
Seattle, WA 98104-3856
(206) 263-3424
26. "Friends of the Hylebos As Represented by: e-mail: chinook@hvlebos.ora
Wetlands" Eric Stavney estavnev@sea.devrv.edu
3600 S. 344th Way
Federal Way, WA 98001
Telephone (253) 943-3119
27. Washington State Legislative Sen. Tracey Eide (D) e-mail: eide tr@leq.wa.Qov
Office: John A. Cherberg Building
P.O. Box 40430
Olympia, WA 98504-0430
Telephone: (360) 786-7658
Fax: (360) 786-1999
K:\TRAFFIC\I-5 TO CITY CENTER ACCESS PROJECT PHASE 2\PUBLlC INVOLVMENT DRAFTlJUNE VERSION PHASE 2 P'_PLANJEDWAY _CCAP _I,2007.DOC 16
JUNE 19. 2007
28. Washington State Legislative Rep. Mark Miloscia (D) e-mail: miloscia malalleq.wa.qov
Office: P. O. Box 40600
Mod 1 Building - rm 112
Olympia, WA 98504-0600
Telephone: (360) 786-7898
29. Washington State Legislative Rep. Skip Priest (R) e-mail: priest sklalleq.wa.qov
Office: P. O. Box 40600
420 John L. O'Brien Bldg.
Olympia, WA 98504-0600
Telephone: (360) 786-7830
30. U.S Legislative Office: Congressman Adam Smith Tacoma Washington Office
Tacoma Office contact 1717 Pacific Avenue #2135
Jordon Hevenor Tacoma, Washington 98402
Telephone: 253-593-6600
Toll Free: 1-888-SMITH09
(1-888-764-8409 )
Fax: 253-593-6776
District office staff list
Directions to the District Office
Jordan. hevenor@mail.house.gov
31. U.S. Senator for Washington Senator Cantwell Cantwell. Maria - (D - WA)
State
Aide contact Travis Sullivan Class I
717 Hart Senate Office Building
Washington, D.C. 20510
(202) 224-3441
Web Form:
cantwel'.senate .qov/contacUindex. html
Contact travis Sullivanlalcantwell.senate.qov
32. U.S. Senator for Washington Senator Murray Murray. Patty - (D - WA)
State
Contact for Senator Class III
173 Russell Senate Office Building
Dale Learn Washington, D.C. 20510
(202) 224-2621
Web Form: murraY.senate.qov/email/index.cfm
Contact dale-'earn@murrav.senate.qov
K:ITRAFFICII-S TO CITY CENTER ACCESS PROJECT PHASE 21PUBLlC INVOLVMENT ORAFTlJUNE VERSION PHASE 2 PI_PLAN_FEOWAY _CCAP _1.2007.00C 17
JUNE 19. 2007
PHASE 2 EA PROPOSED STAKEHOLDERS
TABLE1A
Stakeholder Team Member Possible Additions "BOLD = Confirmed
Group Name Contact E-mail or Address Information
1. Michael R. Mielenz Citizen mikemielenz@hotmaiI.com
2101 S 3241h St, #248
Federal Way, WA 98003
253.927.7055
(need email address)
Ted Enticknap Property Owner along SR993 8~l8 ,2J~ ~A~~eS'
Federal Way, WA 98003
253.838.7196
Not a good number tried calling 5/25/07
Bob Roper Citizen RSST ANLEY3@comcast.net
525 SW 312th Street
Federal Way, WA 98023
253.941.6954
Message left 5/25/07
. AI and Barbara Lunde Citizen (need email address)
P.O.Box 23541
Federal Way, WA 98003
253.661.6693
Messaqe left 5/25/07
2. Federal Way Chamber of federalway@federalwavchamber.com
Commerce Federal Way Chamber of Commerce
P.O. Box 3440
Federal Way 98063
253.838.2605
Chair Board of Directors:
Dini Duclos dinid@multi-servicecenter.com 253.835.7678
Chair Elect Board of Multi Service Center
Directors: Bob Hitchcock AUn: Dini Duclos
P.O. Box 23699
Contact Tom Pearson Federal Way, WA 98063-0699
hitchmobob@bigplanet.com 253.838.8823
TomP@federalwavchamer.com
K:\TRAFFIC\I-5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBlIC INVOLVMENT ORAFTlJUNE VERSION PHASE 2 PI_PLAN_FEDWAY _CCAP J2007.DOC 18
