Loading...
Res 11-612RESOLUTION NO. 11-612 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, WASHINGTON, ADOPTING A FEE SCHEDULE FOR 2012 AND REPEALING THE FEE SCHEDULE ADOPTED IN RESOLUTION NO. 10-599. WHEREAS, the City is authorized under RCW 35A.11A20, 35A.63.100(2), and RCW 19.27.040 to require licenses for the conduct of business, permits for the construction of structures and improvements, and to impose fees to recoup the costs of processing and/or providing serviaes; and WHEREAS, the Federal Way City Code establishes the basis for the assessment and/or collection of such license, permit fees, and service charges; and WHEREAS, the City Council deemed it is advisable and necessary to provide gradual annual increases in Land Use, Mechanical, Plumbing, Public Works, Electrical, and Building permits and establish the mid-year Consumer Price Index for All Clerical Workers (CPI-V� for the Seattle- Tacoma-Bremerton area as the basis for such adjustrnents in Resolutions 98-281, 01-351, 02-377, 03-406, 04-435, OS-462, 06-490, 07-513, 08-537, 09-567, and 10-585; WHEREAS, the City Council has historically adjusted development services and permit fees under the Land Use, Mechanical Code, Plumbing Permit, Public Works, Electrical Code and Uniform Building Code in accordance to the percentage of inflation measured by the mid-year CPI- W for the Seattle-Tacoma-Bremerton area; WHEREAS, due to the current economic climate, the City Council finds it necessary to maintain current fees and not provide for an annual inflationary adjustment as the basis for such adjustments in Resolution 10-599, Resolution No.11-612 Page 1 of 3 NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, HEREBY RESOLVES AS FOLLOWS: Section l. Repealer. The Fee Schedule attached as Exhibit A to the City of Federal Way Resolution No. 10-599, is hereby repealed effective December 31, 2011. Section 2. Fee Schedule. The City of Federal Way hereby adopts the 2012`Fee Schedule as attached hereto, identified as Exhibit A and hereby incorporated in full by this reference, for the various licenses, permit processes, and other business activities of the City. Section 3. Severabilitv. If any section, sentence, clause or phrase of this resolution should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase of this resolution. Section 4. Corrections. The City Clerk and the codifiers of this ordinance are authorized to make necessary corrections to this ordinance including, but not limited to, the correction of scrivener/clerical errors, references, ordinance numbering, section/subsection numbers and any references thereto. Section 5. Ratification. Any act consistent with the authority and prior to the effective date of this resolution is hereby ratified and affirmed. Section 6. Effective Date. The fee schedule adopted by this resolution shall be effective January 1, 2012. An act consistent with the authority and prior to the effective date of the resolution is hereby ratified and affirmed Section 7. Savin�s Clause. Resolution No. 10-599, a portion of which is repealed by this resolution, shall remain in full force and effect until the effective date of this Resolution and shall Resolution No.11 -612 Page 2 of 3 remain in full force and effect in the event this resolution is invalidated in its entirety. RESOLVED BY THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, WASHINGTON this 6 day of December 2011. CITY OF FEDERAL WAY � MAYOR, PRIEST ATTEST: C��-e. CITY CLERK, CARO MCNE LY, CMC APPROVED AS TO FORM: CITY ATTORNEY, PATRICIA A. RICHARDSON FILED WITH THE CITY CLERK: 11-29-2011 PASSED BY THE CITY COUNCIL: 12-6-2011 RESOLUTION NO.: 11-612 Resolution No.11 -612 Page 3 of 3 CITY OF FEDERAL WAY 2012 FEE SCHEDULE UnalteredCat ... ... ... ... ... ...... ... ... ... ......... ... ...... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...... ... ... ... ... ... .. $60.00 UnalteredDog ............... ......... ............ ......... ...... ...... ......... ... ...... ............ ......... ............ ......... ..... ...... ............ ..... $60.00 AlteredCat ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...... ... ... ... ... ... ... ... ... ... ... ... ...... ... ...... ... ... ... ... ... ... ... ... ... ... ... ... ... ... .. $20.00 AlteredDog ...... ... ... ......... ... ... ... ... ... ... ... ......... ... ... ... ......... ... ... ... ... ... ...... ... ......... ... ... ... ... ... ... ... .. ...... ... ... ... ... ..... $25.00 Permanent License (owners 65 years of age and older) - if Altered ... ... ... ... ... ... ... ...... ... ... ... ... ... ... ... ... ...... ... . ...... ... ...... ... ... .. No Fee Permanent License (disabled) - if Altered ... ... ... ... ... ...... ... ...... ... ... ... ... ... ... ... ... ...... ... ... ... ... ... ... ... ...... ... ... ... ...... ... ...... .. No Fee Other.Fees ReplacementTag ... ... ......... ... ...... ...... ...... ... ...... ... ...... ......... ... ... ... ... ......... ......... ... ... ... ... ...... :.. ... .. ... ... ......... ... ... .. $2.00 Impound Redemption FirstImpound ... ... ... ... ...... ... ...... ... ... ... ... ... ... ... ... ......... ... ... ... ......... ......... ...... ... ... ...... ... ... ... .. ...... ............ ... .. $25.00 Second Impound (mandatory spay/neuter) ......... ... ... ... ... ...... ... ......... ......... ...... ... ... ... ... ... ... ... ... ... .. ... ... ... ... ...... ... .. 550.00 Thirdlmpoand ....................................... ......... ......... ............ .................. ......... ............ ...... . .................. ..... S'I5.00 24HourRetention............................................................................................................................................. $]0/day Additional License Fee (for unlicensed dogs/cats impounded) ... ... ...... ... ... ... ... ... ... ...... ...... ... ... ... ...... ...... ... ... ... ... ...... ... ... .. 550.00 Hobby KenneilHobby Cattery (Plus each individual animal must be licensed) ... ... ... ......... ...... ......... ... ...... ... .. ...... ... ... ... ... ... .. 550.00 Operator License (in addition to business license)* ... ... ... ... ... ... ... ... ... ... ... ... ... ......... ......... ...... ... ... ... ...... ... ... ...... ...... ... ... ...... . 5525.00 Manager or Eatertainer License ...... ... ... ...... ... ... ... ... ... ... ............ ...... ... ...... ... ............ ... ...... ... ......... ... ... ... ......... ... ......... ... $75.00 •/f the original application for license rs made subseguent to June 30, the license fee for the remainder ojthat year shall be one-half of the a»nua! license fee. Late Peuaky: A late penalty shall be charged on all applications for renewal of a license received later than seven (7) days after the expiration date (being December 31 of each year) of such ticense. The amount of penalty is calculated as a percentage of the license: 8 - 30 days past due ... ...... ......... ... ... ... ... ......... ... ... ... ......... ......... ... ...... ... ...... ... ....... ... ... ...... ... ... ... .......... ......... ... .. 25% 31 - 60 days past due ... ......... ......... ... ... ... ... ... ...... ... ...... ... ... ... ... ...... ... ... ......... ... ... ....... ... ... ... ... ......... ............. ...... . 50% 61 and over days past due ... ... ... ... ... ... ... ... ... ... ... ... ... ... ..: ... ... ... ...... ..: ... ... ... ... ... ... ... ... ... ... ....... ... ... ... ... ... ... ... ... ... .... .. ] 00.00% General Business License: New Business, all categories unless otherwise identified herein ............ .................. ...................................... ................... 575.00 BusinessRenewal ...... ... ...... ... ...... ......... ... ......... ... ... ... ... ... ... ......... ... ... ... ............ .......... ... ... ... ... ... ... ... ............. ... .. $50.00 Temporary Business License .................. ......... ......... ......... ............ ......... ......... .................. ............. ......... .............. $50.00 Duplicate Registration (replacement) ... ...... ... ... ... ... ......... ............ ... ... ... ... ... ... ... ...... ... ... ... ... ... ... ... ...... ............ ... ...... .. $15.00 Gambliag: Business Establishments Authorized by the State Gambling Commission to Operate Social Card Games and/or expanded cazd room activities: New Business, Expansion, or Change of Ownership ...... ... ... ... ... ... ... ... ... ... ... ... ...... ... ... ...... ... ... ... ... ... ... ... ... ... ....... ...... ... $525.00 Renewal......................................................................................................................................................... $125.00 Restaurants & Taverns: Restaurants per RCW 6624.400 and Tavems per RCW 6624330 authorized to sell spirits, beer, and wine or beer and wine only, by the drink for on-premises consumption with less than 50% in dedicated dining areas: • New Bnsiness, Expansion, or Change of Ownership ... ... ... ... ... ... ......... ... ... ... ... ... ... ... ... ... ....... ... ... ... ... ... ... ... ... ... ... ... ... ... . 5525.00 Renewal......................................................................................................................................................... $50.00 Adult Eatertainment Establishments: New Business, Expansion, or Change of Ownership ... ... ... ... ... ... ... ...... ... ... ... ... ... ... ... ... ... ....... ... ... ... ...... ... ... ... ... ... ... ... ... . $525.00 Renewal......................................................................................................................................................... $125.00 Late Penalty: Failure to pay any registration fee due within thirty (30) days after the day it is due shall result in a penalty of 5% on the amount of the registration fee but not less than �5, and an additional penalty of 5% or $5 whichever is higher for each succeeding month of delinquency or part thereof, not to exceed 25% of the registration fee or $25 dollara CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE � A. BUILDING Permit fee is based on total valuation, see table, as follows: NOTE: Projects containing new square footage may also be valued using the Building Valuation Data information published in the "Building Safery" joumal. This data is updated biannually. $1 to $500 ....................................................................................................................................................... For each additional $100 or fraction thereof up to and including $2,000 :..................................................... $36, Plus For each additional $1,000 or fraction thereof up to and including $25,000 :................................................. $103.5, Plus For each additional $1,000 or fraction thereof up to and including $50,000 .................................................. $598, Plus For each additional $1,000 or fraction thereof up to and including $100,000 ................................................. $985.5, Plus For each additional $1,000 or fraction thereof up to and including $500,000 ................................................. $1510.5, Plus For each additional $1,000 or fraction thereof up to and including $1,000,000 .............................................. $4910.5, Plus For each additional $1,000 or fraction thereof over $1,000,000 ................................................................ $8410.5, Plus Note: Additional fees will apply to a permit, as noted here: All development permits (including building) are chazged an automation fee. See L MISCELLANEOUS PERMIT-RELATED FEES for details. All building permits are charged an SBCC suroharge. See I. MISCELLANEOUS PERMIT-RELA1`ED FEES for details. Some building permits require plan review. See G. PLAN REVIEW for details. Some building permits require plumbing fees. See E. PLUMBING for details. Some building permits require mechanical fees. See D. MECHANICAL for details. Some building permits require a digitizing fee. See I. MISCELLANEOUS PERMIT-RELATED FEES for details. Some buiiding permits require an impact fee. See I. MISCELLANEOUS PERMIT-RELATED FEES for details. Some building permits require a South King Fire fee. See I. MISCELLANEOUS PERMIT-RELATED FEES for details. B. DEMOLITION Permit fee is based on total project demolition valuation. See the table in A. BUILDING to calculate fee. All development pemvts (including demoliNon) are charged an automation fee. See I. MISCELLANEOUS PERMIT-RELA1'ED FEES for details. All building pernilts aze charged an SBCC surcharge. See I. MISCELLANEOUS PERMIT-RELA1'ED FEES for details. C. ELECTRICAL Note: All development pemuts (including electrical) are charged an automation fee. See I. MISCELLANEOUS PERMIT-RELA1'ED FEES for details. $36.00 $4.50 $21.50 $15.50 $10.50 $8.50 $7.00 $5.50 1. "Inspected with the service" means that a separate service inspection fee is included on the same electrical work pertnit. 