Loading...
AG 14-093' RETURN TO: -71 EXT: 6 C, y 1 CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM I. ORIGINATING DEPT. /DIV:""� 2. ORIGINATING STAFF PERSON: ��. EXT: 3. DATE REQ. BY: 4. TYPE OF DOCUMENT (CHECK ONE): ❑ CONTRACTOR SELECTION DOCUMENT (E.G., RFB, RFP, RFQ) ❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT ❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT • GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/ CDBG • REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT (E.G. BOND RELATED DOCUMENTS) • ORDINANCE ❑ RESOLUTION �1 CONTRACT AMENDMENT (AG #): - (�� '� ❑ INTERLOCAL ❑ OTHER ` 5. PROJECT NAME: 6. 7 8. NAME OF CONTRACTOR t Q.� L "- ADDRESS: 3iiZ ' ,.T,- TELEPHONE E -MAIL: 13 FAX: SIGNATURE NAME:��, r, TITLE EXHIBITS AND ATTACHMENTS: ❑ SCOPE, WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS /CERTIFICATE [:]ALL OTHER REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT /AMENDMENTS TERM: COMMENCEMENT DATE: COMPLETION DATE: 3l� 9. TOTAL COMPENSATION $ %,-�) ;�. (INCLUDE EXPENSES AND SALES TAX, IF ANY) (IF CALCULATED ON HOURLY LABOR CHARGE - ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES) REIMBURSABLE EXPENSE: ❑ YES ❑ NO IF YES, MAXIMUM DOLLAR AMOUNT: $ IS SALES TAX OWED ❑ YES ❑ NO IF YES, $ PAID BY: ❑ CONTRACTOR ❑ CITY ❑ PURCHASING: PLEASE CHARGE TO: 10. DOCUMENT /CONTRACT REVIEW INITIAL/ DATE REVIEWED INITIAL / DATE APPROVED • PROJECT MANAGER • DIRECTOR • RISK MANAGEMENT (IF APPLICABLE) ❑ LAW 11. COUNCIL APPROVAL (IF APPLICABLE) COMMITTEE APPROVAL DATE: COUNCIL APPROVAL DATE: 12. CONTRACT SIGNATURE ROUTING ❑ SENT TO VENDOR/CONTRACTOR I DATE SENT: a11� r,I DATE REC'D: -21�) ❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE, LICENSES, EXHIBITS INITIAL/ DATE SIGNED • LAW DEPARTMENT • CHIEF OF STAFF • SIGNATORY (MAYOR OR DIRECTOR) {CITY CLERK _ I 1VASSIGNED AG# AG# - VSIGNED COPY RETURNED DATE SENT: �j Gyi�Leit¢ COMMENTS: 11/9 AG# 14 -093 PROJECT NUMBER Town Square Park PROJECT TITLE CITY OF FEDERAL WAY CONTRACT CHANGE ORDER AGREEMENT #2 CHANGE ORDER NUMBER SUMMARY OF PROPOSED CHANGES: 10/27/14 EFFECTIVE DATE Henderson Partners, LLC CONTRACTOR The time provided for completion in the Contract is ❑ Unchanged ® Increased ❑ Decreased by 59 Calendar Days. This Document shall become an Amendment to the Contract and all provisions of the Contract not amended herein will apply to this Change Order. Will this change affect expiration or extent of Insurance coverage? ❑ Yes ® No If "Yes" Will the Policies Be Extended? ❑ Yes ❑ No PRICE CHANGE LUMP SUM: INCREASE $ DECREASE $ UNIT PRICE: THE ITEMS ARE APPROXIMATE OR ESTIMATED QUANTITIES INVOLVED IN THIS CHANGE ITEM NO. ITEM QTY. UNIT PRICE ADD OR DELETE TOTAL NET CONTRACT: INCREASES DECREASE $ STATEMENT: Payment for the above work will be in accordance with applicable portions of the standard specifications, and with the understanding that all materials, workmanship and measurements shall be in accordance with the provisions of the standard specifications, the contract plans, and the special provisions governing the types of construction. CHANGE ORDER AGREEMENT 1 1 /10 DEPARTMENT RECAP TO DATE: ORIGINAL CONTRACT AMOUNT PREVIOUS CHANGE ORDERS THIS CHANGE ORDER *ADJUSTMENTS NEW CONTRACT AMOUNT ADJUSTMENTS CHANGE ORDER ESTIMATE IS HEREBY *Adjustments: €INCREASED €DECREASED PAY THIS ADJUSTED AMOUNT: DIRECTOR'S SIGNATURE CHANGE ORDER AGREEMENT 2 1/10 RETURN TO: ft-y� ---& EXT: ( q c) 1. 2. 4. CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM ORIGINATING DEPT/DIY: PROSr / i" C ORIGINATING STAFF PERSON: 1 �-�� „� �� r t f EXT: 3. DATE REQ. BY: TYPE OF DOCUMENT (CHECK ONE: ❑ CONTRACTOR SELECTION DOCUMENT (E.G., RFB, RFP, RFQ) ❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT ❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT ❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES / CDBG • REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT (E.G. BOND RELATED DOCUMENTS) • ORDINANCE ❑ RESOLUTION CONTRACT AMENDMENT (AG#): . > ❑ INTERLOCAL ❑ OTHER 5. PROJECT NAME: �(� i vy� 6. NAME OF CONTRACTOR: ADDRESS: E -MAIL: -�-- SIGNATURE NAME: FAX:_ TITLE: 7. EXHIBITS AND ATTACHMENTS: ❑ SCOPE, WORK OR SERVICES ❑ COMPENSATION ❑ INSURANCE REQUIREMENTS /CERTIFICATE ❑ ALL OTHER REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT /AMENDMENTS CFW LICENSE # BL, EXP. 12/31/ UBI # , EXP. .i / z✓/ / I S H. TERM: COMMENCEMENT DATE: COMPLETION DATE: 9. TOTAL COMPENSATION: $ i, �) ) 11, CLUDE EXPENSES AND SALES TAX, IF ANY (IF CALCULATED ON HOURLY LABOR CHARGE - A ACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES) REIMBURSABLE EXPENSE: ❑ YES ❑ NO IF YES, MAXIMUM DOLLAR AMOUNT: $ IS SALES TAX OWED: ❑ YES ❑ NO IF YES, $ ❑ PURCHASING: PLEASE CHARGE TO: 3ti� - ]) no -- L51 -% Y) 9' 1 � -- V5 0 10. DOCUMENT/ CONTRACT REVIEW ❑ PROJECT MANAGER ❑ SUPERVISOR ❑ DIRECTOR ❑ RISK MANAGEMENT (IF APPLICABLE ❑ LAW DEPT PAID BY: ❑ CONTRACTOR ❑ CITY INITIAL/ DATE REVIEWED INITIAL/ DATE APPROVED 1 11. COUNCIL APPROVAL (IF APPLICABLE COMMITTEE APPROVAL DATE: COUNCIL APPROVAL DATE: 12. CONTRACT SIGNATURE ROUTING ❑ SENT TO VENDOR/CONTRACTOR DATE SENT: DATE REC' D: ❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE, LICENSES, EXHIBITS INITIAL/ DATE S[GNED ❑ LAW DEPT ❑ SIGNATORY (MAYOR OR DIRECTOR ❑ CITY CLERK ❑ ASSIGNED AG # AG# SIGNED COPY RETURNED DATE SENT: �j Z�1 11f ❑ RETURN ONE ORIGINAL COMMENTS: 11/9 AG # 14 -083 PROJECT NUMBER Town Square Park PROJECT TITLE CITY OF FEDERAL WAY CONTRACT CHANGE ORDER AGREEMENT #1 CHANGE ORDER NUMBER SUMMARY OF PROPOSED CHANGES: 9/10/14 EFFECTIVE DATE Henderson Partners LLC CONTRACTOR The time provided for completion in the Contract is X Unchanged ❑ Increased ❑ Decreased by Calendar Days. This Document shall become an Amendment to the Contract and all provisions of the Contract not amended herein will apply to this Change Order. Will this change affect expiration or extent of Insurance coverage? ❑ Yes X No If "Yes" Will the Policies Be Extended? ❑ Yes ❑ No PRICE CHANGE LUMP SUM: INCREASE $7,920.15 DECREASE $ UNIT PRICE: THE ITEMS ARE APPROXIMATE OR ESTIMATED QUANTITIES INVOLVED IN THIS CHANGE See attached highlighted spread sheet for back up $7,233.01 + sales tax = $7,920.15 ITEM NO. ITEM QTY. UNIT PRICE ADD OR DELETE Lump Sum and Force Account; concrete bases for picnic tables, repair concrete steps, additional ADA stall, Add blue to circle and T & M (see attached sheet ). TOTAL NET CONTRACT: INCREASE $7,920.15 DECREASE $ STATEMENT: Payment for the above work will be in accordance with applicable portions of the standard specifications, and with the understanding that all materials, workmanship and measurements shall be in accordance with the provisions of the standard specifications, the contract plans, and au governing the types of construction. -- `ttiz1(4- CONTRACTOR'S DIRECTOR'S SIGNATURE SIGNATURE DATE CHANGE ORDER AGREEMENT 1 1 /10 DEPARTMENT RECAP TO DATE: *Adjustments: ORIGINAL CONTRACT AMOUNT $267,046.41 PREVIOUS CHANGE ORDERS $0 THIS CHANGE ORDER $7,920.15 *ADJUSTMENTS $ NEW CONTRACT AMOUNT $274,966.56 ADJUSTMENTS CHANGE ORDER ESTIMATE IS HEREBY ❑ INCREASED $ ❑ DECREASED $ PAY THIS ADJUSTED AMOUNT: $_ 1 DI R' S SIGNATURE '4"` CHANGE ORDER AGREEMENT 2 1/10 Henderson Partners, LLC PERIODIC PAYMENT REQUEST BREAKDOWN SHEET City of Federal Way - Interim Town Square Park PROJECT HENDERSON PARTNERS, LLC CONTRACTOR CONTRACT NUMBER August 1 - August 31, 2014 DATE PAYMENT NUMBER: 3 PREPARED BY: CHECKED BY: Item No. Description of Tasks From Bid Documents Unit Contract Quantity Unit Price Total Actual Quant' Total Amount Previous Payment Present Payment 1 Rock L.S. 1 $200000 $2,000.00 1.00000 2,000.00 $2,000.00 $0.00 2 Planters L.S. 1 $11000.00 $11000.00 1.00000 $11000.00 $6,600.00 $4,400.00 3 Concrete L.S. 1 $21800.00 $21800.00 1.00000 $21800.00 $21,800.00 $0.00 4 Topsoil lawn L.S. 1 $24,960.00 $24,960.00 1.00000 $24,960.00 $24,960.00 $0.00 5 ADA L.S. 1 $2,500.00 $2,500.00 11,00DO01 $2,500.00 $2,500.00 $0.00 6 Paint/benches/hoops L.S. 1 $43,000.00 $43,000.00 1.00000 $43,000.00 $40,850.00 $2,150.00 7 Curb L.S. 1 $1,458.00 $1,458.00 1.00000 $1458.00 $1458.00 $0.00 8 Bollard L.S. 1 $1,200.00 $1,200.00 1.00000 $1,200.00 $1,200.00 $0.00 9 TESC L.S. 1 $8,000.00 $8,000.00 1.00000 $8,000.00 $8,000.00 $0.00 10 Blackline L.S. 1 $45,200.00 $45,200.00 1.00000 $45,200.00 $45,200.00 $0.00 11 IlLandscape Edging L.S. 1 $500.00 $500.00 1.00000 $500.00 $0.00 $500.00 12 As halt L.S. 1 $5,000.00 $5,000.00 1.00000 $5,000.00 $5,000.00 $0.00 13 Mobe L.S. 1 1 $12,000.00 $12,000.00 1.00000 $12,000.00 $12,000.00 $0.00 14 Planters EA 33 $400.00 $13,200.00 1.00000 $13,200.00 $13,200.00 $0.00 15 Landscape L.S. 1 $43,000.00 $43,000.00 1.00000 $43,000.00 $43,000.00 $0.00 16 Sod L.S. 1 $4,060.00i $4,060.00 1.00000 $4,060.00 $4,060.00 $0.00 17 Force Account L.S. 1 $5,000,001 $5,000.02 1.00000 $5,000.00 $0.00 $5,000.00 Ori inal Contract Total 1 $243,878.001 List C ha. e Orders Below. 1 1 Form & Pour Bases For Picnic Tables L.S. 9;::::: $2,285.01 $2,285.01 1.00000 $2,285.01 $2,285.01 $0.00 2 Repair of Steps L.S. 1 $2,025.75 $2,025.75 1.00000 $2,025.75 $2,025.75 $0.00 3 Additional ADA Parking. Stall L.S. 1 $390.00 $390.00 1.00000 $390.00 $390.00 0.00 4 Steel Edging - Not roved L.S. 1 $0.00 $0.00 0.00000 $0.00 $0.00 $0.00 5 Add Color To The Circle L.S. 1 $5,407.50 $5,407.50 1.00000 $5,407.50 $0.00 $5,407-50 6 Time and Materials L.S. 1 2,300.50 $2,300.50 1.00000 $2,300.50 $0.00 $2,300.50 $0.00 $0.00 $0.00 Force Account Adjustment 000.00 $0.00 $5,000.00 Credit For Sales Tax Charged on $175.75 $0.00 $175.75 Change Order #2 $0.00 $0.00 $0.00 $0.00 $0.00 SUB -TOTAL $231111.01 $236,528.76 $14,582.25 APPLICABLE SALES TAX $0.00 $0.00 $0.00 TOTAL $251,111.01 $236,528.76 $14,582.25 RETAINAGE 5% $12,555.55 $11,826A4 $728.11 AMOUNT LESS RETAINAGE $238,555A6 $13,853.14 WASHINGTON SALES TAX 9.5% $23,855.55 $22,470.23 1 $11,3115.311 AMOUNT PAID WITH THIS APPLICATION / $262,411.01 1 $247172.55 515,238A5 COMMENTS: ``��,et \�} •j., "//, -0;0 S on ••. 0 1r i .�•r i O� i Notary Public C.. O b.* 4S v� /� 47 ••....o.. �% Concrete - Excavation & Utilities - Framing Bill To The City of Federal Way 33325 8th Avenue South Federal Way, WA 98003 Henderson Partners, LLC HENDEPL922MQ 11302 Burnham Drive NW Gig Harbor, WA 98332 Ship To Interim Town square Park Date Invoice # 8/18/2014 EI315 -AUG P.O. No. Terms Project E1315 - Interim Town Square P... Quantity Description Rate Amount August Progress Billing - See Attached Schedule of 14,582.25 14,582.25T Values Retention -5.00% - 729.11 0 1 hereby acknowledge that the merchandise and/or services have been received as stated on this invoice. As the authorized approver of purchase order # , I app ve this mvoic paymen . so r 1 Dge:� Ia-- ture Subtotal $13,853.14 Sales Tax (9.5 %) $1,385.31 Phone # Fax # Total $15,238.45 253- 851 -5896 253- 851 -1485 Payments/Credits $0.00 Balance Due $15,238.45 HENDERSON PARTNERS, LLC 11302 BURNHAM DR NW GIG HARBOR WA 98332 253.851.5895 OFFICE 253.851.5826 FAX Contractor Number HENDEPL992MO EXTRA WORK AND /OR CHANGE ORDER FORM DATE: May 20 2014 JOB #: _Federal Way parks JOB NAME: _Federal Way park EXTRA WORK AND /OR CHANGE ORDER TO BE PERFORMED: CO#1 _Picnic table bases REASON FOR EXTRA WORK AND /OR CHANGE ORDER: REQUEST OF OWNER OR GENERAL CONTRACTOR: YES X REQUEST OF INSPECTOR: YES REQUEST OF ENGINEER: YES CHANGE OF CONDITIONS: YES JOB DESCRIPTION MATERIAL Concrete Form and pour concrete bases for picnic 2285.00 tables, includes excavation Authorized Project Representative Date Henderson Partners Representative Date The signatures on this document represent authorization of work performed outside the contracted scope. By signing this document both parties agree the work performed Is compensable. No added verbiage will change the validity of this document. HENDERSON PARTNERS, LLC 11302 BURNHAM DR NW GIG HARBOR WA 98332 253.851.5895 OFFICE 253.851.5826 FAX DATE: 6119114 JOB #: JOB NAME: FEDWAY PARK Contractor Number HENDEPL992MQ EXTRA WORK ORDER EXTRA WORK PERFORMED: Add color to a circle outside the planned circles around the Christmas tree. The square footage is 4326 and cost per square foot is 1.25 the color will be streetbond150 royal blue Price 16 $5407.50 REASON FOR EXTRA WORK: Fill circle with royal blue streetbond 150 REQUEST OF OWNER OR GENERAL CONTRACTOR: YES x REQUEST OF INSPECTOR: YES REQUEST OF ENGINEER: YES CHANGE OF CONDITIONS: YES PERSONEL JOB DESCRIPTION HOURS 4 Fill circle with royal blue streetbond 150 8 MATERIALS VENDOR MATERIALS VENDOR Authorized Project Representative Date Henderson Partners Representative Date The signatures on this document represent authorization of work