Fe
JUNE 19, 2007
3. Bob Griebenow Business Bob.grie benow@abam.com 206.431.2323
BERGER/ABAM Engineers, Inc
Attn: Bob Griebenow, Vice President
33301 9th Ave S, Suite 300
Federal Way, WA 98003-2600
4. Jan Gibson Weyerhaeuser Company
Mail Stop CH 3G 18
33663 Weyerhaeuser Way South
Federal Way, Washington 98003
P.O. Box 9777
Federal Way, WA 98063-9777
253.924.442 work
253.661.0490 home
5. H.David Kaplan Citizen Hdk1934@hotmail.com
30240 27th Ave S
Federal Way, WA 98023
253.941.3819
6. Lisa Cooke-Tinsley Citizen Lisakaay@msn.com
509 SW 322nd St
Federal Way, WA 98023
253.332.8220
7. "Friends of the Hylebos As Represented by: e-mail: chinook@hylebos.orq
Wetlands" Eric Stavney estavnev@sea.devry.edu
3600 S. 344th Way
Federal Way, WA 98001
Telephone (253) 943-3119
8. Andy Hwang Federal Way Police Andy. Hwang@cityotfederalway.com
Department
9. Fire Chief Allen Church Federal Way Fire allen.church@southkinqfire.orq
Department Headquarters
316171st Ave S
Federal Way, WA 98003
phone: (253) 839-6234
fax: (253) 529-7205
10. Lakehaven Utility District Don Perry 31627-1st Avenue South. P.O. Box 4249 .
Federal Way, Washington 98063
Federal Way: 253-941-1516. Tacoma: 253-
927-2922. Fax: 253-839-9310
e-mail - dperry@Iakehaven.org
11 . Sandy Paul-Lyle Citizen spaul@ci.pacific.wa.us
City of Pacific
100 3rd Avenue S.E.
Pacific, WA 98047
253.929.1100
12. Federal Way Parks Department Donna Hansen Donna. Hansen@citvoffederalwav.com
253.661.4040
K:\TRAFFICII-5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBLlC INVOLVMENT DRAFT\JUNE VERSION PHASE 2 P'_PLANJEDWAY _CCAP _1.2007.DOC 19
JUNE 19. 2007
TABLE 2
Working Draft Public Involvement Milestones and Schedule Phase 2 EA City Center Access Project
Date" Public Involvement Activity Topic(s)*
June 18 2007 Initial City Council/Land Use . Public Stakeholder Team Approval
Transportation Committee Briefing by . Draft Public Improvement Plan
Staff on City Center Project
TD8 Land Use Transportation Committee
Week of July 17, 2007 First Stakeholder Meeting
Week of July 9, 2007 Core Team Kick Off Meeting
TDB Land Use Transportation Committee
TBD Initial City Council/Land Use
Transportation Committee Briefing
. Overview of consultant selection and draft
contract OR Core team development
. Project schedule
.
. Overview of the Project
. Roles and Responsibilities
. Meeting schedules
. Transfer of materials plan
. Overview of Project
. Stakeholder information.
. Hand out draft scope for review
. Consultant Contract Award
. Final approved contract by
WSDOT/City/FHW A
. Overview of Study Process
. Key Milestones and Decision Points
. Progress and Accomplishments to date
. Next Steps
. TBD
. TSD
TBD City Council
T8D Press Releases
"Topics may change as the project evolves.
K:ITRAFFICII-5 TO CITY CENTER ACCESS PROJECT PHASE 21PUBLlC INVOLVMENT DRAFT\JUNE VERSION PHASE 2 PI_PLANJEDWAY _CCAP _1,2007,DOC 20
JUNE 19. 2007
COUNCIL MEETING DATE: N/A
ITEM
CITY OF FEDERAL WAY
CITY COUNCIL
AGENDA BILL
SUBJECT: Transit Now! Service Partnerships
POLICY QUESTION: Should City Council authorize staffto submit letters of interest to King County for service
partnerships to improve transit service in Federal Way?