2. "Inspected at the same time" means all wiring is to be ready for inspection during the initial inspection trip. 3. An "outbuilding" is a structure that serves a direct accessory function to the residence, such as a pump house, or storage building. Outbuilding does not include buildings used for commercial type occupancies or addiNonal dwelling occupancies. 4. Square footage is the area included within the surrounding exterior walls of a building of a building exclusive of any interior courts. (This includes anv floor area in an attached garage, basement, or unfinished living space J (1) Residential (a) Single- and twafamily residential (new construction) First1300 sqft .................................................................................................................... ...................... Each additional 500 sqft. or portion thereo£ .......................................................................... ...................... Each outbuilding or detached garage (inspected with the service) ....................................................... ...................... Each outbuilding or detached garage (inspected separately) .............................................................. ...................... Each swimming pool (inspected with the service) .......................................................................... ...................... Each swimming pool (inspected separately) ................................................................................. ...................... Each hot tub, spa, or sauna (inspected with the service) ................................................................... ...................... Each hot tub, sPa, or sauna (inspected sepazately) .......................................................................... ...................... Each sepric pumping system (inspected with the service) ................................................................. ...................... Each septic pumping system (inspected separately) ........................................................................ ...................... (b) Multi-family residential & misc. residential structures, services & feeders (new construction) Am aci 0 to 200, 5ervice/feeder ......................................................................................................... ...................... Addirionalfeeder ................................................................................................................................. 201 to 400, Service/feeder ...................................................................................................... ...................... Additionalfeeder ................................................................................................................................. 401 to 600, Service/feeder ...................................................................................................... ...................... Additionalfeeder .......................................................................................................... ...................... 601 to 800, Service/feeder ....................................................................................:................. ...................... Additional .......................................................................................................... ...................... $122.00 $39.00 $51.00 $80.50 $80.50 $121.00 $51.00 $80.50 $51.00 $80.50 $132.50 $39.00 $164.00 $80.50 $224.00 S111.50 $287.00 SI53.50 CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE Over800, Service/feeder ........................................................................................................ ...................... $410.50 Additionalfeeder .......................................................................................................... ...................... $307.00 (c) Single or multi-family services or feeders, including circuits (altered) Ampacitv 0 to 200 ............................................................................................................................ ...................... 201 to 600 ......................................................................................................................... ...................... Over600 ........................................................................................................................... ...................... Mast or meter repair (no alterations to the service or feeder) .............................................................. ...................... (d) Single or multi-family residential circuits only (no service inspection) Note: Altered or added circuit fees are calculated per panelboard. Total cost of the alterations in an individual panel should not exceed the cost of a complete altered service or feeder of the same rating, as shown in sub-section (c) listed above. Circuits, 1 to 4(see note above) ..........................................................................................:.... ...................... Each additional (see note above) ........................................................................................ ...................... (e) Mobile homes, modular homes, mobile home parks, and RV parks Service or feeder only ........................................................................................................... ...................... Serviceand feeder ............................................................................................................... ...................... (� Mobile home park sites and RV park sites First site service or site feeder ........................................................................................................................ Each additional site service; or site feeder inspected at the same time as the firstservice or feeder ..................................................................................................... ...................... (2) Commercial and industrial (a) New service or feeder & additional new feeders inspected at the same time, includes circuits. Amuacitv 0 to 100, Service/feeder ......................................................................................................... ...................... Additionalfeeder .......................................................................................................... ...................... 101 to 200, Service/feeder ............................................................................................................................ Addirionalfeeder .......................................................................................................... ...................... 201 to 400, Service/feeder ............................................................................................................................ Additionalfeeder .......................................................................................................... ...................... C. ELECTRICAL - ConKnued (2) Commercial and industrial - Continued 401 to 600, Service/feeder ...................................................................................................... ...................... Additionalfeeder .......................................................................................................... ...................... 601 to 800, Service/feeder ...................................................................................................... ...................... Addirionalfeeder .......................................................................................................... ...................... 801 to 1000, Service/feeder .................................................................................................... ...................... Additionalfeeder .......................................................................................................... ...................... Am ci *Over 1000, Service/feeder ...................................................................................:................ ...................... Additionalfeeder .......................................................................................................... ...................... Mast or meter maintenance or repair (no alterations to the service or feeder) .......................................... ...................... *NOTE: Services over 1000 amps, and certain health care, educational, & institu6onal uses require plan review. See G. PLAN REVI�W for details (b) Altered services / feeders, NO circuits A aci 0 to 200, Service/feeder ......................................................................................................... ...................... 201 to 600, Service/feeder ...................................................................................................... ...................... 601 to 1000, Service/feeder .................................................................................................... ...................... *Over 1000, Service/feeder .................................................................................................... ...................... *NOT'E: Services over 1000 amps, and certain health care, educational, & institutional uses require plan review. See G. PLAN REVIEW for details $101.00 $164.00 $246.50 $60.50 580.50 $8.00 $50.50 $132.50 S80.50 $52.50 $132.50 $80.50 $164.00 $103.50 $307.00 $121.00 $358.00 $143.50 $463.00 $196.00 $565.00 $236.50 $616.00 $328.50 $111.50 $132.50 $307.00 5463.00 $515.50 CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE (c) Circuits only. Altered/added circuits fees are calculated per panelboard. Tota] cost of the alterations in panel(s) should not exceed the cost of new feeder(s) of the same ampacity rating. Circuits, 1 to 5(see note above) ............................................................................................... ...................... $103.50 Each additional circuit (see note above) ............................................................................... ...................... $8.00 (d) Over 600 volts surcharge per permit ........................................................................................ ...................... $103.50 (31 Temoorarv Service(s) [See WAC 296-46B-590 for information about temporary installations] Temporary services, temporary stage or concert productions A aci 0 to 60 Service/feeder ............................................................................................................. ...................... $71.00 AddiNonalfeeder ............................................................................................................. ...................... $32.00 61 to 100, Service/feeder ................................................................................................................................. $80.50 Additionalfeeder ............................................................................................................. ...................... $39.00 ]Ol to 200, Service/feeder ..................................................:."..................................................... ...................... Additionalfeeder ............................................................................................................. ...................... 201 to 400, Service/feeder ......................................................................................................... ...................... Additionalfeeder ............................................................................................................. ...................... 