performed outside the contracted scope. Sy signing this document both parries agree the work performed Is compenssble. No added verbiage will change the validity of this document. X 01 CL ro a U o ni A S Ol O 00 m 0 a ro m O st rn D p m C m 2 F v 4 A c 0 od o o� c = c 09 o o LA m O Z m 0 ~ m m O ao 3 ts X a z O G7 m �- m 0 m � m ro_ �[ reo 77M m a -a O 171 f0 7 A V7 =r a d @ W 01 O1 a O O tai O m 0 0 0 0 0 V► V► N N N N N O~0 O f (A L" Ut U1 0 00 O S O C o (.n W W A Gi 0) 1-+ 1-A N N A A O S 000 `NO ON1 5h N V O ONO W O N O V Ur7 Ln (A N N 001 S N S x ,.SON PARTNERS, LLC J2 BURNHAM DR NW 6IG HARBOR WA 98332 ;X0 253.851.5895 OFFICE 253.851.5826 FAX Contractor Number HENDEPL992MO EXTRA WORK AND /OR CHANGE ORDER FORM DATE: June 16, 2014 JOB #: RFB 14109 JOB NAME: Federal Way Interim Town Square Park EXTRA WORK AND /OR CHANGE ORDER TO BE PERFORMED: CO# 3 Additional ADA Parking Stall REASON FOR EXTRA WORK AND /OR CHANGE ORDER: REQUEST OF OWNER OR GENERAL CONTRACTOR: YES _X_ REQUEST OF INSPECTOR: YES REQUEST OF ENGINEER: YES CHANGE OF CONDITIONS: YES 1014 nESCRIPTION MATERIAL ADA Parking Stall Qty (1) ADA Sign & Post, Painted ADA Stencil W /Blue Background 390.00 Lump Sum $390.00 Authorized Project Representative Date ()10)- Henderson Partners Representative Date The signatures on this document represent authorization of work performed outside the contracted scope. By signing this document both parties agree the work performed is compensable. No added verbiage will change the validity of this document. jW PARTNERS, LLC ,ANHAM DR NW .BOR WA 98332 .,1.5895 OFFICE j51.5826 FAX Contractor Number HENDEPL992MQ EXTRA WORK AND /OR CHANGE ORDER FORM DATE: June 12, 2014 JOB #: RFB 14-109 JOB NAME: Federal Way Interim Town Square Park EXTRA WORK AND /OR CHANGE ORDER TO BE PERFORMED: CO# 2 Repair of steps and landing area at the south end of the property. Includes removing /repairing metal railing REASON FOR EXTRA WORK AND /OR CHANGE ORDER: REQUEST OF OWNER OR GENERAL CONTRACTOR: YES X REQUEST OF INSPECTOR: YES REQUEST OF ENGINEER: YES CHANGE OF CONDITIONS: YES JOB DESCRIPTION MATERIAL Concrete Steps Repair /Replace Top Two Steps, Landing Area Metal Railing Sum 18. Authorized Project Representative Date Henderson Partners Representative Date The signatures on this document represent authorization of work performed outside the contracted scope. By signing this document both parties agree the work performed is compensable. No added verbiage will change the validity of this document. RETURN TO: {/�/� � � EXT: C` ITY OF FEDERAL WAY LAW DEPARTMENT t(OUTING FORM 1. ORIGINATING DEPT/DIV: PRCS / lP y=m l 0 C� 2. ORIGINATING STAFF PERSON: �.1.5Z�,���U EXT: l 3. DATE REQ. BY: 2 Ll 4. TYPE OF DOCUMENT (CHECK ONE): kof CONTRACTOR SELECTION DOCUMENT (E.G., RFB, RFP, RFQ) PUBLIC WORKS CONTRACT �- ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT ❑ PROFESSIONAL SERVICE AGREEMENT ❑ MAINTENANCE AGREEMENT ❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/ CDBG ❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT (E.G. BOND RELATED DOCUMENTS) ❑ ORDINANCE ❑ RESOLUTION • CONTRACT AMENDMENT (AG #): ❑ INTERLOCAL • OTHER 5. PROJECT 6. NAME OF CONTRACTOR: y, �Q ,l' L L—C ADDRESS: J 3b 2 T�1. ,f ✓� vin �r 'N �.3 C-� �. I iL / -IO��' `i w 3 3 A E -MAIL: SIGNATURE NAME' FAX: X53 TITLE: 7. EXHIBITS AND ATTACHMENTS: SCOPE, WORK OR SERVICES C(COMPENSATION >7 INSURANCE REQUIREMENTS /CERTIFICATE ❑ ALL OTHER REFERENCED EXHIBITS PROOF OF AUTHORITY TO SIGN � REQUIRE//D LICENSES El PRIOR CONTRACT /AMENDMENTS CFW LICENSE #24')002—) 0'-Ut BL, EXP. 12/31/,q UBI # 4O oZ 3 3H 137-L-1 8. TERM: COMMENCEMENT DATE: U�u N S��Y�c �/ R' COMPLETION DATE: 1IAril I I q 9. TOTAL COMPENSATION: $ a y 3 J $ 7 `t f Z�I I `l -W - 2 L -lt U L/ � . y I (INCLUDE EXPENSES AND SALES TAX, IF ANY) (IF CALCULATED ON HOURLY LABOR CHARGE - ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES) REIMBURSABLE EXPENSE: ❑ YES ❑ NO IF YES, MAXIMUM DOLLAR AMOUNT: $ IS SALES TAX OWED: ❑ YES ❑ NO IF YES, PAID BY' ❑ CONTRACTOR ❑ CITY ❑ PURCHASING: PLEASE CHARGE TO: � �� 3 V S- 1 �D" logo 10. DOCUMENT/ CONTRACT REVIEW INITIAL / DATE REVIEWED INITIAL / DATE APPROVED Cl PROJECT MANAGER ❑ SUPERVISOR ❑ DIRECTOR ❑ RISK MANAGEMENT (IF APPLICABLE) } ii LAW DEPT 3• 11. COUNCIL APPROVAL (IF APPLICABLE) COMMITTEE APPROVAL DATE: 12. CONTRACT SIGNATURE ROUTING ❑ SENT TO VENDOR/CONTRACTOR DATE SENT: / h , h L. ❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE, LICENSES, EXHIBITS LAW DEPT SIGNATORY (MAYOR OR DIRECTOR) CITY CLERK 1 ASSIGNED AG # SIGNED COPY RETURNED VETURN ONE ORIGINAL ENTS: \\ 1 �^ G y /Zz INITIAL / DATE SIGNED •2 AG# 1 DATE SENT: G•.Z2' COUNCIL APPROVAL DATE: DATEREC'D: 5/1 L 1/9 SMALL PUBLIC WORKS CONTRACT FOR INTERIM TOWN SQUARE PARK CONSTRUCTION //�{ This small public works contract ( "Contract ") is dated effective this lot *� day of Mo-V 20A and is made by and between the City of Federal Way, a Washington municipal corporation ( "City" or "Owner "), and Henderson Partners, LLC, a Washington Limited Liability Company ( "Contractor "). A. The City desires to retain an independent contractor to furnish all labor and materials necessary to perform work at the interim Town Square Park, 31600 20'h Avenue, Federal Way, Washington ( "Property "); and B. The Contractor has the requisite skill and necessary experience to perform such work. NOW, THEREFORE, the Parties ( "Parties ") agree to the following terms and conditions: 1. SERVICES BY CONTRACTOR 1.1 Description of Work. Contractor shall perform all work and furnish all tools, materials, supplies, equipment, labor and other items incidental thereto necessary for the construction and completion of the work, more particularly described as the Interim Town Square Park project, in Exhibit "A" attached hereto and incorporated by this reference, ( "Work "), and in accordance with and as described in the Contract Documents, which include without limitation, this Contract, Contract Change Order Agreement attached as Exhibit "B ", Contractor's Retainage Agreement attached as Exhibit "C ", Contractor's Retainage Bond attached as Exhibit "D ", Notice to Labor Unions attached as Exhibit "E ", Certificate(s) of Insurance Form attached hereto as Exhibit "F ", Performance/Payment Bond attached hereto as Exhibit "G ", Prevailing Wage Rates attached as Exhibit "H ", Title VI Assurances attached hereto as Exhibit I, and all other Appendices attached hereto and incorporated by this reference, (collectively the "Contract Documents "), which Work shall be completed to the City's satisfaction, within the time period prescribed by the City and pursuant to the direction of the Mayor or his or her designee. 1.2 Completion Date. The Work shall be commenced within five (5) days of receipt by the Contractor of the City's Notice to Proceed. The Work shall be completed on or before the 3rd day of July, 2014. In the event the Work is not completed within the time specified, Contractor agrees to pay to the City liquidated damages in the amount set forth in the formula included in Section 1.3 of this Contract. The Work shall not be deemed completed until the City has accepted the Work. 1.3 Liquidated Damages. Time is of the essence of the Contract. Delays inconvenience the public and cost taxpayers undue sums of money, adding time needed for administration, inspection, and supervision. It is impractical for the City to calculate the actual Rev 12/08 - 1 - cost of delays. Accordingly, the Contractor agrees to pay liquidated damages calculated on the following formula for its failure to complete this Contract on time: (1) To pay (according to the following formula) liquidated damages for each working day beyond the number of working days established for completion, and (2) To authorize the City to deduct these liquidated damages from any money due or coming due to the Contractor. LIQUIDATED DAMAGES FORMULA LD = 0.15C T where: LD = Liquidated damages per working day (rounded to the nearest dollar). C = Original Contract amount. T = Original time for completion. When the Work is completed to the extent that the City has full and unrestricted use and benefit of the facilities, both from an operational and safety standpoint, the City may determine the Work is complete. Liquidated damages will not be assessed for any days for which an extension of time is granted. No deduction or payment of liquidated damages will, in any degree, release the Contractor from further obligations and liabilities to complete this entire Contract. 1.4 Performance Standard. Contractor shall perform the Work in a manner consistent with accepted practices for other properly licensed contractors, performed to the City's satisfaction, within the time period prescribed by the City. 1.5 Compliance with Laws. Contractor shall perform the Work in accordance with all applicable federal, state and City laws, including but not limited to all City ordinances, resolutions, standards or policies, as now existing or hereafter adopted or amended, and obtain all necessary permits and pay all permit, inspection or other fees, at its sole cost and expense. 1.6 Change Orders. The City may, at any time, without notice to sureties, order changes within the scope of the Work. Contractor agrees to fully perform any such alterations or additions to the Work. All such change orders shall be in the form of the Contract Change Order Agreement attached hereto as Exhibit "B ", which shall be signed by both the Contractor and the City, shall specifically state the change of the Work, the completion date for such changed Work, and any increase or decrease in the compensation to be paid to Contractor as a result of such change in the Work. Oral change orders shall not be binding upon the City unless confirmed in writing by the City. If any change hereunder causes an increase or decrease in the Contractor's cost of, or time required for, the performance or any part of the Work under this Contract, an equitable adjustment will be made and the Contract modified in writing accordingly. If the Contractor intends to assert a claim for an equitable adjustment hereunder, it shall, within five (5) days after receipt of a written change order from the City or after giving the City Rev 12/08 - 2 - the written notice required above, as the case may be, submit to the City a written statement setting forth the general nature and monetary extent of such claim; provided the City, in its sole discretion, may extend such five (5) day submittal period upon request by the Contractor. The Contractor shall supply such supporting documents and analysis for the claims as the City may require to determine if the claims and costs have merit. No claim will be allowed for any costs incurred more than five (5) days before the Contractor gives written notice as required. No claim by the Contractor for an equitable adjustment hereunder will be allowed if asserted after final payment under this Contract. 1.7 Work and Materials Omitted. The Contractor shall, when directed in writing by the City, omit work, services and materials to be furnished under the Contract and the value of the omitted work and materials will be deducted from the Total Compensation and the delivery schedule will be reviewed if appropriate. The value of the omitted work, services and materials will be a lump sum or unit price, as mutually agreed upon in writing by the Contractor and the City. If the parties cannot agree on an appropriate deduction, the City reserves the right to issue a unilateral change order adjusting the price and the delivery schedule. 1.8 Utility Location. Contractor is responsible for locating any underground utilities affected by the Work and is deemed to be an excavator for purposes of Chapter 19.122 RCW, as amended. Contractor shall be responsible for compliance with Chapter 19.122 RCW, including utilization of the "one call" locator system before commencing any excavation activities. 