COMMITTEE: LAND USE/TRANSPORTATION COMMITTEE
MEETING DATE: July 2nd, 2007
CATEGORY:
D Consent
D City Council Business
D Ordinance
D Resolution
D
D
Public Hearing
Other
~!~.~~-~~.!'-9.~!.,~X_~~i~~_l?~~~~J_l?:;J?_:.J_~i!Y.J'!..~!fl_~...~~g~~~~....___
DEPT: Public Works
Attachments: Memorandum to the Land Use and Transportation Committee dated July 2,2007.
Options Considered:
1. Authorize staff to submit letters of interest on all three presented concepts
2. Authorize staff to submit letters of interest on another combination of concepts
3. Do not authorize staff to submit letters of interest.
STAFF RECOMMENDATION: Staff recommends Option 1.
CITY MANAGER ApPROVAL:
I~
Committee
Council
DIRECTOR ApPROVAL: C3'l/?'C
Committee
Council
COMMITTEE RECOMMENDATION: Approve staff recommendation
Jack Dovey, Chair
Linda Kochmar, Member
Dean McColgan, Member
PROPOSED COUNCIL MOTION: N/A
(BELOW TO BE COMPLETED BY CITY CLERKS OFFICE)
COUNCIL ACTION:
o APPROVED
o DENIED
o TABLED/DEFERRED/NO ACTION
o MOVED TO SECOND READING (ordinances only)
REVISED - 02/06/2006
COUNCIL BILL #
1 ST reading
Enactment reading
ORDINANCE #
RESOLUTION #
CITY OF FEDERAL WAY
MEMORANDUM
DATE:
TO:
VIA:
FROM:
SUBJECT:
July 2, 2007
Land Use and Transportation Committee
Neal Beets, City Manager h1l.
Rick Perez, P.E., City Traffic Engineer
Transit Now! Service Partnerships
POLICY QUESTION:
Should City Council authorize staff to submit letters of interest to King County for service partnerships to improve
transit service in Federal Way?
BACKGROUND:
In November, 2006, King County voters approved an initiative increasing sales tax by 0.1 % for improved transit
service. The TransitNow! Initiative thus funded consists of.4 components:
1. Improved service on "Core" routes
2. Bus Rapid Transit ("RapidRide") on 5 corridors
3. Service expansion in newly developing areas
4. Service Partnership Program
Core Route Improvements
Core Routes are intercity routes that provide two-way all day service. The one Core route improvement affecting
Federl;ll Way is Route 181, between Twin Lakes Park and Ride and Green River Community College via Federal
Way Transit Center, SuperMall and downtown Auburn. Evening service was extended to provide 30 minute
frequencies until 9 pm and 60 minute frequencies until II pm on weekdays; extending 60 minute frequencies to
II pm on Saturdays; and 30-minute frequencies from lOam to 8 pm on Sundays. These improvements began
June 2, 2007.
Bus Rapid Transit
Metro proposes to implement a Bus Rapid Transit (BRT) system, called RapidRide in 2009 between Federal Way
Transit Center and the Link Light Rail station at S 154lh Street. This route would replace the local service .
provided by existing Route 174 with new buses with a distinctive look, and IS-minute frequencies 24 hours a day,
7 days a week, increasing to IO-minute frequencies during peak hours. In order to reduce travel times, stops
would be consolidated, with Y2 to I-mile spacing, and Transit Signal Priority treatments would be implemented.
Using a fiber-optic network, real-time bus arrival information would be displayed at major stops. Due to the
signal operation issues and potential sharing of communication on the fiber-optic network, the Council will be
reviewing the inter-local agreement to implement these latter two features.
Newly Developing Areas
The County Ordinance establishing the TransitNow! Initiative explicitly described eligible areas for these service
enhancements and Federal Way was not included. .