401 to 600, Service/feeder ......................................................................................................... ...................... Additionalfeeder ............................................................................................................. ...................... Over600, Service/feeder ........................................................................................................... ...................... Additionalfeeder ............................................................................................................. ...................... (41 Miscellaneous eauiument - commercial, industrtal, and residential (a) A Class 21ow-voltage thermostat and its associated cable controlling a single piece of utilization equipment or a single fumace and air conditioner combination. Firstthern�ostat ................................................................................................................... ...................... Each additional inspected at the same dme as the first ............................................................... ...................... (b) Class 2 or 3 low-voltage system & telecommunications systems. Includes all telecommunications, installations, fire alarm, nurse call, energy management, industrial & automation, and/or lighting control systems, and similar Class Z or 3 low-energy circuits and equipmenL First2500 sqft. or less ........................................................................................................... ...................... Each additional Z500 sqft. or portion thereo£ ......................................................................... ...................... 3103.50 $51.00 5121.00 $60.50 $164.00 $80.50 $184.50 $92.00 $60.50 $18.50 571.00 $18.50 (c) Signs and outline lighting Firstsign (no service included) ................................................................................................ ...................... $60.50 Each add'1 sign inspected at the same time on the same building or structure .................................... ...................... $28.50 (d) Yard pole, pedestal, or other meter loops only Yard pole, Pedestal, or other meter loops only .............................................................................. ...................... $80.50 Meters installed remote from service equipment & inspected at the same time as other installarions ...................................................................................................... ...................... $18.50 C. ELECTRICAL - ConHnued (e) Generators. Note: For permanently installed generators, refer to the appropriate residenHal or commercial new/altered service or feeder section. Portable generators, permanently installed transfer equipment for portable ................................. ...................... $101.00 (� Annual permits i. Annual electrical (See WAC 296-46B-900(14)] For commercial/industrial Iocallon employing fiill-dme electrical maintenance staff or having a yearly maintenance contract with a licensed electrical contractor. Note: All yeazly maintenance contracts must detail the number of contractor electricians necessary to complete the work required under the contract. This number will be used as a basis for calculadng the appropriate fee. Each inspection is based on a two-hour maximum. Number of inspec6ons 1 to 3 plant electricians ...........................................12.................................................................... ...................... $2,909.50 4 to 6 plant electricians ..........................................24.................................................................... ...................... $5.819.50 7 to 12 piant electricians ........................................36................................................................... ...................... $8,729.00 13 to 25 plant electricians ........................................52.................................................................. ...................... $12,609.00 Over25 plant electricians ........................................52.................................................................. ...................... SI2,609.00 CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE ii. Annual telecommunications [See WAC 296-46B-900(13)] For commercial/industrial location employing full-time [elecommunications maintenance staff or having a yearly mai�tenance contract with a licensed electrical / telecommunications contractor. Two-hour minimum of inspection time ................................................................................... ...................... Each additiona] hour or portion thereof, of inspection time ...................................................... ...................... (g) Permit requiring ditch cover inspection only Each1 hour or portion thereof ................................................................................................. ...................... (h) Cover inspection for elevator / conveyance instailation Note: This item is only available to a licensed/registered elevator contractor .......................................... ...................... (i) Carnival inspections i. First carnival field insoection each calendar vear Eachride and generator truck .....................:............................................................................ ...................... Each remote distribution equipment, concession, or gaming show ....................................................... ...................... If the calculated fee for the first carnival field inspection above is less than $140.00, the minimum inspectionfee shall be .................................................................................................... ...................... ii. Subseauent carnival insoections each calendar vear First 10 rides, concessions, generators, remote dist. equipment, or gaming shows .................................... ...................... Each additional ride, concession, generators, remote distribution equipment, or gaming shows ........................................................:................................................. ...................... iii. Concession(sl or ride(sl not uart ot a carnival First field inspection each year of a single concession or ride, not part of a carnival .................................. ...................... Subsequent inspection of a single concession or ride, not part of a carnivai ...................................... ...................... D. MECHANICAL Permit fee is based on total project installatlon valuaHon. See the table in A. BUILDING to calculate fee. All development permits (inc(uding mechanica]) are charged an automation fee. See I. MISCELLANEOUS PERMIT-RELATED FEES for details. Some mechanical permiu require plan review. See G. PLAN REVIEW for details. $242.50 $121.00 $121.00 $103.50 $26.50 $9.00 $153.50 $153.50 $9.00 $121.00 $80.50 E. PLUMBING Note: For the purpose of this section, a sanitary plumbing outlet on or to which a plumbing fixture or appliance may be set or attached shall be conswed to be a fixture. Fees for reconnection and retest of exis6ng plumbing systems in relocated buildings shall be based on the number of plumbing fixtures involved Permit fee is based on total number of fixtures as noted in Fixture Fees below: Permit Issuance. Per permit charge when not part of a building permit ............................................................ ...................... $31.00 All development permits (including plumbing) are charged an automation fee. See I. MISCELLANEOUS PERMIT-RELATED FEES for details. Some plumbing permits require plan review. See G. PLAN REVIEW for details. Furture fees: 1. For each plumbing fixture of trap or set of fixtures on one trap (inciuding water, drainage) piping and backflow protection therefore ....................................................................................................... ....................... 510.50 2. Rainwater s stems, er drain inside buildin ..................... $10.50 Y P � S) ................................................................................. .. 3. For each water heater and / or vent ............................................................................................... ....................... $10.50 4. For each industrial waste pretreatment interceptor, inciuding iu trap and vent excepting interceptors functioningas fixture traps ........................................................................................................ ....................... $10.50 5. For installation, alteration or repair of water piping and/or water treating equipment .................................... ....................... $10.50 6. For repair or alteration of drainage orient piping ...................................:........................................... ....................... $10.50 7. For each lawn sprinkler system or any one meter including backflow pmtection devices therefore .................... ....................... 510.50 8. For vacuum breakers or backflow protective devices on tanks, vats, etc., or for installation on u�rotected plumbing fixhues including necessary water piping: 1 to 5 fixtures .................................................................................................................. ....................... $7.50 over fixtures ................................................................................................................. ...............:....... $4.50 F. SIGN (il Permanent sien. Permit fee is based on t�t 1 project installation valuation. See the table in A. BUILDING to calculate fee. Plan review. Most sign permits require review. See G. PLAN REVIEW for details. Electrical. Electrical signs require additional fees. See C. ELECTRICAL (4)(c) for details. All development permits (including signs) are charged an sutomaGon fee. See I. MISCELLANEOUS PE1tMIT-RELATED FEES for details. Planning sureharge. Total permit fee includes a per sign planning surcharge, as follows: Firstsign .......................................................................................................................... ...................... Each additional sign on same application .............................................................................. ...................... $42.50 $17.00 CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE (21 Temoorarv sien. Note: temporary signs are by separate permit. Permitfee .............................................................................................................................. ...................... All development permits (including signs) are charged an automation fee. See I. MISCELLANEOUS PERMIT-RELATED FEES for details. G. PLAN REVIEW The specified plan review fees aze separate from and in addition to the permit fees. The plan review fee is collected at application submittal. Building permit: 65% of the building pemvt fee Mechanical permit: 65% of the mechanical pernut fee Plumbing permit: 65% of the plumbing permit fee Sisn permit: 65% of the sign perrnit fee Electrlcal permit: 35% of the electrical work permit fee plus a plan review fee of ......................................... ...................... Commercial building permits ONLY: 15% of permit fee goes to South King Fire & Rescue plan review Additional plan review required by changes / additions / revisions to plans, per hour orportion thereof ................................................................................................................... ...................... Outside consultant plan review ........................................................................................................................... Note: Fire prevenHon system plan review fees are found in Section Six. Fire Code-Annual Permits fee section. H. INSPECTIONS Other inspections / fees, per hour: 1. Inspections outside of noanal business hours ................................................................................... ...................... 2. Electrical inspections outside of normal business hours ...................................................................... ...................... 3. Reinspection ......................................................................................................................... ...................... 