1.9 Air Environment. Contractor shall fully cover any and all loads of loose construction materials including without limitation, sand, dirt, gravel, asphalt, excavated materials, construction debris, etc., to protect said materials from air exposure and to minimize emission of airborne particles to the ambient air environment within the City of Federal Way. 2. TERM This Contract shall commence on the effective date of this Contract and continue until the completion of the Work, which shall be no later than the 3rd day of July 2014, and the expiration of all warranties contained in the Contract Documents ( "Term "). K�ii��:� ►�►7���� rid 3.1 Requisite Skill. The Contractor warrants that it has the requisite skill to complete the Work, and is appropriately accredited and licensed by all applicable agencies and governmental entities, including but not limited to being registered to do business in the City of Federal Way by obtaining a City of Federal Way business registration. Contractor represents that it has visited the site and is familiar with all of the plans and specifications in connection with the completion of the Work. 3.2 Defective Work. The Contractor shall, at its sole cost and expense, correct all Work which the City deems to have defects in workmanship and material discovered within one (1) year after the City's final acceptance of the Work. Rev 12/08 - 3 - 4. COMPENSATION 4.1 Total Compensation. In consideration of the Contractor performing the Work, the City agrees to pay the Contractor a fixed fee equal to Two Hundred Forty Three Thousand Eight Hundred Seventy Eight and No /100 Dollars ($243,878.00), and Washington State sales tax equal to Twenty Three Thousand One Hundred Sixty Eight and 41/100 Dollars ($23,168.41), for a total amount not to exceed Two Hundred Sixty Seven Thousand Forty Six and 41/100 Dollars ($267,046.41), which amount shall constitute full and complete payment by the City. 4.2 Contractor Responsible for Taxes. Except as otherwise provided in Section 4.1 hereof, the Contractor shall be solely responsible for the payment of any taxes imposed by any lawful jurisdiction as a result of the performance and payment of this Contract. 4.3 Nonpayment. The City shall have the right to withhold payment to the Contractor for any of the Work not completed in a satisfactory manner, in the City's sole discretion, which shall be withheld until such time as Contractor modifies or repairs the Work so that the Work is acceptable to the City. 4.4 Method of Payment. Payment by the City for the Work will only be made after the Work has been completed, a voucher or invoice is submitted in the form specified by the City, and such invoice is approved by the appropriate City representative. Payment shall be made within thirty (30) days of receipt of such invoice or voucher unless otherwise set forth in the Bid Form. The Contractor's acceptance of such payment for the Work shall constitute full compensation for the performance of the Work. Invoices shall be submitted, in duplicate to: City of Federal Way ATTN: Accounts Payable 33325 8h Avenue South Federal Way, WA 98003 -6325 Duplicate invoices shall be furnished to: City of Federal Way ATTN: Steve Ikerd Public Works Department 33325 8h Avenue South Federal Way, WA 98003 -6325 4.5 Retainage. Pursuant to Chapter 60.28 RCW, five percent (5 %) of the Total Compensation shall be retained by the City to assure payment of Contractor's state taxes as well as payment of subcontractors, suppliers and laborers. Upon execution of this Contract, Contractor shall complete, execute and deliver to the City the Contractor's Retainage Agreement attached hereto as Exhibit "C" or execute the Retainage Bond attached hereto as Exhibit "D." No payments shall be made by the City from the retained percentage fund ( "Fund ") nor shall the City release any retained percentage escrow account to any person, until the City has received from the Department of Revenue a certificate that all taxes, increases, and penalties due from the Rev 12/08 - 4 - from the Department of Revenue a certificate that all taxes, increases, and penalties due from the Contractor and all taxes due and to become due with respect to the Contract have been paid in full or that they are, in the Department's opinion, readily collectible without recourse to the State's lien on the retained percentage. Upon non - payment by the general contractor, any supplier or subcontractor may file a lien against the retainage funds, pursuant to Chapter 60.28 RCW. Subcontractors or suppliers are required to give notice of any lien within forty -five (45) days of the completion of the Work and in the manner provided in RCW 39.08.030. Within sixty (60) days after completion of all Work on this Contract, the City shall release and pay in full the money held in the Fund, unless the City becomes aware of outstanding claims made against this Fund. 5. EQUAL OPPORTUNITY EMPLOYER In all Contractor services, programs or activities, and all Contractor hiring and employment made possible by or resulting from this Contract, there shall be no discrimination by Contractor or by Contractor's employees, agents, subcontractors or representatives against any person because of sex, age (except minimum age and retirement provisions), race, color, creed, national origin, marital status or the presence of any disability, including sensory, mental or physical handicaps, unless based upon a bona fide occupational qualification in relationship to hiring and employment. This requirement shall apply, but not be limited to the following: employment, advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. Contractor shall comply with and shall not violate any of the terms of Chapter 49.60 RCW, Title VI of the Civil Rights Act of 1964, the Americans With Disabilities Act, Section 504 of the Rehabilitation Act of 1973, 49 CFR Part 21, 21.5 and 26, or any other applicable federal, state, or local law or regulation regarding non- discrimination. Contractor shall post a notice to Labor Unions or other employment organizations, attached hereto as Exhibit "E ", as required by Section 202 of Executive Order 11246. Any material violation of this provision shall be grounds for termination of this Contract by the City and, in the case of the Contractor's breach, may result in ineligibility for further City agreements. If this project involves federal funds including USDOT funds administered by WSDOT, the contractor agrees to the clauses contained in Exhibit I. 6. INDEPENDENT CONTRACTOR/CONFLICT OF INTEREST 6.1 It is the intention and understanding of the Parties that the Contractor shall be an independent contractor and that the City shall be neither liable nor obligated to pay Contractor sick leave, vacation pay or any other benefit of employment, nor to pay any social security or other tax which may arise as an incident of employment. The Contractor shall pay all income and other taxes due. Industrial or any other insurance that is purchased for the benefit of the City, regardless of whether such may provide a secondary or incidental benefit to the Contractor, shall not be deemed to convert this Agreement to an employment contract. It is recognized that Contractor may or will be performing professional services during the Term for other parties; provided, however, that such performance of other services shall not conflict with or interfere with Contractor's ability to perform the Services. Contractor agrees to resolve any such conflicts of interest in favor of the City. Rev 12/08 - 5 - 6.2 If the Contractor is a sole proprietorship or if this is a contract with an individual, the contractor agrees to notify the City and complete any required form if the Contractor retired under a State of Washington retirement system and agrees to indemnify any losses the City may sustain through the Contractor's failure to do so. 7. TERMINATION Prior to the expiration of the Term, this Contract may be terminated immediately, with or without cause by the City. 8. INDEMNIFICATION 8.1 Contractor Indemnification. The Contractor agrees to indemnify, defend and hold the City, its elected officials, officers, employees, agents, and volunteers harmless from any and all claims, demands, losses, actions and liabilities (including costs and all attorney fees) to or by any and all persons or entities, including, without limitation, their respective agents, licensees, or representatives, arising from, resulting from, or connected with this Contract to the extent caused by the negligent acts, errors or omissions of the Contractor, its partners, shareholders, agents, employees, or by the Contractor's breach of this Contract. Contractor waives any immunity that may be granted to it under the Washington State Industrial Insurance Act, Title 51 RCW. Contractor's indemnification shall not be limited in any way by any limitation on the amount of damages, compensation or benefits payable to or by any third party under workers' compensation acts, disability benefit acts or any other benefits acts or programs. 8.2 City Indemnification. The City agrees to indemnify, defend and hold the Contractor, its officers, directors, shareholders, partners, employees, and agents harmless from any and all claims, demands, losses, actions and liabilities (including costs and attorney fees) to or by any and all persons or entities, including without limitation, their respective agents, licensees, or representatives, arising from, resulting from or connected with this Contract to the extent solely caused by the negligent acts, errors, or omissions of the City, its employees or agents. 8.3 Survival. The provisions of this Section shall survive the expiration or termination of this Contract with respect to any event occurring prior to such expiration or termination. 9. INSURANCE 9.1 Minimum Limits. The Contractor agrees to carry as a minimum, the following insurance, in such forms and with such carriers who have a rating, which is satisfactory to the City: (1) Workers' compensation and employer's liability insurance in amounts sufficient pursuant to the laws of the State of Washington; Rev 12/08 - 6 - (2) Commercial general liability insurance with combined single limits of liability not less than $2,000,000 for bodily injury, including personal injury or death, products liability and property damage. (3) Automobile liability insurance with combined single limits of liability not less than $2,000,000 for bodily injury, including personal injury or death and property damage. (4) If any structures are involved in the Contract, the Contractor shall maintain an "All Risk Builder's Risk 2 form at all times in an amount no less than the value of the structure until final acceptance of the project by the City. 9.2 Endorsements. Each insurance policy shall contain, or be endorsed to contain, the following provisions: (1) The City, its officers, officials, employees, volunteers and agents shall each be named as additional insured. (2) Coverage may not be terminated or reduced in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, to the City. (3) Coverage shall be primary insurance as respects the City, its officials, employees and volunteers. Any insurance or self - insurance maintained by the City, its officials, employees or volunteers shall be in excess of Contractor's insurance. (4) Coverage shall apply to each insured separately against whom claim is made or suit is brought. (5) Coverage shall be written on an "occurrence" form as opposed to a "claims made" or "claims paid" form. 9.3 Verification. Contractor shall furnish the City with certificates of insurance evidencing the coverage required by this Section, in compliance with the Certificate(s) of Insurance Form attached hereto as Exhibit "F", which certificate must be executed by a person authorized by the insurer to bind coverage on its behalf. The City reserves the right to require complete certified copies of all required insurance policies, at any time. 9.4 Subcontractors. Contractors shall include all subcontractors as additional insured under its policies or shall furnish separate certificates for each subcontractor. All coverage for subcontractors shall be subject to all of the requirements stated herein. 9.5 Deductibles and Self Insured Retentions. Any deductibles or self - insured retentions must be disclosed by Contractor and approved in writing by the City. At the option of the City, Contractor shall either reduce or eliminate such deductibles or self - insured retentions or procure a bond guaranteeing payment for any amounts not covered by the insurance by reason of such deductibles or self - insured retentions. Rev 12/08 - 7 - 9.6 Asbestos Abatement or Hazardous Materials. If asbestos abatement or hazardous materials work is performed, Contractor shall review coverage with the City's Risk Manager and provide scope and limits of coverage that are appropriate for the scope of Work and are satisfactory to the City. Contractor shall not commence any Work until its coverage has been approved by the Risk Manager. 9.7 Termination. The Contractor's failure to provide the insurance coverage required by this Section shall be deemed to constitute non - acceptance of this Contract by the Contractor and the City may then award this Contract to the next lower bidder. The provisions of this Section shall survive the expiration or termination of this Contract with respect to any event occurring prior to such expiration or termination. 