Service Partnerships
The King County Ordinance provides for two types of partnerships to increase service with public or private
support, in order of priority:
I. Financial Participation
2. Transit Speed and Reliability Improvements
Financial Participation Partnerships
Financial participation partnerships are not subject to the sub-area equity policy that guarantees at least 40% of
new service would be provided to South King County. These partnerships require a minimum match from
partnership agencies of $1 00,000 for supplementing an existing transit route or $200,000 for creating a new route.
The financial commitment is required for proving a minimum of 1/3 of the cost of the service for at least 5 years.
Staff has investigated two options potential partnerships, with support from Metro staff:
I. In response to previously expressed concerns, consider expanding service on Routes 182 and 187 to
provide 30-minute frequencies during existing operating hours.
2. In response to requests to consider a shuttle service in the City Center and concerns expressed by the
Employee Trip Coordinators for worksites affected by the Commute Trip Reduction (CTR) Act, consider
proving a shuttle service connecting CTR-afected worksites and City Center.
Routes 182 and 187 Expansion. Route 182 connects Northshore Shopping Center to Federal Way Transit
Center via SW 356th Street, South Federal Way Park and Ride, and West Campus. Route 187 continues, using the
same buses (called "inter-lining") from Federal Way Transit Center on SW 320th Street though Twin Lakes and
back. Currently, these routes have 60-minute frequencies most of the day. The proposal would increase the
frequency to 30 minutes until 7:30 pm. Historically, 30-minute frequencies increase total ridership by a greater
percentage than the increase in cost to provide the added service. This proposal would require 4000 annual hours
for weekdays, 1400 hours on Saturdays, and 1450 hours on Sundays. Pierce Transit is a potential partner, as they
are interested in extending Route 182 further into Northeast Tacoma. The partnership's minimum share would be
approximately $228,000 annually.
City Center/CTR Shuttle. This proposal was originally conceived as a single one-way loop route connecting
Federal Way Transit Center to the Community Center and all CTR-affected worksites in the City. It should be
noted that none of the CTR-affected worksites are currently meetings their CTR goals, and these employers are
required to continue adding features to their CTR programs to demonstrate compliance towards achievng the
goals of the CTR Act. Two objections to commuting on transit, based on biannual CTR surveys, are the relative
lack of good transit service to affected worksites, and the lack of opportunities to complete midday lunch and
shopping trips during lunch breaks. Thus, this proposal attempts to concentrate service to major employers in
Federal Way to address both those needs, with 30-minute service during morning, midday and evening peaks, and
60-minute service during in-between hours. Metro staff preliminarily suggested that this route may be more
efficient as two separate routes, one for East Campus, and one for West Campus, using the same buses, similar to
the Route 182/187 arrangement. Potential partners would be all CTR-affected worksites. The partnership's
minimum share would be approximately $241,000.
Transit Speed and Reliability Partnerships
This program would reward agencies that provide any combination of improvements that reduce travel time on
Core routes by at least 10% with 5000 additional annual hours of service. This has a value of $132,000 to
$167,000 to the City. Upcoming improvements on SR 99 between S 31 th Street and S 272nd Street would be
eligible for calculating the travel time savings. The 5000 hours could be used by the City for any purpose. One
option, responding to the concerns expressed by the City Council about stop consolidation for BRT is to fund the
continuation of Route 174. Or it could be used to reduce, the cost of the other financial partnership proposals.
Selection Process
Letters of interest for each proposal need to be submitted to Metro by July 3,2007. This provides access to Metro
staff to refine the proposals. Proposals are due October 1,2007. King County Council will select among the
proposals in early 2008. Staff has prepared letters of interest for the three concepts outline above.