4. Weekend, holiday, and emergency call-out inspecrions (4-hour minimum) ...................................................................... 5. Inspections for which no fee is specifically indicated (2-hour minimum) .................................................. ...................... 6. Inspections performed by outside consultants .......................................................................................................... I. MISCELLANEOUS PERMIT-RELATED FEES Adult family home facility inspection ................................................................................................ ...................... Automation (aPPlies to all land use and development pemvts) ................................................................. ...................... Digitizing, for single-family plans not submitted in digitiaed form ............................................................ ...................... Digitizing, for commercial and multi-family plans not submitted in digitized fomt ......................................... ...................... $42.50 $103.50 $105.50 Actual Costs $74.00 $106.00 $74.0(1 $74.00 $74.00 Actual Costs $73.50 $6.00 $39.50 $118.50 Over-The-Counter (OTC) permit and review ....................................................................................... ...................... $56.50 Permit Renewal - Permits expired up to 360 days past expiration date or past date of last inspections are subject to Building Official's discretion. The renewal fee is one-half the original permit fee. Recording Fee - Recording fee will be charged per King County Records & Election fee schedule pursuant to RCW 36.198A 10 and as amended and by KC Code 1.12.120 and as amended. State Building Code Council (SBCC) surcharge ........................................................ For each additional multi-family housing unit on the same pemvt ............................. J. REFLTNDS Permit aoulications: The Building Official may suthorize the refunding of not more than 80% of the permit plan review fees paid provided the applicant presents a written request to withdraw the application prior to the commencement of staff review. The automallon fees are non-refundable. [PiOTE: The Building Official does not have purview over another department or jurisdiction's fees. Please apply for them separately, if applicable.] Issued oermits: The Building Official may authorize the refunding of not more than 80% of other, non-plan review-related building pemut fees paid provided the applicant presents a written request to cancel the permit prior to the commencement of any construcrion work covered by the pertnit and/or prior to the compietion of any inspections by City staff. The automation fees aze non-refundable. [NOT'E: The Building Official dces not have purview over another departrnent or jurisdiction's fees. Please apply for them separately, if applicable.] $4.50 $2.00r ,_ K. PENALTIES Any person who shall commence any work for which a permit is required by this Code without first having obtained a permit may be required to pay double the pemut fee fixed by this section for such work. Such double permit fee shall be in addiHonal to any penalty for a violation of the provisions of this Code. CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE i False Alarm Fee Burglary 1 st and 2nd false alarms in a registration year (July 1- June 30) ............................................................................... Free 3rd false alazms in a registration year (July 1- June 30), each alarm ........................................................................ $ 50.00 4th false alarms in a registration year (July 1- June 30), each alarm ........................................................................ $ 100.00 Sth false alarms in a registration year (July I- June 30), each alarm ........................................................................ $ 150.00 6th and successive false alarms in a registration year (July 1- June 30), each alazm ............................................................... $ 200.00 Robbery 1 st and 2nd false alarms in a registration year (July 1- June 30) ...... ......................................................................... Free 3rd false alarms in a registration year (July 1- June 30), each alarm ........................................................................ $ 75.00 4th false aiarms in a registration year (July 1- June 30), each alarm ........................................................................ $ 150.00 Sth false alamis in a registration year (July 1- June 30), each alarm ........................................................................ $ 225.00 6th and successive false alarms in a registrallon year (July 1- June 30), each alarm ..............................................................: $ 300.00 RegistrationFee ......................................................................................................................................................... $25.00 LateRegistration Fee Penalty ............................................................................................................................... $50.00 Late False Alarm Payment Penalty ......................................................................................................................... $25.00 Appeal Hearing Cancellation Fee ........................................................................................................................... $]0.00 Carnivals or Fairs: 1-10 Booths/Displays ................................................................................................................. 5100.00 11-20 Booths/Displays ................................................................................................................ $150.00 20 + Booths/Displays .................................................................................................................. $200.00 ParadeFloats ........................................................................................................................... $100.00 Temporary Membrane Swctures, Tents and Canopies (per unit) .............................................................. $100.00 Flammable or Combustible Liquids, LP-Gas, Hazardous Materials, Misc: Compressed Medical Gases ......................................................................................................... $120.00 GeneratorFuel Tanks ................................................................................................................. $120.00 Hazardous Materials (Cryogens, Etc) ............................................................................................... $200.00 Install, Remove, Abandon - Residential Heating Oil Tank ...................................................................... $50.00 LP-Gas - No Dispensing (Cylinder Exchange, Aeating, Pool Water Heating, Etc.) ......................................... $120.00 OpenBurning .................................................................................................................................................. Cryogens............................................................................................................................... $200.00 FireHydrants and Water Control Valves .................................................................................................................. DryCleaning Plants ................................................................................................................... $120.00 Piaces of Assembly : Occupant Load 50 - 299 persons .................................................................................................... $120.00 Occupant Load 300 - 999 persons ................................................................................................... $150.00 Occupant Load 1,000 or more persons ............................................................................................. $180.00 Occupant Load 50-299 & Candles/Open Flame ................................................................................... $210.00 Occupant Load 300 - 999 & Candles/Open Flame ................................................................................. $240.00 Occupant Load 1000+ & Candles/Open Flame .................................................................................... $270.00 Ma11 covered - Annual Fee .......................................................................................................... $1,000.00 Repair Garage Combinations: Repair Garage & Flammable/Combustible Liquids .............................................................................. 5210.00 RepairGarage & Hot Work ......................................................................................................... $210.00 Repair Garage & Flanunable/Combustible Liquids & LPG .................................................................... $300.00 Repair Garage & Flammable/Combustible Liquids & Hot Work .............................................................. $300.00 Repair Garage & Spraying/Dipping & Hot Work ................................................................................ $300.00 Repair Garage & Flammable/Combustible Liquids & LPG & Hot Work .................................................... $390.00 Repair Garage 8c Flammable/Combustible Liquids & Spraying/Dipping & Hot Work .................................... 5390.00 All Other Fire Code Pemvts - See Inte�national Fire Code Section 105 ...................................................... $120.00 Note: Fire Deparhnent Annua[ Permit Fee entitles app/icant to an initiul inspection and one follow-up inspection. All Other Permits (See Uniform Fire Code Section 105.8) - IniHal .............................................................................................. 'f F' C d S' 105 8 R 1 aso.00 $50.00 $132.00 $50.00 No Charge $132.00 No Charge $50.00 $80.00 5100.00 $120.00 $140.00 $160.00 $180.00 $1,000.00 $140.00 $140.00 $200.00 $200.00 $200.00 $260.00 $260.00 $80.00 All Other Pemuts (See Um orm �re o e ecuon .)- enewa ........................ ................................................................................................. Hourly Rate for Additionai Inspections Required to Secure Compliance (min. 1/2 hr) ...............................____....._....____....................... $74.00 Fire Department Review and Inspection of Building Pemvts ...................................................................................................... 15% of Building Pernut Fee, CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE Fire Prevention System Permits PermitFee (based on valuation) ............................................................................................................................. ..............Per IBC PlanReview Fee ....................................................................................................................... ....................... 65% of FPS Pemut Fee Note: Ciry retains $20.00 of total fee for processing Public Display Permit (together with $100.00 cash bond) ........................................................................•••.._............,............. $100.00 A. Boundary Line Adjustment ................................................................................................................................... $882.50 PlusFire Review @ 5% ..................................................................................................... .............:...:....: $44.50 Plus Public Works Review .................................................................................................. .................;..:.. $478.50 BindingSite Plan ..........................................................................................................................::.:.::.::......t.: 51,340.00 PlusFire Review @ 5% ........................................................................................................................,.... 