10. PERFORMANCE/PAYMENT BOND Pursuant to RCW 39.08.010, Contractor shall post a Performance/Payment Bond in favor of the City, in the form attached to this Contract as Exhibit "G" and incorporated by this reference, in a dollar amount satisfactory to the City; to guarantee Contractor's performance of the Work to the City's satisfaction; to insure Contractor's performance of all of the provisions of this Contract; and to guarantee Contractor's payment of all laborers, mechanics, subcontractors and material persons. Contractor's obligations under this Contract shall not be limited to the dollar amount of the bond. Alternatively, pursuant to RCW 39.08.010, at the option of Contractor, if the value of this Contract as less than Thirty -Five Thousand Dollars ($35,000.00), the City may, in lieu of a bond, retain fifty percent (50 %) of the Contract amount for a period of thirty (30) days after the date of final acceptance, or until receipt of all necessary releases from the Department of Revenue and the Department of Labor and Industries and settlement of any liens filed under Chapter 60.28 RCW, whichever is later. 11. SAFETY Contractor shall take all necessary precautions for the safety of employees on the work site and shall comply with all applicable provisions of federal, state and municipal safety and health laws and codes, including without limitation, all OSHA/WISHA requirements, Safety and Health Standards for Construction Work (Chapter 296 -155 WAC), General Safety and Health Standards (Chapter 296 -24 WAC), and General Occupational Health Standards (Chapter 296 -62 WAC). Contractor shall erect and properly maintain, at all times, all necessary guards, barricades, signals and other safeguards at all unsafe places at or near the Work for the protection of its employees and the public, safe passageways at all road crossings, crosswalks, street intersections, post danger signs warning against known or unusual hazards and do all other things necessary to prevent accident or loss of any kind. Contractor shall protect from damage all water, sewer, gas, steam or other pipes or conduits, and all hydrants and all other property that is likely to become displaced or damaged by the execution of the Work. The Contractor shall, at its own expense, secure and maintain a safe storage place for its materials and equipment and is Rev 12/08 - 8 - City may withhold from the money which may be due the Contractor an amount necessary for the payment of such subcontractors, laborers, materials or insurance premiums. 14. OWNERSHIP OF DOCUMENTS All originals and copies of work product, including plans, sketches, layouts, designs, design specifications, records, files computer disks, magnetic media, all finished or unfinished documents or material which may be produced or modified by Contractor while performing the Work shall become the property of the City and shall be delivered to the City at its request. 15. CONFIDENTIALITY Any records, reports, information, data or other documents or materials given to or prepared or assembled by the Contractor under this Contract will be kept as confidential and shall not be made available to any individual or organization by the Contractor without prior written approval of the City. 16. BOOKS AND RECORDS The Contractor agrees to maintain books, records, and documents which sufficiently and properly reflect all direct and indirect costs related to the performance of this Contract and such accounting procedures and practices as may be deemed necessary by the City to assure proper accounting of all funds paid pursuant to this Contract. These records shall be subject at all reasonable times to inspection, review or audit by the City, its authorized representative, the State Auditor, or other governmental officials authorized by law to monitor this Contract. 17. CLEAN UP At any time ordered by the City and immediately after completion of the Work, the Contractor, shall, at its own expense, clean up and remove all refuse and unused materials of any kind resulting from the Work. In the event the Contractor fails to perform the necessary clean up, the City may, but in no event is it obligated to, perform the necessary clean up and the costs thereof shall be immediately paid by the Contractor to the City and/or the City may deduct its costs from any remaining payments due to the Contractor. 18. CONTRACTOR AND SUBCONTRACTOR RESPONSIBILITY: 18.1 Contractor Verification. The Contractor verifies that it has a certificate of registration with the State of Washington; has a current state unified business identifier number; is not disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3); has industrial insurance as required by Title 51 RCW, if applicable; has an employment security department number as required in Title 50 RCW, if applicable; has a state excise tax registration number as required in Title 82 RCW, if applicable; possesses a valid electrical contractor license as required by chapter 19.28 RCW, if applicable; and possesses an elevator contractor license as required by chapter 70.87 RCW, if applicable. Rev 12/08 - 10 - 18.2 Subcontractor Contracts. The Contractor shall include the language of this section in each of its first tier subcontracts, and shall require each of its subcontractors to include the same language of this section in each of their subcontracts, adjusting only as necessary the terms used for the contracting parties. Upon request of the Owner, the Contractor shall promptly provide documentation to the Owner demonstrating that the subcontractor meets the subcontractor responsibility criteria below. The requirements of this section apply to all subcontractors regardless of tier. 18.3 Subcontractor Verification. At the time of subcontract execution, the Contractor shall verify that each of its first tier subcontractors meets the following bidder responsibility criteria: Have a current certificate of registration in compliance with chapter 18.27 RCW, which must have been in effect at the time of subcontract bid submittal; Have a current Washington Unified Business Identifier (UBI) number; Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065 (3); Have Industrial Insurance (workers' compensation) coverage for the subcontractor's employees working in Washington, as required in Title 51 RCW, if applicable; A Washington Employment Security Department number, as required in Title 50 RCW, if applicable; A Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW, if applicable; An electrical contractor license, if required by Chapter 19.28 RCW, if applicable; An elevator contractor license, if required by Chapter 70.87 RCW. 19. GENERAL PROVISIONS 19.1 Entire Contract. The Contract Documents contain all of the agreements of the Parties with respect to any matter covered or mentioned in this Contract and no prior agreements or understandings pertaining to any such matters shall be effective for any purpose. 19.2 Modification. No provisions of this Contract, including this provision, may be amended or added to except by agreement in writing signed by the Parties or their respective successors in interest. 19.3 Full Force and Effect. Any provision of this Contract, which is declared invalid, void or illegal, shall in no way affect, impair, or invalidate any other provision hereof and such other provisions shall remain in full force and effect. 19.4 Assignment. The Contractor shall not transfer or assign, in whole or in part, any or all of its obligations and rights hereunder without the prior written consent of the City. In the event the City consents to any such assignment or transfer, such consent shall in no way release the Contractor from any of its obligations or liabilities under this Contract. 19.5 Successors In Interest. Subject to the preceding Subsection, this Contract shall be binding upon and inure to the benefit of the Parties' successors in interest, heirs and assigns. 19.6 Attorney. In the event the City or the Contractor defaults on the performance of any terms in this Contract, and the Contractor or City places the enforcement of the Contract or any part thereof, or the collection of any monies due, or to become due hereunder, or recovery Rev 12/08 - 11 - of possession of any belongings, in the hands of an attorney, or file suit upon the same, each Party shall pay all its own attorneys' fees, costs and expenses. The venue for any dispute related to this Contract shall be King County, Washington. 19.7 No Waiver. Failure of the City to declare any breach or default immediately upon occurrence thereof, or delay in taking any action in connection with, shall not waive such breach or default. Failure of the City to declare one breach or default does not act as a waiver of the City's right to declare another breach or default. 19.8 Governing Law. This Contract shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington. 19.9 Authority. Each individual executing this Contract on behalf of the City and Contractor represents and warrants that such individuals are duly authorized to execute and deliver this Contract on behalf of the Contractor or City. 19.10 Notices. Any notices required to be given by the City to Contractor or by the Contractor to the City shall be delivered to the Parties at the addresses set forth below. Any notices may be delivered personally to the addressee of the notice or may be deposited in the United States mail, postage prepaid, to the address set forth herein. Any notice so posted in the United States mail shall be deemed received three (3) days after the date of mailing. 19.11 Captions. The respective captions of the Sections of this Contract are inserted for convenience of reference only and shall not be deemed to modify or otherwise affect in any respect any of the provisions of this Contract. 19.12 Performance. Time is of the essence of this Contract and each and all of its provisions in which performance is a factor. Adherence to completion dates is essential to the Contractor's performance of this Contract. 19.13 Compliance with Ethics Code. If a violation of the City's Ethics Resolution No. 91 -54, as amended, occurs as a result of the formation and /or performance of this Contract, this Contract may be rendered null and void, at the City's option. 19.14 Conflictinja Provisions. In the event of a conflict between the terms and provisions of any of the Contract Documents, the Mayor or his or her designee shall issue an interpretation of the controlling document, which interpretation shall be final and binding. DATED the day and year set forth above. Rev 12/08 - 12 - CITY OF FEDERAL WAY WFerrell, Mayor 133258 1" Avenue South Federal Way, WA 98003 -6325 APPROVED AS TO FORM: ATTEST: 0")O"Otv ' Interim ' y Attorney, Amy Jo Pearsall City Clerk, Carol McNeil , CMC Rev 12/08 - 13 - HENDERSON PARTNERS, LLC By: Its: 1 C (Address) (Phone) STATE OF WASHINGTON ) ) ss. COUNTY OF 191e ye& On this day personally appeared before mega r u zh u » Wa / / , to me known to be the Y!7 e rn be r of life r, de ►-4o r Ptt rin eYs, ,L.0 C' that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he /she was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation. GIVEN my hand and official seal this /a day of , 20!-s� y (ty ed/printed name of notuff Notary Public in and for the State of Washington. My commission expires ,111ililf /�/ C I I f to�!iti 4.' a on Exp j;.. do •: ; 0 rko : r _ • \� • o ap ap (>V`0 ' b / s , ;.•• > > ��� :� tic of Rev 12/08 - 14 - EXHIBIT A SCOPE OF WORK Contractor's responsibilities: • The bid drawings are for information use only and the contractor shall be responsible to verify actual measurement for quantities. Contractor to provide all materials, designated fixtures, equipment and labor necessary to construct a City Park per bid set of drawing RFB 14 -109 dated 4/22/14. All work to be performed in compliance with the plans, written specifications shown on the drawings and conform with the City of Federal Way and the Washington State Department of Transportation standard specifications. • Addendum One (1) scope changes: 1. Note 3 under Demolition key notes on sheet C 1. 00, has been completed by others; no need to remove the curbing on the east side of the old building pad. 2. No need to excavate 6" of sub soil in the old building pad area as shown on sheet C1.00 Demolition Legend. The concrete from the building pad has just been removed and through this process the area is at a satisfactory depth to back fill with specified topsoil. Some final grading may be needed prior to placement of topsoil. 