At and since this topic was presented as an Emerging Issue at the June 19th City Council meeting, other ideas for
additional transit service have been expressed. At this writing, staff has not had the opportunity to investigate all
Qfthese concepts, and will endeavor to address them at this Committee meeting. These include:
1. The ability ofthe City to provide transit service;
2. Provision of additional service on Dash Point Road
3. The feasibility of trolley service in Federal Way
4. Funding transit service using grants from other sources
5. Provision of a "Flex Car" program
6. Fixed price taxi service
OPTIONS:
1. Authorize staff to submit letters of interest on all three presented concepts
2. Authorize staff to submit letters of interest on another combination of concepts
3. Do not authorize staff to submit letters of interest.
STAFF RECOMMENDATION:
Authorize Option 1 to Authorize staff to submit letters of interest on all three presented concepts.
COMMITTEE RECOMMENDATION:
The City Council authorized the Committee to provide direction to staff on this topic; therefore, no additional
Council action is necessary.
DRAFT
July 3,2007
Matt Hansen, Supervisor
King County Metro Transit Market Development Group
400 Yesler Way, YES- TR-0600
Seattle W A 98104
Subject:
Letter of Interest for Speed and Reliability Service Partnership
Dear Mr. Hansen:
The City of Federal Way is pleased to present this letter of interest for a Speed and Reliability partnership in
. Federal Way. The City has expressed concern about the reduction in accessibility necessitated by the stop
consolidation for implementation of Rapid Ride, replacing the existing Route 174.
Therefore, beginning in 2009, the City proposes to improve the transit travel time on the SeaTac - Federal Way
core connection by the completion of the HOV lane system on Pacific Highway S. These improvement projects
include continuous sidewalks and street lighting on both sides of the street, raised medians, and countdown
pedestrian signals to improve pedestrian and transit user safety.
Implementation of these improvements will be phased. The segment between S 272nd Street and S 284111 Street
will be completed by the end of 2007. The segment between S 284 th Street and S Dash Point Road will be
completed by the end of 2009. The final segment between S Dash Point Road and S 3lih Street will be
completed by the end of 2011. In addition, all signal controllers on this corridor within Federal Way will be
Econolite ASC/2 or ASC/3, capable of implementing Transit Signal Priority, subject to the execution of an
interlocal agreement on the operation and maintenance of TSP equipment. Signal communications currently
consist of a combination of fiber and twisted-pair which will be upgraded to all-fiber back to City Hall, with
remote connections to the King County Traffic Maintenance Shop and the Traffic Control Center.
At this point, we believe that the 10% travel time savings can be achieved simply from these improvements
within the City. However, the partnership can be expanded to include other cities on the SR 99 South RapidRide
corridor. We would proposed that the service hours would be used to continue Route 174 to provide "fill-in"
service for those mobility-limited individuals that might otherwise have to resort to using Access service rather
than walk the additional distance to a RapidRide stop.
If you have any questions, please contact Rick Perez, P.E., City Traffic Engineer at (253) 835-2740 or
rick.perez@cityoffederalway.com.
Sincerely,
CaryM. Roe, P.E.
Assistant City Manager
RAP: [typist]
cc: [Inside people]
[Outside People]
Project File
Day File
K:\TRAFFIC\TRANsrr\LETTER OF INTEREST CC&CTR SHUTTLE. DOC
(Q)fRlAfFT
July 3,2007
Matt Hansen, Supervisor
King County Metro Transit Market Development Group
400 Yesler Way, YES-TR-0600
Seattle W A 98104
Subject:
Letter of Interestfor Direct Financial Service Partnership - Western Federal Way
Dear Mr. Hansen:
The City of Federal Way is pleased to present this letter of interest for improved service frequency in
western Federal Way. The City and Metro staff have long seen that the incremental cost increase to
increase transit service is less than the percentage gain in ridership in Federal Way. Funding constraints
have limited Metro's ability to fund this level of service, however.
Therefore, beginning in 2009, the City proposes to supplement existing routes 182 and 187 to provide 30-
minute frequency for the existing span of service. In addition, Pierce Transit may enter into the
partnership and extend Route 182 further into Northeast Tacoma. The benefits of this partnership extend
beyond Federal Way because many Northeast Tacoma residents commute to jobs in King County, but part
or all of their trips involve driving into King County due to the poor transit connections over the county
line. The City would enjoy better transit frequencies in the western half of the City. Metro would receive
the benefit of greater ridership across Federal Way, feeding into commuter and regional routes and reduced
demand for park and ride spaces.