564.50 PlusPublic Works Review .................................................................................................. ....................... $847.00 LandSurface Modification ................................................................................................................................ PlusPer Acre .................................................................................................................. ....................... PlusPublic Works Review .................................................................................................. ....................... LotLine Elimination ........................................................................................................................................ Plat, Preliminary ............................................................................................................................................. PlusPer Acre .................................................................................................................. ....................... PlusFire Review � 5% ............................................................................................................................. PlusPublic Works Review .................................................................................................. ....................... Plat, Final ...................................................................................................................................................... PlusPublic Works Review .................................................................................................. ....................... Plat, Short .............................................................................................................................. ....................... PlusFire Review Q 5% ..................................................................................................... ....................... Plus Public Works Review .................................................................................................. ....................... Pre -Application Meeting ................................................................................................................................... Process I- Applications (for radio tower 8c antenna structures for use by amateur radio operators required by Federal Way City Code, Section 22-1047(3)) ........................................................................................ Process I- Director's Approval for interpretations .................................................................................................. Process I- Other minor site review at hourly rate ............................................................................ ....................... Process 2- Site Plan Review [Base I.and Use Fee], Plus :............................................................................................. over 25,000 sq.ft ..................................................................................................................................... over 50,000 sq.R ..................................................................................................................................... over ]00,000 sq.ft ................................................................................................................................... PlusFire Review @ 5% ................................................................................................................................ PlusPublic Works Review ..................................................................................................... ....................... Process 3- Project Approval [Base Land Use Fee], Plus :..................................................................... ....................... over 25,000 sq.ft ..................................................................................................................................... over 50,000 sq.ft ..................................................................................................................................... over 100,000 sq.ft ............................................................................................................ ....................... PlusFire Review Q 5% ................................................................................................................................ PlusPublic Works Review ..................................................................................................... ....................... Process 4- Hearing Examiner's Decision, including variances [Base Land Use Fee], Plus :.................................................... PlusFire Review Q 5% ..................................................................................................... ....................... PlusPublic Works Review .................................................................................................. ....................... Process 4- Resldential Vsriance [Base Land Use Fee], Plus :........................................................................................ PlusFire Review @ 5% ..................................................................................................... ....................... $1,405.00 $15.50 $644.50 5172.50 $3,977.00 $79.50 $198.50 $3,261.00 $1,680.00 $1,232.50 $1,340.00 $64.50 $847.00 $458.00 $172.50 N/A $74.00 $1,083.00 5344.50 $603.00 $862.50 $54.50 $916.00 $1,277.50 $344.50 $603.00 $861.b0 $64.00 $911.50 $2,306.00 $115.50 $1,244.00 $861.00 $43.00 CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE Process 5- Quasi-Judicial Rezones [Base Land Use Fee], Plus: to RS Zone .................................................................................................................................................. $775.50 PlusPer Acre ......................................................................................................................................... $430.50 Maximum............................................................................................................................................. $18,955.00 to RM Zone ................................................................................................................................................. $1,120.00 PlusPerAcre......................................................................................................................................... $1,378.50 Maximum............................................................................................................................................. $29,984.00 Process 5- Comprehensive Pian Amendments [Base Land Use Fee], Plus :............................................... ....................... $861.00 . c :; ; ,, PlusPerAcre ......................................................................................... .....:::... ...::c:....................... 585.50 Public Notice Fee (for Process 3- 6& SEPA decisions) ........................................................................ ....................... $145.00 _ SEPA City Center Planned Action ....................................................................................................................... $147.50 PlusFire Review Fee @ 5% ................................................................................................ ....................... $7.00 PlusPublic Works Review ......................................................................................:......... �........................ E147.50 SEPA Environmental Checklist Only ................................................................................................................... $1,043.00 Plus Fire Review Fee @ 5% ................................................................................................ ....................... $49.50 Plus Public Works Review ......................................................................................................................... $507.00 SEPA Checklist as Part of Project ................................................................................................ ....................... $522.00 PlusFire Review Fee @ 5% ................................................................................................ ....................... $25.00 PlusPublic Works Review ................................................................................................. ....................... $253.50 SEPAAppeals ................................................................................................................................................ $120.50 Appeal ofAdministrative Decision* .............................................................................................................. $172.50 Appeal of Hearing Examiner Decision" .......................................................................................................... $172.50 S6oreline Permit �Base Land Use Fee], Plus :........................................................................................................... $1,537.50 over $15,000 value ..........................................................................................................................:......... $690.00 over $50,000 value .................................................................................................................................... $2 over$100,OOOvalue .................................................................................................................................. $3,791.00 over $500 > 000 value ........................................................................................................... ....................... $7,582.50 over$1,000,OOOvalue ................................................................................................................................ $11,372.00 PlusPublic Works Review ........................................................................................................................... $909.00 S6oreline Conditional Use Permit ................................................................................................. ....................... $3,652.00 PlusPublic Works Review ........................................................................................................................... $2,205.50 Shareline (Exempt Detertnination) ................................................................................................. ....................... $85.50 ShorelineVariance ................................................................................................................... ....................... $2,634.50 Plus Public Works Review ........................................................................................................................... $1,242.50 MISCELLANEOUS: AccessoryDweliing Units ........................................................................................................... ....................... $172.50 Automation fee (Applies to all Land use and Development petmits) ......................................................... ....................... $6.00 Home Occupation: StandardPermit ......................................................................................................................................... $42.50 In-Home Day Care: 12 or fewer attendees ................................................................................................................................... $42.50 Signs, First Si�n .............................................................................................................................................. $42.50 Each Additional Sign / Same Application ................................................................................ ....................... $17.00 TemporarySigns ..................................................................................................................................... $42.50 Zoning Fees Newsingle family ....................................................................................................................................... $55.00 Zoninginquiries ......................................................................................................................................... $55.00 Note: 1. Appeal Fee shall be reimbursed in the event the reviewing authority determines that the appellant has substantially prevailed in the appeal acrion. 