3. Add approx. 8 "- 14" of topsoil in the lawn area to achieve the specified 1.5% slope. Contractor to field verify quantity. 4. One of the Note 5 on sheet C 1.00 Demolition key notes, which will have a new ADA ramp will still need the concrete section removed. In addition on sheet C1.01 - Note 9; will need to remove the old broken concrete before patching unless the successful contractor can demonstrate another method to repair. • Current City business license and state prevailing wage rate reporting required. • Performance Bond and Retainage requirements. • This project is time sensitive so the successful contractor must start after work "Notice to Proceed" is issued and work must be completed by July 3, 2014. City Responsibilities: • Contract creation and management • Coordination of any City permit. Rev 12/08 - 15 - VII. SPECIFICATIONS. A. All work shall be performed under the supervision of an experienced lead with City oversight. The contractors lead workers and laborers must communicate effectively and proficiently in both oral and written formats. Staff will be licensed for all applicable applications, including appropriate driver's license when required. B. Contractor will furnish all associated labor, equipment and all the work materials to complete the project. C. Contractor will ensure employees comply with all applicable City of Federal Way and Washington State regulations and practices with respect to work performed for the City of Federal Way. All personnel shall be trained in the proper safety practices using current industry standards. D. The Contractor's personnel will conduct themselves on site in a professional manner at all times. E. The Contract Administrator or appointed designee will inspect work performed by the Contractor on a regular basis. In the event of work performance deficiencies, the Contract Administrator will notify the Contractor. Notification may be verbal or written. F. Report any damage, or potential hazard, involving City property immediately to the City of Federal Way Parks Department, (253) 835 -6901. After hours emergencies should be reported to the Police/Fire Communications Center - 911. G. Hazardous conditions shall be immediately remedied or secured to prevent further damage and/or protect public from injury. H. Incidents, altercations, or accident involving the public shall be reported to the Contract Administrator within 24 hours. The Contract Administrator, at his or her discretion, may require a written report from the Contractor describing the incident or accident. I. The Contractor, at his or her expense, will remedy any damage to City structures or plant material due to Contractor negligence in a timely manner. Rev 12/08 - 16 - PROJECT NUMBER PROJECT TITLE EXHIBIT B CONTRACT CHANGE ORDER AGREEMENT CHANGE ORDER NUMBER SUMMARY OF PROPOSED CHANGES: EFFECTIVE DATE CONTRACTOR The time provided for completion in the Contract is ❑ Unchanged ❑ Increased ❑ Decreased by Calendar Days. This Document shall become an Amendment to the Contract and all provisions of the Contract not amended herein will apply to this Change Order. Will this change affect expiration or extent of Insurance coverage? ❑ Yes ❑ No If "Yes" Will the Policies Be Extended? ❑ Yes ❑ No PRICE CHANGE LUMP SUM: INCREASE $ DECREASE $ UNIT PRICE: THE ITEMS ARE APPROXIMATE OR ESTIMATED QUANTITIES INVOLVED IN THIS CHANGE ITEM NO. ITEM QTY. UNIT PRICE ADD OR DELETE TOTAL NET CONTRACT: INCREASE $ DECREASE $ STATEMENT: Payment for the above work will be in accordance with applicable portions of the standard specifications, and with the understanding that all materials, workmanship and measurements shall be in accordance with the provisions of the standard specifications, the contract plans, and the special provisions governing the types of construction. CONTRACTOR'S SIGNATURE MAYOR SIGNATURE Rev 12/08 - 17 - DATE DEPARTMENT RECAP TO DATE: ORIGINAL CONTRACT AMOUNT PREVIOUS CHANGE ORDERS THIS CHANGE ORDER *ADJUSTMENTS NEW CONTRACT AMOUNT ADJUSTMENTS CHANGE ORDER ESTIMATE IS HEREBY *Adjustments: ❑ INCREASED ❑ DECREASED PAY THIS ADJUSTED AMOUNT: MAYOR'S SIGNATURE Rev 12/08 - 18 - EXHIBIT C CONTRACTOR'S RETAINAGE AGREEMENT City of Federal Way Bid /Contract Number 33325 8th Avenue South Federal Way, WA 98003 -6325 253 - 835 -7000 IDENTIFICATION AND DESCRIPTION Project Title Interim Town Square Park ContractorH &nderson Partners LLC Representative Nick Wall Bid No. Date Administering Department City Representative Funding Source Project Authori ty RETAINAGE FORMULA In accordance with applicable State Statutes, the following provisions will be made for the disposition of the retainage held for investment: 1. All investments selected below are subject to City approval. 2. Retainage under this agreement will be held in escrow by the (referred to herein as the Bank), the terms of which are specified by separate escrow agreement. The cost of the investment program and the risk thereof is to be borne entirely by the contractor. 3. The final disposition of the contract retainage will be made in accordance with applicable statutes. CONTRACTOR'S INSTRUCTIONS Pursuant to RCW 60.28.0101 hereby notify the City of Federal Way of my instructions ❑ to invest (Snot to invest the retainage withheld under the terms of this contract. If the investment option is selected, please provide the following information: Name of Bank, Mutual. Fund, or Savings & Loan Association: Address: Account #: Contractor By: Address: Fed ID #: CITY APPROVAL Approval of Investment Program and Retainage Agreement CERTIFICATION FOR RELEASE OF CONTRACT RETAINAGE ContractNo.RFB 14 -109 Project Title: Interim Town Square Park Contact Person: Date: Title: Phone: Est. Completion Date: _ Finance Director Date I hereby certify, as Contract Administrator for this Contract representing the City of Federal Way, that all work required by the above cited contract was completed on and final acceptance by the City was granted on Rev 12/08 - 19 - I also certify that no liens have been received within 30 days from the above date from any person, persons; mechanics, subcontractors or materialman who has performed any work or provided any material of subject contract. Contract Administrator Director of Administering Department Also, please find attached certifications by the applicable state agencies of the receipt o£ 1) Washington State Business Taxes (Washington State Dept. of Revenue); 2) Industrial Insurance Premiums (State Dept. of Labor & Industries); and 3) Employment Security, Unemployment Insurance Premiums (State of Washington Employment Security Dept.) Rev 12/08 - 20 - EXHIBIT D Bond No. 1001008104 RETAINAGE BOND TO CITY OF FEDERAL WAY INTERIM TOWN SQUARE PARK CONSTRUCTION KNOW ALL PERSONS BY THESE PRESENTS that we, the undersigned, Henderson Partners, LLC , as principal ( "Principal "), and American Contractors Indemnity Company, a Corporation organized and existing under the laws of the State of California , as a surety Corporation, and qualified under the laws of the State of Washington to become surety upon bonds of Contractors with Municipal Corporations, as surety ( "Surety'), are jointly and severally held and firmly bonded to the City of Federal Way ( "City ") in the penal sum of: Twenty Six Thousand even Hundred Four & 64/100 ($ 26,704.64 } for the payment of which sum we bind ourselves and our successors, heirs, administrators or personal representatives, as the case may be. A. This obligation is entered into in pursuant to the statutes of the State of Washington and the ordinances, regulations, standards and policies of the City, as now existing or hereafter amended or adopted. B. Pursuant to proper authorization, the Mayor is authorized to enter into a certain contract with the Principal, providing for the interim Town Square Park Construction Project, which contract is incorporated herein by this reference ( "Contract"), and (RFB 14 -109) C. Pursuant to State law. Chapter 60.28 RCW, the City is required to reserve from the monies earned by the Principal pursuant to the contract, a sum not to exceed five percent (5%), said sum to be retained by the City as a trust fund for the protection and payment of any person or persons, mechanic, subcontractor or materialmen who shall perform any labor upon such contract or the doing of such work. and all persons who shall supply such person or persons or subcontractors with provisions and supplies for the carrying on of such work, and the State with the respect to taxes imposed pursuant to Title 82 RCW which may be due from said Principal. Every person performing labor or furnishing supplies towards completion of said improvement or work shall have a lien on said monies so reserved, provided that such notice of the lien of such claimant shall be given in the manner and within the time provided in RCW 39.08.030 as now existing and in accordance with any amendments that may hereafter be provided thereto; and D. State law further provides that with the consent of the City, the Principal may submit a bond for all or any portion of the amount of funds retained by the public body in a form acceptable to the public body conditioned upon such bond any proceeds therefrom being made subject to all claims and liens and in the same manner and priority as set forth retained percentages pursuant to Chapter 60.28 RCW; and E. The Principal has accepted, or is about to accept, the Contract, and undertake to perform the work therein provided for in the manner and within the time set forth, for the amount of $ 267,046.41 ;and F. The City is prepared to release any required retainage money previously paid by the Principal prior to acceptance and successful operation and fulfillment of all other terms of said contract upon being indemnified by these presents. NOW, THEREFORE, if the Principal shall perform all the provisions of the Contract in the manner and within the time period prescribed by the City, or within such extensions of time as may be granted under the Contract, and shall pay all laborers, mechanics, subcontractors and material men or women, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work, and if the Principal shall pay to the State all taxes imposed pursuant to Title 82 RCW which may be due from such Principal as a result of this contract then and in the event this obligation shall be void; but otherwise it shall be and remain in full force and effect. And the Surety, for value received, hereby further stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond. and it does hereby waive notice of any change, extension of time. alterations or additions to the terms of the Contract or to the Work. The Surety hereby agrees that modifications and changes may be made in the terms and provisions of the Contract without notice to Surety, and any such modifications or changes increasing the total amount to be paid the Principal shall automatically increase the obligation of the Surety on this Retainage Bond in a like amount, such increase, however, not to exceed twenty -five percent (25 %) of the original amount of this bond without consent of the Surety. Within forty -five (45) days of receiving notice that the Principal has defaulted on all or part of the terms of the Contract, the Surety shall make written commitment to the City that it will either: (a) cure the default itself within a reasonable time period. or (b) tender to the City, the amount necessary for the City to remedy the default, including legal fees incurred by the City, or (c) in the event that Surety's evaluation of the dispute is not complete or in the event the Surety disputes the City's claim of default. the Surety shall notify the City of its finding and its intent. if any, to interplead. The Surety shall then fulfill its obligations under this bond, according to the option it has elected. Should Surety elect option (a) to cure the default, the penal sum of the Bond shall be reduced in an amount equal to the costs actually incurred by the Surety in curing the default, if the Surety elects option (b), then upon completion of the necessary work, the City shall notify the Surety of its actual costs. The City shall return, without interest, any overpayment made by the Surety and the Surety shall pay to the City any actual costs which exceed the City estimate, limited to the bond amount. Should the Surety elect option (c), the Parties shall first complete participation in mediation, described in the below paragraph, prior to any interplead action. In the event a dispute should arise between the Parties to this Bond with respect to the City's declaration of default by the Principal, the Parties agree to participate in at least four hours of mediation in accordance with the mediation procedures of United States Arbitration and Mediation ( "USA &M "). The Parties shall proportionately share in the cost of the mediation. The mediation shall be administered by the Seattle USA &M office, 4300 Two Union Square, 601 Union Street, Seattle, Washington 98101 -2327. The Surety shall not interplead prior to completion of the mediation. The parties have executed this instrument under their separate seals this 19M day of May 20 i4, the name and corporate seal of each corporate party hereto affixed, and these presents duly signed by its undersigned representatives pursuant to authority of its governing body. CORPORATESEAL: CORPORATE SEAL: PRINCIPAL Henderson P e LLC��'� By: Tit t9s3Z- SURETY American Contractors Ind It emnity, o p ny By: At rney -in -Pact Julie Craker (Attach Power of Attorney) Title: Attomey -in -Fad Address: 621 Pacific Ave. Suite 400 Tacoma, WA 98402 CERTIFICATES AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within bond; that ornafhayi V✓d - //, who signed the said bond on behalf of the Principal, was �fe7.e.6ev of said CorporM" jj #t know his or her signature thereto is genuine, and that said bond was duly signed, sealed, and attes`�ojgndLin l p ,said Corporation by authority of its governing body. fl° Jp.