If you have any questions, please contact Rick Perez, P.E., City Traffic Engineer at (253) 835-2740 or
rick. perez@cityoffederalway.com.
Sincerely,
CaryM. Roe, P.E.
Assistant City Manager
RAP: [typist]
cc: [Inside people J
[Outside People J
Project File
Day File
K:\TRAFFIC\TRANSIT\LETTER OF INTEREST 182&187.DOC
(Q)lPd~lFl
July 3, 2007
Matt Hansen, Supervisor
King County Metro Transit Market Development Group
400 Yesler Way, YES-TR-0600
Seattle W A 98104
Subject:
Letter of Interest for Direct Financial Service Partnership - City Center / CTR Shuttle
Dear Mr. Hansen:
The City of Federal Way is pleased to present this letter of interest for a new City Center / CTR Shuttle in
Federal Way. The City has long had the goal of improving internal circulation within the City Center area
and in addition, our CTR worksites struggle to meet their CTR goals due to limited transit service.
Therefore, beginning in 2009, the City proposes to add a new route that would connect all CTR worksites
to the City Center, as well as key community resources such as our new Community Center and the
Regional Library. In addition, many of our CTR worksites may enter into the partnership. The benefits of
this partnership extend beyond Federal Way because many employees within Federal Way have limited
mobility outside of peak hours or poor transfer times.
If you have any questions, please contact Rick Perez, P.E., City Traffic Engineer at (253) 835-2740 or
rick.perez@cityoffederalway.com.
Sincerely,
Cary M. Roe, P.E.
Assistant City Manager
RAP: (typist)
cc: [Inside people]
[Outside People]
Project File
Day File
K:\TRAFFIC\TRANSIT\LEITER OF INTEREST CC&CTR SHUITLE.DOC
COUNCIL MEETING DATE: July 17,2007
ITEM #:
....................~.............. .............~..............,....._....__ ...................................___.__. .....__............................__......_m......
CITY OF FEDERAL WAY
CITY COUNCIL
AGENDA BILL
SUBJECT: EMERGENCY EQUIPMENT
POLICY QUESTION: SHOULD THE CITY COUNCIL APPROVE THE PURCHASE OF ADDITIONAL EMERGENCY
EQUIPMENT TO ASSIST THE CITY IN PROVIDING SERVICES TO OUR CITIZENS AND BUSINESSES DURING
EMERGENCY CONDITIONS?
COMMITTEE: LandJUse Transportation Committee
MEETING DATE: July 2nd, 2007
CATEGORY:
D Consent
~ City Council Business
o Ordinance
o Resolution
o
o
Public Hearing
Other
~!~!.!._~,!.>.Q~_!.~~.:_~~!)'._M..:~g~'.~~~i.,~!~~!f!:t.x_M~~g~E___,.
DEPT: City Managers Office
......._....__...~....._._............_.....__._.._._._.__.._..._._...,...............--..--.---...-.--...-......----....--..........
Attachments: Memorandum to the Land Use and Transportation Committee dated July 2, 2007.
Options Considered:
1. Authorize staff to purchase the additional emergency equipment listed in the attached LUTC
memorandum utilizing one or some combination of the unallocated REET/General fund or Building
Facility fund savings for City Hall.
2. Authorize staff to purchase some subset of the emergency equipment listed in the attached LUTC
memorandum utilizing one or some combination of the unallocated REET/General fund or Building
Facility fund savings for City HalL
3. Do not authorize staff to purchase the additional equipment.
--_.,...._-_.__....._-_..__........_...__.__...._.~_.._..._............._-_._._..----~......_..._--_..__............_._.....__._.-._~......._..._..._._..._.__._...._-_._...._....._._--_..._.._-..---..--.--....
STAFF RECOMMENDATION: Staff is seeking direction from the LUTC Committee and full City Council.
CITY MANAGER ApPROVAL: tPJ#f.....
Committee
DIRECTOR ApPROVAL:
811ft...