2. The fire district administrative review fee in an amount equal to 5% of the land use fee imposed is charged and collected by the City and paid to the fire district. 3. Additional fees will be required to pay for any time spent on Land Use Applications by the Department of Public Works above the number of hours covered by the base amount allocated to Public Works for each application. CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE B. REFUNDS OF LAND USE FEES. The Filing Fees as set forth in the Fee Schedule for the City are established to defray the cost of posting and processing and the proceedings in connection with a land use application. The Director of Community Development Services may authorize the refunding of not more than 80% of the total application fees paid provided the applicant presents a written request to withdraw or cancel prior to routing of the application for staff review. Miscellaneous Permits (Land Use, Public Works & Building Permit Services): Any public work, land use, building permits not covered by the fee schedule, if performed by employee, is based on actual hourly cost, plus benefits of 30%, plus overhead of 25%. Any private or public professional service contract needed will be billed 100%, plus 10% billing and administrative charges. Maps Plats, Miscellaneous .................................................................................................................... ....................... Cost+ 10% Photocopies, Black and White Per Page .....................:.............................................................................. ....................... $0.15 Photocopies, Color Per Page .................................................................................................................. ....................... $0.25 Scanning Page ................................................................................................................................ ....................... $0.15 D Size Rolled Plan Copies, Per Sheet ......................................................................................................... ....................... $5.00 E Size Rolled Plan Copies, Per Sheet ........................................................................................................ ....................... $7.00 AudioDuplieation, Per CD ............................................................................................................................................ $10.00 VideoDuplication, Per DVD ......................................................................................................................................... $25.00 Clerk Certification ............................................................................................................................ ....................... $5.00 Facsimile Usage (incoming/outgoing) 1 st Page .............................................................................................. ....................... $3.00 eachadditional page ..................................................................................................................... ....................... $1.00 BoundPrinted Documents ..................................................................................................................... ....................... Actual Cost GIS Map and Data Requests *: 8 1/2 by I 1- Paper - Color ........................................................................................................... ....................... $4.0(1 8 1!2 by l t- Paper - Black & White ................................................................................................ ....................... S3.00 8 1/2 by 1 I- Mylaz - Color ........................................................................................................... ....................... $5.00 8 1/2 by 11 - Mylaz - Black & White ............................................................................................... ....................... $4.00 11 by 17 - Paper - Color .............................................................................................................. ....................... $5.00 11 by 17 - Paper - Black & White ................................................................................................... ....................... $4.00 11 by 17 - Mylar - Color .............................................................................................................. ....................... $6.00 11 by 17 - Mylar - Black & White ................................................................................................... ....................... $5.00 Upto 34 by 44 - Paper - Color ....................................................................................................... ....................... $10.00 Up to 34 by 44 - Paper - Black & White ........................................................................................... ....................... $7.00 Upto 34 by 44 - Mylar - Color ...................................................................................................... ....................... $37.00 GIS Map and Data Requests - Continued Up to 34 by 44 - Mylar - Black & White ........................................................................................... ....................... $31.00 3%z Floppy Disk or CD ROM (per disk/CD) ....................................................................................... ....................... $1.50 * Maps that require extensive processing time or require additional ink and plotting supplies will be charged at a higher rate. Applicable sales tax will be added to t6e costs Staff Time to Complete Request, Per Hour ........................................................................................ ....................... $35.00 ComputerUsage, Per Hour ........................................................................................................... ....................... $15.00 Note: Staff time and computer usage will only be charged on requests for custom products. Steel Lake Picnic Rentals & Special Events Picnic Rentals For Residents Reservations are from 10:00 am - 4 pm- AddiNons hours charged after 4 pm #1 Steel I.ake Park Covered Area - Tables 12/Capacity 120BBQ 2 Groups1-80/Season Rate .......................................................................................................... ....................... $60.00 Groups1-80/Off- Season Rate ........................................................................................................................... $45.00 After 4 P.M. - add $15/hr for both Season and Off-Season Groups81-120/Season Rate ..................................................................................................... ....................... $90.00 Groups 81-120/Off- Season Rate ...................................................................................................................... $68.00 After 4 P.M. - add $25/hr for both Season and Off-Season #2 Steel Lake Park - Tables 8/Capacity 80BBQ 2 SeasonRate ........................................................................................................................ ....................... $60.00 Off-Season Rate ................................................................................................................... ....................... $45.00 After 4 P.M. - add $15/1v for both Season and Off-Season #3 Steel Lake Park - Tables 8/Capacity 80BBQ 2 SeasonRate ........................................................................................................................ ....................... $60.00 Off-Season Rate ................................................................................................................... ....................... $45.00 After 4 P.M. - add $ I S/hr for both Season and Off-Season #4 Steel Lake Pazk - Tables 8/Capacity 80BBQ 1 SeasonRate ........................................................................................................................ ....................... $60.00 Off-Season Rate ................................................................................................................... ....................... $45.00 After 4 P.M. - add $15/hr for both Season and Off-Season CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE #5 Steel Lake Park - Tables 12/Capacity 120BBQ 1/small ballpark Groups1-80/Season Rate .......................................................................................................... ....................... Groups1-80/Off- Season Rate ................................................................................................... ....................... After 4 P.M. - add $15/hr for both Season and Off-Season Groups81-120/Season Rate ..................................................................................................... ....................... Groups81-120/Off- Season Rate ............................................................................................... ....................... After 4 P.M. - add $25/hr for both Season and Off-Season 'Season rates applies May-Oct and Off-season rate applies Nov-April For Noo-Residents ALL year round Reservations are from 10:00 am - 4 pm- Additions hours chazged after 4 pm #1 Steel Lake Pazk Covered Area - Tables 12/Capacity 120BBQ 2 Groups1-80 ...........................:.............................................................................................. ....................... After 4 P.M. - add $22/hr Groups81-120/ ............................................................................................................................................ After 4 P.M. - add $27hr #2 Steel Lake Park - Tables 8/Capacity 80BBQ 2 ................................................................................... ....................... Atter 4 P.M. - add $20/Iv #3 Steel Lake Park - Tables 8/Capacity 80BBQ 2 ................................................................................... ....................... After 4 P.M. - add $20/hr #4 Steel Lake Park - Tables 8/Capacity 80BBQ 1 ................................................................................... ....................... After 4 P.M. - add $20/hr #5 Steel Lake Park - Tables 12/Capacity 120BBQ 1/small ballpark Groups1-80 .........................................................:................................................................ ....................... After 4 P.M. - add $22/hr Groups81-120/ ..................................................................................................................... ....................... After 4 P.M. - add $27/hr '�Note: Groups over 120 require a Speciai Events Permits and subject to a different fee schedule and requirements. Special Events For Residents Group Size: 50 or less SeasonPemut ................................................................................................................. ....................... Off-Season Pernvt ............................................................................................................ ....................... 51-I50 SeasonPermit .......................................................:......................................................... ....................... Off-Season Permit ............................................................................................................ ....................... I51-250 SeasonPermit ................................................................................................................. ....................... Off-Season Permit ............................................................................................................ ....................... •Season rates applies May-Oct and Off-season rate applies Nov-April For Non-Residents ALL year round Group Size: 50 or less Permit... .. . ... . .. . .. . . . . . . . . . . . . ... . . . . . . . .. . . . ... ... ... ... . .. ... ... . . . . .. . .. . .. . . . . . . . . . ...... . ... ... . . . ... . . . . . . ... .. . . .. ... . . . . . .. . .. .. . . ... ... ... .. 