•' gslon F'•• O� r Notary - • U fic Secretary of A istant S ,retary Of n% fact I hereby certify that I W4161".0. See —tarp of the Corporation named as Surety in the within bond; that Julie Craker , who signed the said bond on behalf of the Surety, was Attorney -in -Fact — of the said Corporation; that I know his or her signature thereto is genuine, and that said bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. IN 4NOTARy PUBIC APPROVED AS TO FORM: ''�.,,,w�������`,,, 6#W 1444;9a Amy do PeaOlf Interim City Attorney Seere*11y6 € Notary POWER OF ATTORNEY AMERICAN CONTRACTORS INDEMNITY COMPANY UNITED STATES SURETY. COMPANY U.S. SPECIALTY INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS: That American Contractors Indemnity Company, a California corporation, United States Surety Company, a Maryland corporation and U.S. Specialty Insurance Company, a Texas corporation (collectively, the "Companies "), do by these presents make, constitute and appoint: Thomas P. Hentschell, Karen J. Smith, Karen Ingram, Bradley A. Roberts, Joanne Reinkensmeyer or Julie Craker of Tacoma, Washington its true and lawful Attorney(s) -in -fact, each in their separate capacity if more than one is named above, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include riders, amendments, and consents of surety, providing the bond penalty does not exceed * * * ** *Three Million * * * * ** Dollars ($ * *3,000,000.00 ** ). This Power of Attorney shall expire without further action on December 08, 2016. This Power of Attorney is granted under and by authority of the following resolutions adopted by the Boards of Directors of the Companies: Be it Resolved, that the President, any Vice - President, any Assistant Vice - President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s) -in -Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney -in -Fact may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 10th day of December, 2012. AMERICAN CONTRACTORS INDEMNITY COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY Corporate Seals CTOR "',. �� ..........s,`• g SUR ,. Daniel P. Aguilar, Vice President State of California County of Los Angeles SS: On 10th day of December, 2012, before me, Vanessa Wright, a notary public, personally appeared Daniel P. Aguilar, Vice President of American Contractors Indemnity Company, United States Surety Company and U.S. Specialty Insurance Company who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. =M98146 r..+rr• NT 19"31a Signature " " (Seal) CatlioraisCaunty 4ea B, 2Qt6� 1, Jeannie Lee, Assistant Secretary of American Contractors Indemnity Company, United States Surety Company and U.S. Specialty Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. P� In Witness Whereof, I have hereun o set my hand and affixed the seals of said Companies at Los Angeles, California this day of ; Corporate Seals `O�.P4.C7pgs Bond No. jc f rU jb Agency No. 8306 ° t tES' RFry -, N n eua' n% Jeannie Lee, ZSsistant Secretary TO: EXHIBIT E NOTICE TO LABOR UNIONS OR OTHER EMPLOYMENT ORGANIZATIONS NONDISCRIMINATION IN EMPLOYMENT (Name of Union or Organization) The undersigned currently holds contract(s) with involving funds or credit of the City of Federal Way, Washington, or (a) subcontract(s) with a prime contractor holding such contract(s). You are advised that, under the provisions of the above contract(s) or subcontract(s) and in accordance with Section 202 of Executive Order 11246 dated September 24, 1965, the undersigned is obliged not to discriminate against any employee or applicant of employment because of race, color, creed or national origin. This obligation not to discriminate in employment includes, but is not limited to, the following: EMPLOYMENT, UPGRADING, TRANSFER OR DEMOTION RECRUITMENT AND ADVERTISING RATES OF PAY OR OTHER FORMS OF COMPENSATION SELECTION FOR TRAINING INCLUDING APPRENTICESHIP, LAYOFF OR TERMINATION This notice is furnished to you pursuant to the provisions of the above contract(s) or subcontractor(s) and Executive Order 11246. Copies of this Notice will be posted by the undersigned in conspicuous places available to employees or applicants for employment. Complaints may be submitted to: City of Federal Way 33325 8th Avenue South Federal Way, WA 98003 (Contractor or subcontractor) Date AG�°, -R °® CERTIFICATE OF LIABILITY INSURANCE 5/9/20'"�`"�"' THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, ©(TEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the pollcy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the teens and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in Hsu of such endorsement(s). PRODUCER HENTSCHELL & ASSOC ANC One Pacific Building 621 Pacific Ave., Suite 400 Tacoma NA 98402 Danielle Pethick E (253)272 -1151 (258) 272 -1225 E4AL .daniellepLhentsahell.cma INSU s AFFORDING COVERAGE NAIC0 INSUREIRACompanion Specialty Ins. Co. LaNTS FISURED Henderson Partners, LLC 11302 Burnham, ham Dr NK IG!g Harbor WA 98332 I a:General Ins. Cc of America GENERAL uAmLrIY Rwamc :Travelera P & C Co of America INSURER 0: INSURERS: EACH OCCURRENCE F: PREMISES Mes=nmwm COVERAGES CERTIFICATE NUM13ER:CL1351005931 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. NOR TTR TYPE OF NSURAIICE AVUL SUM POLICY EFF EXP LaNTS GENERAL uAmLrIY EACH OCCURRENCE S 1,000,000 PREMISES Mes=nmwm $ 30,000 X COMMERCIAL GENERAL LIABILITY A I CLAIMS -AMIDE ❑X OCCUR X Y VMa332197 /14/2013 /14/2014 ME.D MW arm S 51000 PERSONA1.aADVINJURY $ 1,000,000 GFlrERALAGGREGATE $ 2,000,000 GENrL AGGREGATE LIMIT APPLIES PER: PRODUCTS - CONPIOP AGG 5 2,000,000 S POLICY EX-1 P LOC AUTOMDS"LIABIITY COMBINED 11M LIMIT 1,000,000 BODILY WIURY(Perpwvm) S B I ANYAUTO L HULED AL AUEDHIREDAUTOS MED N X Y 6-C- 082936 -1 /14/2013 /14/2014 BODILYINJURY(PraaddeM S UndwkmzW mak rist S Phe DM below UMBRELLA LIAS X OCCUR EACH OCCURRENCE S 5,000,000 X AGGREGATE 5,000,000 A MWM LIAB CLAJM84MDE 1342295 5/14/2013 5/14/2014 D Nn N S X Y VYO COMPENSATION 1NC ATU X OTH- ER A AND EMPLOYERS LIABILITY ANY PROPRIEfORIPARTNEWEXEC ITIVE -- OFFICERIMEMBER EXCLUDED? tMyywddM In NN) DESCRIPTION OF OPERATIONS below N /A 332197 kility) Stop Gap - Lr w1cria1/14/2013 /14j2013 /14/2014 E.L EACH ACCIDENT i 1 000 000 E.L. DISEASE -EA $ 3_000,000 E.L. DISEASE - POLICY LIMIT S 1,000,000 C Scheduled Equipment 6602806HO65TIL13 /14/2014 s below Leased /Rented Equipment 20000 Lim1 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (AMSch ACORD 101, AddIdonsl Renwks Schedule, 9 more specs Is required) Project: Town Square Park (31600 20th Avenue, rederal fray, VIA) Blanket primary non- contributory additional insured including additional insured including completed operations additional insured, Blanket Waiver of subrogation applies in favor any person or organisation as per written contract per policy forms CG 2026 07/04, CSIC VXK 02509 09/07 , CG2037 07/04, CG2404 10/93, CG2503 03/97 I SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 11 THE EXPIRATION DATE THEREOF, NOTICE HALL BE DELIVERED IN City of Federal Way ACCORDANCE WITH THE POLICY PROVISIONS. P.O. Bo: 9718 33325 8th Ave South AUTHORIZED REPRESENTAIM Federal Way, WA 98063 -9718 ACORD 25 Roberts /DRP 01966 -2010 ACORO CORPORATION. All INS025 (zmiooncn The ACORD name and logo are registered marks of ACORD COMMENTS/REMARKS The City, its officers, officials, employees, volunteers and agents are included as additional insureds I OFREMARK COPYRIGHT 2000, ANS SERVICES INC. POLICY INIUMBER: �11L I. LIAlBgl1'Y Ofi �>M 0704 THIS E DOMEMENT CHANGES THE ICY. PLEASE READ IT CARMLLY. ADDITIONAL INSURED -DESIGNATED PERSON OR ORGANIZATION rnb endorswerrf rand bm itranrwm pr+aMw urx wft "jm ft COMMERCUH. GIRMI Ai. LMI.ITY COVERAGE PART 11"Goa 0 — Who k An MSUmd k amended In h- dude sa err addltlMI kMad the pwwn(s) or arperN- =#Dn(t) ahgwn In the Sdrsduk, but only wllh rvspag to lablilly Ibr "bodlY k*W, "P zPerty demsW or W=W end advsrMV kW caused, In woofs or In PIK by Your Oct* or on*mk a or the ac% or omis- sions of lime aatbrp on your bMW. A. In the perfanmm of your ongoing operatlanw or IL In coamodan with your premises owned by or two d tD you. CG 20 20r 07 04 0 160 PrOParthm, ft. 2004 Pape 4 of 1 0 COMPANION SPECIALTY INSURANCE COMPANY THIS ENDORSEMENT CHANGES THE POLICY— PLEASE READ iT CAREFULLY CSIC VEN ox 00 00 07 PRI11iARY AND NON4CONTRit3UTTW INSURANCE (Third Party* Sole Negllgeeos} This endorsemerrt modff%s insurance provided under the bilowing: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTSICOMPLETED OPERATIONS LIABILITY COVERAGE PART The Mowing is added to Section IV — Commemial General LlabW Condoorrs, Paragraph 4: Section IV: Comm miai General Liability Condltione 4, Other Insurance: d. Ncxwithstsrrdin9 the provisions of KkImMraphs a, b, and c of this paragraph 4, with respeet to the Thud Party shown below, it is understood and agreed that In the event of a dalrn or "suit" arising out of the Named Insured's sob negligence, this insurance shalt be primary and any other Insurance maintained by the additional Insured named 'as the Third Party below shag be Mwess and non- ccntrbubry, The Third Party to whom this endorsement applies Is: Absence of a specifically named Third Party above means that the provisions of this endoraement apply 'as required by written cordrec tual agree nierd with any Third party for whom you are performing work.' All other t+errrra, WrKftns aad exclusions under this poky are applicable to this Endon neM and remain unchanged. CMc VEN am W W 07 PEP 4 COI CIRI.OWERAL UABKM 0020370704 TWS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERSj LESSEES OR CONTRACTORS - COMPLETED OPERATIONS r* enclarssrnsnt modlem Ir mmme ptosldad under So tbto,eln0; U IV! =s Ssoftn It — Who 1s M bm&m d Is emended b Include as an additW homed the pemon(s) or apenkati n(a) shwmn In the Sdneduls, but only wtlh moped lo I&bWq br'boM h*rr or Wqp KJ► &ml- sW caused, IN lfleation d slg whole wW and desatod In go adw duce of this endorsement. pert mned for that sddl- donol insured and tno>uded in the "products - CO 20 37 07 04 ' 0 ISO Propertied lr m, 2004 Page t of 1 D OOAllN1E 1. SE48 At. LiABRM 0024941010 THM ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US TMs endarsement mcffm tattrranos provided un W Ilve tbloOW troMMERE tAL GM11RAL LIAall W tio'VERAOE PART SCHEDULE ftw of Parson or Orseelwlona As per wMm sorchact (If no entry appears above. krtomsdM requked to w nwisfa ft endoramsnt va be shawm in ft Cella rawa se: @XGmble to this endoreernsnt) The TRANSFER OF RMTS OF RISDOVERY AG41NFi'OTHERS To US Cond&n (ftcon IV — MAWER- VAL GENERAL LtA LITY COMMONS) b anended by Ire pdam of ft blawft We waive any right of rs MM ws may h" against the person or oWbatm shown in the Schedule, above bec am of paymwft we make for hjury or damps adit an of year covok operations or Iyaw wall' dorrs under n coontraot With that person or oagan etion and inaludad Ingo hazard': This wm%W eppies only to tha person or orlon shown in the Schedule above. CG 24 04 10 93 Cowvht Insurance Sava "mm. Inc., 1992 Pspo 1 of 1 a POLICY NUMBER: COMIMNERMAL GENERM. LIABILITY 136211430311117 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY, DESIGNATED CONSTRUCTION PROJECT(S) GENERAL AGGREGATE LIMIT 'fits endorsarnefit modiiies frs,un nm provided under ft Nowfng: COMMERCIAL GENERAL LiABIL11W COVERAGE PAftr Designated Consbuction Projaatr Any and ail projects Of no entry appears abomk won required b co as appkable to 06 ando ) A. For #0 sums which the InrjW becomes leg* obligated to pay as damages caused by `occur - tences` under OQVERAQ[ E A (SECTION , and for all medical expenses caused by amts under COVERAGE C (SECTION 1), which can be sttributed only b ongoing openadons at a sirgle dedonated omiruetion prajaat shown to to Scheduis above: !. A separate Designated Construction Project General Aggregate Limit appitaa to each des- ignated construction projaq, and that Mmit is equal to the amount of the General Aggregate Limit shown in the Dedarefons z. The Designated Construawn Pr+oled Ganeral Aggregate Limit Is the most we will! pay for the sum of all daaneges under COVERAGE A, mccept darnWas becatisa of 'b m ft tnjuryP or 'property damage' Included in the 'products- compleW options hazard`. and for me& cos expenses under COVERAGE C regard- less of the number of a. insureds; i2. Claims made or `suW brought or c. Persons or arganbmthns maldiig claims or brfn9Ing su>W. S. Any payments made under COVERAGE A fur damages or under COVERAGE C for medical wMenses shah reduce the DesigneW' Con - OW desrgnP aid c�nft%mdore�pmjact. Such payments shell not reduce the Generai Ag' gregate Limit shown in the Declarations nor shag they reduce any other Designated Con - si udfon Project General Aggm9ste Limit for any oBher designeted aonahuctbn prOJect shown In the Schedule above. 