Conunittee
Council
Council
COMMITTEE RECOMMENDATION: Not applicable at this time.
Dean McColgan, Member
Jack Dovey, Chair
Linda Kochmar, Member
PROPOSED COUNCIL MOTION: Not applicable at this time.
(BELOW TO BE COMPLETED BY CITY CLERKS OFFICE)
COUNCIL ACTION:
o APPROVED
o DENIED
o TABLEDIDEFERRED/NO ACTION
o MOVED TO SECOND READING (ordinances only)
REVISED - 02/06/2006
COUNCIL BILL #
1 ST reading
Enactment reading
ORDINANCE #
RESOLUTION #
CITY OF FEDERAL WAY
MEMORANDUM
DATE:
TO:
VIA:
FROM:
SUBJECT:
July 2, 2007
Land Use and Transportation Committee
Neal Beets, City Manager
Cary M. Roe, Assistant City Manager
Emergency Equipment
POLICY QUESTION:
Should the City Council approve the purchase of additional emergency equipment to assist the City in
providing services to our citizens and businesses during emergency conditions?
BACKGROUND:
In late 2006, staff provided the City Council with multiple emerging issue presentations regarding the
cities response to several winter storm events. The weather related events included a significant snow
storm and severe wind storm causing extensive and prolonged power outages. Both of these storm events
had significant impacts on the community. The street system was impacted the most by reducing
mobility due to compact snow and ice and dark traffic signals. In addition, with respect to the wind
storm, the cities ability to communicate important information to our citizens and businesses was
hampered due to the lack of common outreach tools such as the television and internet.
As a result of these impacts, the City Council directed staff to investigate the need for additional
emergency equipment to improve the cities response to future winter storms and emergency situations.
In response to the Councils direction, staff has identified the following list of equipment that would assist
staff in improving our response to future winter storms and emergency situations. The equipment is
organized into the following three categories:
Snow & Ice Equipment
. Retrofit of two existing sanders with pre-wet system
(1-10 yd, 1-5 yd)
. New equipment Purchase
1-10 yd truck with plow & sander
1 - 5 yd truck with plow & sander
1 - 5 yd truck with plow & 1000 gal deicing tank with controls
1 - 6,000 gal deicing storage tank
$ 17,081
$ 195,706
$ 147,830
$ 136,935
$ 12,783
$ 510,335
Auxiliarv Power Equipment/Electrical Upgrades
. Federal Way Community Center $ 400,000
1000 KW generator, 1600 Amp automatic transfer switch and design/installation
. Evidence Building $ 42,000
50 KW generator, 200 Amp automatic transfer switch and designlinstallation
. Portable Trailer Monitor Generator $ 55,000
60 KW generator
. Steel Lake Maintenance Facility $ 3,500
Upgrade electrical wiring and circuits to energize entire facility
. Traffic Signal System $ 240,000
Uninterruptible power supply (UPS) to energize traffic signal at key intersections
along major corridors (ie SR99, SR161, S 348111, S 336'\ S 312'h) approximately 30
intersections at $8,000 per intersection
. Traffic Signal System $ 130,000
Upgrade existing yellow signal indicators to LED City wide (approximately 75 signals)
(note: only approximately 30 intersections would be required to facilitate traffic signal
UPS system.)
$ 870,500
Emergencv Communication Equipment
Subtotal
$ 30,000
$ 25,000
$ 55,000
1,435,835
. Portable trailer mounted AM radio station, FCC radio frequency license and training
. 30 - 150 mhz portable radios including charges & associated programming
Equipment Reserves
. 10 yd truck and all sanders and plows ($ 244,282)
(note: used to help offset costs)
Total $1,191,553
10% Contingency $ 119,155
GRAND TOTAL $1,310,708
Potential Funding Sources:
In conversation with Assistant City Manager, Iwen Wang, potential funding sources include unallocated
REET, General fund and Building Facility fund for the City Hall construction. The estimated amount of
unallocated REET funds is $1,500,000, General fund is $1,800,000 and Building Facility fund for City
Hall construction savings is $539,000.
cc: Project File
Day File