51-I50 Permit. .. .. . ... . .. . . . . .. . . . . . . ... .. . . .. . .. ... . .. ... ... ... . .. . ... .. . .. ... ... .. . . . . . .. ... . .. .. ... . . ... ... ... ... . .. . . . . . . . . . ... .. . . . . .. . . . ... . . . ... ... ... .. For Non-Residents ALL year round - continued Group Size: 151-250 Pemtit........................................................................................................................... ....................... Damage Deposit Group Size: 1-250 ...................................................................................................................:.............. ....................... 251-500 .............................................................................................................................. ....................... 501-800 .............................................................................................................................. ....................... 800-1000 . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Refundable if no damage on-site $60.00 $45.00 $90.00 $68.00 $90.00 $135.00 $90.00 $90.00 590.00 $90.00 $135.00 $50.00 $38.00 $100.00 $'75.00 $150.00 $113.00 $75.00 $150.00 $225.00 $100.00 $200.00 $300.00 $400.00 Addirional charges on ALL permits/reservations: City-supplied addirional tables/ $10 ea City-supplied additional trash cans/$5 ea Electricity (if on-site)/$20 for 4 hours r$50 for day (10 hr max) CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE City Hail Room Rentals Council Chambers (per hour) ........................................................................................................ ....................... $60.00 Non-Council Chamber Meeting Rooms (per hour) ............................................................................... ....................... $30.00 PawnbrokerLicense ............................................................................................................................ ....................... $325.00 SecondhandDealer License ................................................................................................................... ....................... $50.00 Late Penaity: A late penalty shall be charged on all applications for renewal of a license received later than seven (7) days after the expiration date (being December 31 of each year) of such license. The amount of penalry is calculated as a percentage of the license: Late Penalty: - Continued 8- 30 days past due ................................................................................................................... ....................... 25% 31- 60 days past due .................................................................................................................. ....................... 50% 61 and over days past due .................................................................................................................................... $1.00 Annualfee ...................................................................................................................................................... $175.00 Annualfee after July i ................................................................................................................ ....................... $100.00 Per Event or Limited Peanit, per day ............................................................................................... ....................... $50.00 Renewallate charge fee ............................................................................................................... ....................... $75.00 Processing fee for applications received less than 30 days from the event .................................................... ....................... $75.00 Litter control security deposit - cash or bond ...................................................................................... ....................... S t,000.00 Appealfee ............................................................................................................................... ....................... 575.00 A. Building Moving and Oversize/Overweight vehicie Permit. 1. Building moving through City .................................................................................................. ....................... $85.50 2. Building moving into or within City ............................................................................................ ....................... $85.50 Pre-move inspection, the higher of actual cost or ............................................................................ ....................... $203.0() 3. Oversize/overweight vehicle pernut ............................................................................................. ....................... $85.50 B. Street and/or Easement Vacation Application 1 -3001ineal feet ........................................................................................................................ ....................... $833.50 every100 lineal feet thereafter, per 100 LF ......................................................................................... ....................... $85.50 C. Right-ot Way Use Permit, includes 1 inspection 1. Individual single faznily homeowner applications .............................................................................. ..................... 2. All other applicallons ............................................................................................................... ..................... 3. Supplement plan review fee for any and all permits, per hour ................................................................ ..................... 4. Supplement construction inspection for any and all pemrits, per hour ...................................................... ..................... 5. Inspection outside of normal business hours (at standard Inspection rate times 1.5) ..................................... ..................... 6. Weekend, holiday, and emergency call out inspection ........................................................................ ..................... 7. Re-inspection ........................................................................................................................ ..................... 8. Job start penalty fee ................................................................................................................ ..................... D. Right-of-Way Code Variance Request, plus recording fee * ................................................................ ................. E. Development Review Fee. 1 . Single Family .....................................................................................................,................ ....................... 2. Short Subdivisions Construction Plans (Up to 8 hours of review dme) ................................................... ....................... a. Supplemental plan review/construction service fee, per hour ......................................................... ....................... b. Conshuction Inspection Fee, per hour ..................................................................................... ....................... 3. Subdivisions and Commercial/Industrial Developments .................................................................... ....................... Construction Plans (up to 12 hours of review time) a. Suppiemental plan review/construction service fee, per hour ................................................................................. b. Construcrion Inspection Fee, Per hour ..................................................................................... ....................... F. Concurrency Trips generated: - If less than 10 dmes (4 hours) ................................................................................................. ....................... - If between 10 and 50 times (16 hours) ........................................................................................ ....................... - If between 50 and 500 rimes (32 hours) ....................................................................................... ....................... - If greater than 500 times (48 hours) ............................................................................................ ....................... $189.00 $262.50 $68.50 $61.00 $110.50 (4 hours minimum) $I10.50 $120.00 $85.50 $68.50 $549.50 $68.50 $61.00 5824.50 $68.50 $61.00 $344.50 $1,584.50 53,374.50 $5,576.50 G. Miscellaneous Public Works Permits and Services (Same fee structure under Section Nine/Miscellaneous Fees) * Recording Fee per chapter 36.198.010 RCW and as amended and K.C. Code 1.12.120 and as amended CITY OF FEDERAL, WAY 2012 FEE SCHEDULE Rightof Way Activity Permit Fee ............................................................... _........................ ..................... .................. ..... $42.50 Pursuant to King Count}+ Fee Schedule PUBLIC BATHHOUSE BUSiNESSES: I. Public Bathhouse Business (in addition [o business license) ...... ... ......... ............ ......... ... ...... ............ ..... .................. ..... 575.00 2. Bathhouse Attendant ... ... ... ... ... ... ... ... ... ... ... ... ...... ... ... ... ... ......... ... ... ... ... ... ... ... ... ... ... ...... ... ... ... ... ... ... ... ... ... ... ... .. $75.00 3. Sathhouse Manager ..............: ......... ......... ... ...... ............ .................. ............ ......... ......... ......... . .................. ..... $75.00 4. Late Penalty: A late penalry shalt be charged on all applications for renewal of a license received later than seven (7) days after the expiration date (being December 31 of each year) of such license. The amount of penalty is calculated as a percentage of the license: 8 - 36 days past due ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ....... ... ... ... ... ... ... ... ... ... ... ... ... .. 25% 31 - 60 days past due ... ...... ... ... ... ... ... ... ... ... ...... ... ... ... ... ... ... ... ... ... ... ...... ... ... ... ... ................... ... ... ... ... ... ... ... ... .. 50% 61 and over days past due ... ... ... ... ... ... ... ... ... ...... ... ... ... ... ...... ... ... ...... ...... ... ... ...... ... ......... ....... ... ... ... ... ...... ... ... .. $I.00 Proretion: The entire annuaf [icense jee sha!! be paid jor the applicable cafendar year regardless ojwhen Ihe applecallon jor license is made and sha!! not be prorated for any part of !he year except lhat rf the original application jor license is made subsequertt to June 30, the license fee for Ihe remainder of thal year shall be one-half of Ihe annua! license fee. Annual license renewal.c shall be required m be oblarned and paid in fu(1 by January 31 of each respective year. School ImpaM Fee: - Review in progress Single-Family Residences, per dwelling unit ............ ............ .................. ............ ................................. ..................... .. $4 PlusCity Administrative Fee @ 5% ... ... ... ... ...... ...... ... ... ... ... ... ...... ... ... ... ... ... ...... ......... ... ... ... ... ...... ... ... ... ...... .. $201.00 Multi-Family Residences, per dwelling unit ..................................... ......... ......... .................... ......... ... . .................. ..... $1,253.00 Plus City Administrative Fee Q 5% ......... .................. ......... ......... ............. .................. ......... ... .................. ..... $63.00 Traffic Impact Fee - Effective Date 3ulv F. 2010 Land Use A. Residential Single Family (Detached) per dwelling ... ... ... ... ... ... ......... ... ... ... ... ... ... ... ... ...... ... ... ... ............... ... ... ... ... . ... ... ...... ... ... ..... Multi-Family per dwelling ............ ......... ......... ......... ..................... ......... ..................... ......... ......... . ....................... SeniorHousing per dwelling ... ...... ...... ... ...... ... ... ......... ... ... ... ... ... ... ... ... ...... ............ ... ...... ... ... ... ... .... ...... ...... ...... ... .. MobileHome in MH Park per dwelling ...... ...... ... ... ... ... ...... ... ... ... ... ... ... ... ...... ... ... ... ... ... ......... ... ... ... ... ... ... ... ... ... ... ... .. B. Commerical - 5ervices Drive-in Bank per sf/GFA ... ... ... ... ... ... ......... ... ... ... ......... ......... ... ... ... ... ... ... ......... ... ... ...... ... ... ... ...... . ...... ............ ... .. Hotelper room ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ..... ... ... ... ... ... ... ......... ... ... ... ... ... ... ... ... ... . ... ... ... ... ... ... ... .. Motelper room ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ......... ... ... ... ... ... ... ... ... ... ... ... ... ... .. ... ... ... ... ... ... ... .. DayCare Center per sflGFA ......... ... ... ... ... ... ... ... ...... ... ... ... ... ......... ... ...... ... ... ......... ... ... ... ... ... ... ... ... . ...... ............ ... .. Libraryper sf/GFA ... ... ... ... ... ... ...... ... ...... ... ... ... ... ... ... ... ...... ... ......... ......... ... ... ... ... ...... ......... ... ...... ......... ... ... ... ... .. PostO�ce per sf/GFA ...... ... ... ...... ... ... ... ... ... ... ... ... ... ... ...... ... ... ...... ... ... ............ ...... ... ......... .:.... ... .. ...... ... ... ... ... ... .. ServiceStation per VFP ... ...... ... ...... ...... ... ...... ... ... ... ... ... ... ... ... ... ... ... ... ... ............... ... ... ... ... ... ... ... ... . ...... ... ... ...... ... .. Service Statio� with Minimart per sf/GFA ... ... ... ... ... ... ......... ... ... ... ... ... ... ... ... ... ............ .................. ... ... ......... ... ...... ... .. AutoCare Center per sflGLA ... ... ... ... ...... ...... ... ... ... ... ... ... ... ... ... ... ... ...... ... ... ... ......... ...... ... ... ... ... ... ... ............ ... ... :.. .. MovieTheater per seat ... ......... ...... ... ... ......... ... ... ... ... ... ... ... ...... ... ... ... .................. ... ... ... ...... ... ... ... .. ... ... ... ... ... ... ... .. HealthClub per sf/GFA ... ... ......... ... ... ... ... ... ... ... ... ... ... ... ... ... ...... ... ... ...... ............ ... ... ... ... ... ... ... ... ... . ... ... ... ... ... ... ... .. C. Commercia! - Institutional ElementarySchool per sUGFA ..................... ......... ......... ......... .................. .............................. ...... .. .................. ..... Ivliddle/Jr High School per sUGFA ......... ... ... ... ... ... ... ... ... ... ... ... ...... ... ... ... ...... ... ... ............ ... ... ... ... ... ... .:. ... ...... ......... .. High School per sUGFA ... ... ...... ... ... ... ... ... ... ... ... ... ... ... ...... ... ... ... ... ... ...... ......... ...... ... ... ... ... ... ... ... ... ... ... ...... ......... .. AssistedLiving, Nursing Home per bed ... ... ... ... ...... ... ... ...... ... ... ... ... ... ...... ...... ... ... ... ... ... ......... ... ... ... ... ... ... ... ... ...... ... .. Churchper sf/GFA ... ... ...... ...... ... ... ... ... ... ... ... ... ...... ... ...... ... ... ... ... ... ......... ... ... ... ... ... ... ......... ... ...... . ... ... ...... ... ... ... .. Hospitalper sf/GFA ............ ............ ......... ......... ......... ......... ......... ..................... ......... ...:..... ........ .................. ..... D. Commercial-Itestaurant Restaurantper sflGFA ... ... ... ... ... ...... ... ... ... ... ... ... ... ... ... ...... ... ... ... ... ... ... ......... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... .. High Turnover Restaurant per sflGFA ...... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ...... ... ... ... ... ...... ......... ... ...... ... .. ... ... ... ...... ... ..... Fast Food Restaurant per sf/GFA ... ... ... ... ... ... ... ... ... ... ... ... ... ...... ...... ... ... ... ... ... ... ... ......... ... ... ... ... ... ... .. ... ...... ... ...... ... .. Espresso with Drive-Through per sf/GFA ... ...... ... ... ... ... ... ... ... ... ...... ... ... ... ... ...... ... ...... ... ............ ... ... ... . ... ... ... ... ... ... ... .. $3,111.94 $2,019.46 $764.12 $1,454.29 $20.46 $2,077.56 $1,655.01 516.45 $8.19 $12.48 $8,302.85 543.59 $4.58 $120.47 57.23 $1.45 $2.26 $2.53 $542.28 $1.79 $3.21 513.45 $13.55 $29.79 $26.41 Plus City Adm iaistrative Fee @ 3% ....... ... ... .......... ... .:. ... ...... ...... ... ...... ... ...... ... ... ... ... ... ... ... ... ... ... ... ....... ... ... ... ...... ... ... ... .... C1TY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE E. Commercial - Retail Shopping ShoppingCenter per sflGLA ......................................................................................................... ....................... Supermarketper sf/GFA ............................................................................................................... ....................... ConvenienceMarket per sf/GFA ..................................................................................................... ....................... Free Standing Discount Store per sf/GFA .......................................................................................... ....................... Hardware/Paint Store per sf/GFA .................................................................................................... ....................... SpecialtyRetail Center per sf/GFA .................................................................................................. ....................... FurnitureStore per sf/GFA ................................................................................................................................... Home Improvement Superstore per sf/GFA ........................................................................................ ....................... Pharmacy with Drive-Through per sUGFA ...........:............................................................................. ....................... CarSales -New/ Used per sf/GFA ................................................................................................... ....................... F. Commercial - Otfice • GeneralOffice per sf/GFA ............................................................................................................ ......:................ c - Medical Office per sf/GFA .........................................................................:...............................:.. .....:...:..:.......... ' G. Industrial Light Industry/Manufachuing per sf/GFA .......................................................................................... ....................... HeavyIndustry per sf/GFA ........................................................................................................... ....................... IndustrialPark per sf/GFA ............................................................................................................ ....................... Mini-Warehouse/Storage per sf/GFA ................................................................................................ ....................... Warehousingper sf/GFA .............................................................................................................. ....................... City Center ImpaM Fee Rates A. Resideutial Multi-Family (CC) per dwel►ing ...................................................................................................... ....................... Senior Housing (CC) per dwelling ................................................................................................... ....................... B. Commerciai - Services Drive-in Bank (CC) per sf/GFA ...................................................................................................... ....................... DayCare Center (CC) per sf/GFA ................................................................................................... ....................... L'brary (CC) per sf/GFA .............................................................................................................. ....................... PostOffice (CC) per sflGFA .......................................................................................................... ....................... MovieTheater (CC) per seat .......................................................................................................... ....................... HealthClub (CC) per sf/GFA ................................................................................................................................ C. Commercial - Restaurant Restaurant(CC) per sf/GFA .......................................................................................................... ....................... High Turnover Restaurant (CC) per sf/GFA ........................................................................................ ....................... FastFood Restaurant (CC) per sf/GFA .............................................................................................. ....................... D. Commercial - Retail Shopping ShoppingCenter (CC) per sf/GLA ................................................................................................... ....................... Superr►iarket (CC) per sf/GFA ........................................................................................................ ....................... Pharmacy with Drive-Through (CC) per sf/GFA .................................................................................. ....................... E. Commercial - Ofiice GeneralOffice (CC) per sf/GFA ..................................................................................................... ....................... MedicalOffice (CC) per sf/GFA ..................................................................................................... ....................... GFA = Gross F[oor Area GLA = Gross Leasable Area CC = City Center For uses with Untt of Measure in sF, trip rate is given as trips per 1,000 sF VFP g Vehicle Fueling Positions (Maximune number ojvehic[es that can be fueled simultaneoss/y) City Administrative fee ot 3% will be added to the total Tra�c Impact Fees charged. $5.01 $14.56 $26.99 $6.04 $2.90 $2.03 $0.40 $3.07 $7.74 $730 $4.72 $9.14 $3.42 $239 $3.03 $0.92 $1.13 $1,453.68 $550.08 $1432 $11.52 $5.73 $8.74 $84.00 $5.06 $9.42 $9.49 $20.85 $3.51 $10.19 $5.42 $2.83 $5.48 CITY OF FEDERAL WAY 2012 PROPOSED FEE SCHEDULE CaseReport , 1st 10 pages ............................................................................................................ ....................... $]0.00 Traffic AccidentReport, lst lOpages ............................................................................................... ....................... $10.00 Reports exceeding ten (10) pages, pe� page ......................................................................................... ....................... $0.15 Photograph Duplication (from film) ................................................................................................. ....................... $2 per photo/ $]0 minimum Videotapes, per DVD ................................................................................................................. ....................... $25.00 Digital audio and image files, on CD, per disk .................................................................................... ....................... $10.00 FingerprintCaz ...........................................................................................................:................ ....................... $10 1 sd$3 ea additional PhotoID Card .......................................................................................................................... ....................... $]0.00 ConcealedPistol License - New ...................................................................................................... ....................... $60.00 Concealed Pistol License - Renewal ............................................................................................... ....................... 532.00 1' !R ' $1000 Concealed Pistol L�cense - Dup �cate eissuance ................................................................................. ....................... . Lamination..................................................................................................................................................... $5.00 Concealed Pistol License Late Fee (if applicable) ................................................................................ ....................... $10.00 Traffic School (including Police and Court costs) ................................................................................ ....................... $115.00