4. The limb Shown In the Declarefto for Es h Oauirenca, Fire Damage and I In 11r, i Br- g , of s*ec to Aggregate tir* shown in the Declarations, suo h Irons wB to sun act to the appMoeble Designated Con - struodon Prafect Gan" Agprepata Limit. B. For all surns which the insured becomes IepaAy obligated b pay as damages caused by 'ocour- rerme under COVERAGE A PECTION Ij, end for all medical expenses cawed by acddenis under COVERAGE C (SECTION n, which cannot be edAxAed only to ongoing operations at a sin - gin designated consti c5on pnod shown In #a Schedule above t. Any payments made under COVERAGE A for damages or under COVERAGE C for mufti wcparmes Germs die amount available Aggregate Lint or the Products- completed ttpeWons 1A09regab Limit, whichever Is appticade; and 2. Such payments shall not reduce any Desig- noi Cortution Project. General Aggre- C. When coverage 1br lability, arising out of v ee "productwcomplebed operaWns hazard" is pro - vided, any payments for damages because of lxxft the In)urY0 ex 'per o hazard• will reduce the ProcIUM- Completed OperaWns Ag- gregate Limit, end not reduce the General Aggre- gate Limit norms Cons Projec'�i General CG 2s o3 03 or Copyright, Insurance Services Of os, Inc.. 1998 Page ! of 2 O D. It to appiasbb designated oDrah otlon PMjaat E The pravisbns of Umb Of inanranoe (SWnON baa been abandoned, d@Wpd, or a bmioneed NO rM oftrwlse modHted by ft ends mment and then restarted, or N the sullorked oonbract steep oorillnue b apply as sduehxL ik p devkft ftm pa M Mueptint% de- vM be downed b be Vm swo omebta m p Page 2 of 2 Copyright, Insurance Services Ofte, Inc , 1 996 CO 25 03 03 P O — aa+RWWrROM THE ARCHIM nssoreaKu nwasncnc M MY naAM AOorrarw, rMe -- COMMERCIAL AUTO CA 7110 03 07 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. AUTO PLUS ENDORSEMENT This endorsement modifies Insurance provided under the 1b1cwlrg: With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. EXiENDW CANCELLATION CONDITION Paragraph 2b. of the CANCELLATION Common Policy Condition is replaced by the kdowing: b. 80 days before the effective data of cancelistion I we cwnoel for any other reason. Is Under paragraph C. — CERTAIN TRAILERS, MO- BiLE EQUIPMENT AND TEMPORARY SUBSTITUTE AUTOS of SECTION 1 — COVERED AUTOS, the following Is added: if Physical Damage c overogs is provided by this Cov- erage Form, then you have coverage for Any 'duW you do not awn while used with the per- mission of Its owner as a temporary substitute for a covered 'auto" you own that is out of service be- cause d Its breakdown, repair, servicing, "loss' or desAruction. BROAD FORM NAMED INSURED SECTION N — LIABILITY COVERAGE — A.I. WHO IS AN INSURED provision is amended by the addition of to following: d. Any business entity newly acquired or formed by you during the policy period provided you own 50% or more of the business entity and the buslneas entity is not separately Insured for Business Auto Coverage. Coverage Is extended up to a matclmum of 180 days following aoquiel- Von or fame don of the business entity. Coverage under this provision Is afforded only until the end of the policy period. BLANKET ADDITIONAL INSURED SECTION N — LIABLITY COVERAGE — A.I. WHO 13 AN INSURED provision Is amended by the addition of the fallowing: a. Any person or organbatison far wtiom you are re- quired by an "lneured oontract' to provide hrsur- anm is an "lnaured', subject to ft following additional provisions: (1) The 'Inured contract- must be in etfact during the policy period shown In the Decla` rations, and must have been executed prior to the 'bodily injury' or wproperty dsmsW. (2) This person or organizedon Is an 'Insured• only to the extent you are liable due tc your ongoing operation for that Insured, whether the work Is performed by you or for you, and only to ft modem you are held ilaabie for an 'accident■ occurring while a covered "tuba' is being driven by you or one of your am- ployn& (3) There Is no coverage provided to this person or organization for -bodily Iryury' loo 10 em- ployer, nor for 'property damage■ to Its property. (4) shall be ilrritedf b the extent of your negl gene or fault according to the appikxble principles of comparative negligence or buk (Ii) The defense d by this this ppe� or °r "sultorgarballon as soon as pracdcable to an other insurers which potentially provide Insurance for such claim or 'eult■. Includes copyrighted material of Insurance Services Oft e, inc., with its perrnlesion. Copyright, Insurance Services Oftlos, Inc., 19ti7 CA 71 10 03 07 Flips f do EP — REPRWEIMMUTHEAMWA. THE ON12K TPAN&WTIONMAYRXIMMADOMONAL FORM — (0) The coverage provided well not exceed the PERSONAL EFFECTS COVERAGE lesser of: (Al Ttrs coverage arxl/or ikrrib of #6 A. SECTION ill — PHYSICAL DAMAGE COVER - AGE, AA. COVERAGE EXTENSIONS, is or amended by adding the following: (b) The Coverage and/or limits required by c. Personal Effsctr Covenape the insured oontract'. M A person's or organic doves status as an For any Owned moo" that Is involved In a 'Insured* under Me subparagraph d ends covered '1008', we WE pay up to M for 'personal ff eects" that we lost or damaged when your operations for brat "!neared" are as a result of the covered 'foss', without applying a deductible. EMPLOYEE AS INSURED Under Paragraph A. of Section u — LIABILITY GOV. ERAGE item f. in added as follows: Your `employee" while using his owned "auto ', or an 'auto' owned by a member of his or her household. In your business or your personal affairs, provided you do not own, hire or borrow that %uto'. This coverage Is excess to any other collectible Insurance coverage. FELLOW EMPLOYEE COVERAGE Exclusion & FELLOW EMPLOYEE of SECTION S — LIABiLiTY COVERAGE — B. EXCLUSIONS is amended by the addition of the foilowing: However, this exclusion does not apply ti the "bodily lr&W results from the use of a covered %uto" You awn or hire, and provided that any coverage under this provision only applies In excess over any other colledlbie insurance. BLANKET WAIVER OF SUBROGATION We Waive the right of recovery we may have for pat menu made for " bodiy injury" or •property damage" on behalf of the persons or organized" added as Insureds" under Section if — L.IABLITY COVERAGE — A.I.D. BROAD FORM NAMED INSURED and A.I.s. BLANKET ADDITIONAL INSURED. PHYSICAL DAMAGE — ADDITIONAL TRANS- PORTATiON EXPENSE COVERAGE The first sentence of paragraph AA. of SECTION ifl — PHYSICAL DAMAGE COVERAGE is amended as follows: We Will pay up to $50 per day to a maximum of 161,500 for temporary transportation expense Incurred by You because of the total then of a cohered 'auto" of the private passenger type. EXTRA EXPENSE — BROADENED COVERAGE Paragraph A. -- COVERAGE of SECTION 01 — PHYSICAL DAMAGE COVERAGE Is amended Jo add: L We will pay for the expense d returning a stolen covered lawto" to you. AIRBAG COVEAAOE Under paragraph B. — EXCLUSIONS of SECTION at — PHYSICAL DAMAGE COVERAGE, the fdlowing Is added: The exclusion relating to msdw* al breakdowns does not apply to the accidental discharge of an wftg. NEW VEHICLE REPLACEMENT COST Under Paragraph C — LIMIT OF INSURANCE of Section Ili — PHYSICAL DAMAGE COVERAGE @so- lion 2 is amended as follows: 2. An adJuslmant for depredation and physical corn dition will be made in determining actual cash value In the event of a total loos. However, In to event of a total loss to your 'new vehicle" to which this coverage applies, as shown in the declarations, we Will pay at your option: e. The varlflable "new vehicle* purchase price you paid for your damaged vehicle, not In- cluding any insurance or warrardles pur- chased; POP 2 d 8 b. The purchase price, as negotiated by us, of a new vehicle of the same make, model and equipment, not indudng any fumMhings, parts or equipment not Installed by the r wwfacturer or manufacbrrees dealership. ti the same model is not available pay the purchase price of the most similar model available; ""- REPRBRED FROM THEARCHM THE O) WAiLTRAMACT )ONMAYtNCWDEAMMONALFOW8 — c. The market value of your damaged Vehicle, not h olucling any hunishings, parts or equip rnent not truster by the manufacturer or manufacturer's dealership. This coverage applies only to a covered •auto" of the private passenger, light mutt or medium MO type (20,000 the or leas gross vehicle weight) and does not apply to initiation or set up costs associated with loans or teases. TWO OR MORE DEDUCTIIBLES Under SECTION Ili — PHYSICAL DAMAGE CDV ERAGE, If two or more 'oompanry' policies or cover- age forms apply to the same acddernt, the following apples to paragraph D. Deductible: o. If the applicabb Business Auto deduct Ibis is the smaller (or smallest) deduct - bye it will be waived; or b. if the applicable Business Auto deduct 11* Is not the smaller (or smeMe4 de- d xVWe it will be reduced by the amount of the smaller (or arnidiest) deductible; or c. It the loss 'Involves two or more Busl- rwe Auto coverage forme or pollaea the emeDer (or smallest) deductible will be waived. For the purpose of this endarawnent lcompany' means: a. Seteco Insurance Company of America b. American States Insurance Company c. General Insurance Company of America d. American Economy Insurance Company e. First National insurance Company of America t American States Insurance Company of Texas g. American States Preferred Insurance Company K Safeco Insurance Company of Ilinots i.OANILEASE GAP COVERAGE Under paragraph C — LIMIT OF INSURANCE of SECTION M — PHYSICAL DAMAGE COVERAGE, the following Is added: 4. The most we will pay for a total "loss' In any one %cddent' Is the greater of the following, subject to a $1,500 mardmum timlt: CA 71 V 0 07 Pig a. Actual cash value of the damaged or stolen property as of the time of the loss•, lase an acluMnent for depreclation and physical condition; or b. Balance due under the terns; of the loan or lease that the damaged covered 'sub' is sul> d to at the firms of the fteew, lass any one or all of the following adjusbrants: (1) Overdue payment and financial penalties associated with those payments as of the date of the wi0eaw. (2) Financial penalties Imposed under a lease due to high mileage, excesr slue use or abnormal wear and tear. (3) Costs for extended warranties, Cre- dit L fe insurance, Health, Accident or Disability Insurance purchased with the loan or lease. (4) Transfer or rollover balances from previous loans or leases. (S) Final payment due under a 'galloon Loan'. (6) The dollar amount of any un- repaired dery age that occurred prior to the 4loai loss• of a cowed wa1Jt0'. (t) Security deposits not refunded by a (8) All refunds payable or paid to you as a result of the early Vanination of a lease agreement or any war- ranty or extended service agree- ment an a covered 'auto'. (0) Any amount representing texas. (10) Loan or Isaac termination fees GLASS REPAIR — WAIVER OF DEDUCTIBLE Under paragraph D. — DEDUCTIBLE of SEUMN III — PHYSICAL DAMAGE COVERAGE, the following is added: No deductible apples to glass damage H the glass Is repaired rather than replaced. AMENDED DUTIES iN THE EVENT OF ACCI- DENT, CLAIM, SUIT OR I= The requirement In LOSS CONDITION 2.a. — DUTIES IN THE EVENT OF ACCIDENT, CLAIM, SUiT OR LOSS — of SECTION N — BUSINESS AUTO CONDITIONS that you must notify us of an 13015 EP RAPRKMOFROMTMARCH ," ORIOIWALTRANVAC NONMAYRACLUMADCITMALFORMN 'accident' applies orgy when the %c oldent" Is known deductible and excess pmvislons, - we will provide to: coverage equal to the broadest coverage applicable you own. (1) You, ti you are an individual; to any covered mnub' (2) A partner, if you are a partnership; or (S) An executive offer or insurance manager, it you are a corpomalon. UMNTENTIONAL FAILURE TO DOCLOSE HAZARDS SECTION IV — BUSINEW AUTO CONDnXM — 8. 2. Is amended by the addition of the following: If you urintertionrally fail to disclose any hazards ex. lsting at the k1XVIon date of your policy, we will not deny coverage under this Coverage Form because of such falu►e. However, this provision does not Stied our right to ooW additional premium or exerdes our right of cancellation or non - renewal. HIRED AUTO — LIMBED WORLD WIDE COVER- AGE Under Section W — Business Cordons, Paragraph B.T.b.e(1) is replaced by the following: (1) The %ociclsnt' or 'loss• results km the use of an 'dub" hlnad for 3D days or leas. RESULTANT MENTAL ANGUISH COVERAGE SECTION V — DEFINnXM — C. is replaced by the bNowing: 'Body injury' means bodily frrjury, sickness or dis- ease sustained by a person including mental anguish or death resultinng from ary of these. HIRED AUTO PHYSICAL DAMAGE COVERAGE If hired %Ube" are covered lautos' for Liability am-- erage and if Comprehenaive, Specified Causes of Loss or Collision Coverrages we provided under this Coverage Form for any 'auto• you own, then the Physical Damage Coverages provided are extended to 'autos" you hire or borrow. The most we will pay for loss to any hired %utD' is $50,000 or Actual Cash Value or Cost of Pop&, whichever Is smallest, minus a deductible. The de- ductible will be equal to the largest deductbea appii• Cable tD any owned "auto" of the private passenger or light truck type for that coverage. Hired Atria Phy- sical Damage coverage Is excess over any other col- lectible Insurance. Subject to the above Ii L HIRED AUTO PHYSICAL DAMAGE COVERAGE I OF USE SECTION M — PHYSICAL DAMAGE AAb. Form does not apply. Subs to a msodmurn of $1,000 per accldern, we will cover ions of use of a hired curb' If I resulis from an accident, you are legally liable and the lessor In- curs an actual flnendel lose. RENTAL REINOLMSEMENT COVERAGE A. We will pay br rental reimbursement ex wwn Incurred by you for the rental of an 'Sub' be- Car rse of a covered 'loss' to a covered Taub'. Payment applies In addition to time otherwise W plicable amount of each coverage you have on a covered 'auto'. No deductibles apply b this coverage. 8. We will pay only for those eopenses krourred during the policy period beginning 24 hours after the 'loss" and ending, regardless of the policy's expiration, with the lesser of the fdbwhg number of days: 1. The number of days reasonably required !D repair or replace the covered sauto'. If loss' Is caused by theft, this number of days Is added to the number of days it takes to loosts the covered 'auto' and return it to you. 2. 3D days. C. our payment Is bnKW ID the lesser of the fed- lowing amounts: 1. Necessary and actual mpansea inured. 2. $50 per day. D. This oovewage does not apply white two are spare or reserve 'auto®' avaNebleto you for your aperdone- E. It loss' ruts from the total theft of a covered ' auto" of the private passenger type, we will pay under this ooverage only that amount of your rental reimbursement expenses which Is not al- ready provided for under lire PHYSICAL DAM- AGE COVERAGE Coverage Extension. F. The Rental Reimbursement Cove"e described above does not apply to a cove 'auto' that is described or designaW as a covered 'auto" on Pape 4 of 6 — RE.PRKTOFFM THEARCME THE ORDINAL MWAACTIONMAY ffW" EADDriX UL FORW " Rental ReimbureerneM Coverage Form the manufacturer for the Installation of a CA 99 23. radio. AUDIO, VISUAL AND DATA ELECTRONIC EQUIPMENT COVERAGE A. Coverage 1. We will pay with respect to a covered •auto" for loss• to mW 9WAronic equipmant that receives or transmits auidio, visual or dais signals and that is not designed solely for the reproduction of sound. This coverage applies only tl die sgclpment Is permanently Installed In the oovered •auto" at the time of the lose" or the egcripment 1s removable from a housing unit which Is permanerttiy installed in the covered •auto° at the time of the Moss ", and such equipment Is designed to be solely operated by use of the power from the "auhn' electrical system, in or upon the covered %uto ". 2. We will pay with respect to a covered "auto" for 'toss" to any accessories used with the eledmtiC equipment described in paeagraph A.I. above. However, this does not Include tapes, records or diets. 3. N Audio, Visual and Data Electronic Equip- ment Coverage form CA 99 60 or CA 99 94 Is attached to this policy, then the Audio, Vi- sual and Data Electronic Equipment Cover- age described above does riot apply. S. Excluelons The exclusions that apply to PHYSICAL DAM- AGE COVERAGE, except for the wdWon resat trig to Audi, Visual and Data Electronic EquipreM, also apply to this coverage. In addi- tion, the following exclusions apply: We will not pay for either any electronic equip- ment or accessories used with such electronic equipment that is: 1. Necessary for the normal operation of the covered leafs' for the monitoring of the covered UWs" operating system; or 2. Both: C. Limit of Insurance With respect to this coverage. the WHIT OF IN- SURANCE provision of PHYSICAL DAMAGE COVERAGE is replaced by the idkw tg: 1. The most we wig pay for •loss to audio, vl- sual or data ekm*wlc equipment and any accessories used with this equipment as a result of any one %ocidwtt• Is the lesser oh a. The actual cash value of the darnaged or stolen property as of the time of the 'loss'• or b. The cod of repairing or replacing the damaged or stolen property with cam property or like idrtd and quality. m $1,000. 2. An adjustment for depreciation and ptryciCel condition will be made in deburnining actual Cash value at the time of the loss". 3. 1 a repair or replacement results In better than Igoe Idnd or quality, we will not pay 11or the amount of the betterment. D. Deductlble 1. M loss" to the acdlo, visual or data els - trortlo equipment or accessories used with this equipment Is the result of a foss" to the covered 'le" under the Business Auto Coverage Forma Comprehensive or Cogl- etai Coverage. than for each covered 'sub' our obligation to pay for, rspalr, return or re- piece damaged or stolen properly will be re- duced by the applicable deductible shown in the Declaratiarta Any Comprehensive Cov- erage deductible shown In the Dedarsdorts does not apply to foss' to audio, v1suet or dale electronic equipment caused by fire or lightning. L a. an integral part of the same unit housing any sound reproducing equipment de- afgrred solely for the reproduction of sound If the sound reproducing 3. equipment is pemha vu* installed in the covered 'auto"; and b. permanently ktstalled In the opening of the dash or console nomtelly used by If loss" to the audio, visual or data oleo• trvr>ic equipment or accessories used with this aqulprttent Is the result of a'loss' to the covered %uto" under the Business Auto Coverage Form's SpecBied Causes of Loss Coverage, then for each covered "sumo' our obligation to pay for, repair, return or replace damaged or eblen property will be reduced by a $100 deductible. If loss- occurs solely to the audio, visual or data electronic equipment or accessories used with this equipment, then for each Cov- ered auto- our obligation to pay for, repair, CA 71 10 03 07 typo I d I Ep - REPR NMFROM 7WARCHNE THE ORGKU TAWBA07gNMAY MCl MAMT 0 4AL FORMS - return or replace damaged or stolen property SECTION V — DEFINI'T'IONS is emended by adding will be reduced by a $100 deductible. the following: 4. In the event that there Is more than one ap- Q. 4 rsonal effects" means your t u*b plicable deductible, only the highest deduct- property that is wom or carried by you, ex- ible will apply. In no sweat will more than one wept for tools, jewelry, money, or securities. deductible apply. R. Now vehicle' means any woub" d which you are the original owner and the `auto' has not been proviousty titled and Is less than 366 days past the purchase data. Pap 6 ds EXHIBIT G Bond No. 1001008103 CITY OF FEDERAL WAY PERFORMANCE /PAYMENT BOND KNOW ALL PEOPLE BY THESE PRESENTS: We, the undersigned Henderson Partners, LLC , ( "Principal ") and American Contractors Indemnity Company the undersigned corporation organized and existing under the laws of the State of California and legally doing business in the State of Washington as a surety ( "Surety"), are held and firmly bonded unto the City of Federal Way, a Washington municipal corporation ( "City") in the penal sum of Two Hundred sixty seven Thousand Forty six & 41/100 Dollars and no /100 ($ 267.046.41 ) for the payment of which we firmly bind ourselves and our legal representatives, heirs, successors and assigns, jointly and severally. This obligation is entered into an Agreement with the City dated May 19th , 20 14 for Interim Town Square Park Construction NOW, THEREFORE, if the Principal shall perform all the provisions of the Agreement in the manner and within the time period prescribed by the City, or within such extensions of time as may be granted under the Agreement, and shall pay all laborers, mechanics, subcontractors and material men or women, and all persons who shall supply the Principal or subcontractors with provisions and supplies for the carrying on of said work, and shall hold the City, their officials, agents, employees and volunteers harmless from any loss or damage occasioned to any person or property by reason of any carelessness or negligence on the part of the Principal, or any subcontractor in the performance of said work, and shall indemnify and hold the City harmless from any damage or expense by reason of failure of performance as specified in the Agreement within a period of one (1) year after its final acceptance thereof by the City, then and in the event this obligation shall be void; but otherwise, it shall be and remain in full force and effect. And the Surety, for value received, hereby further stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any change, extension of time, alterations or additions to the terms of the Agreement or to the Work. The Surety hereby agrees that modifications and changes may be made in terms and provisions of the Agreement without notice to Surety, and any such modifications or changes increasing the total amount to be paid the Principal shall automatically increase the obligation of the Surety on this Performance Bond in a like amount, such increase, however, not to exceed twenty-five percent (25 0/6) of the original amount of this bond without the consent of the Surety. Within forty-five (45) days of receiving notice that the Principal has defaulted on all or part of the terms of the Agreement, the Surety shall make a written commitment to the City that it will either: (a) cure the default itself within a reasonable time period, or (b) tender to the city, the amount necessary for the City to remedy the default, including legal fees incurred by the City, or (c) in the event that Surety's evaluation of the dispute is not complete or in the event the Surety disputes the City's claim of default, the Surety shall notify the City of its finding and its intent, if any, to interplead. The Surety shall then fulfill its obligations under this bond, according to the option it has elected. Should Surety elect option (a) to cure the default, the penal sum of the Bond shall be reduced in an amount equal to the costs actually incurred by the Surety in curing the default. If the Surety elects option (b), then upon completion of the necessary work, the City shall notify the Surety of its actual costs. The City shall return, without interest, any overpayment made by the Surety and the Surety shall pay to the City any actual costs which exceed the City estimate, limited to the bond amount. Should the Surety elect option (c), the Parties shall first complete participation in mediation, described in the below paragraph, prior to any interplead action. In the event a dispute should arise between the Parties to this Bond with respect to the City's declaration of default by the Principal, the Parties agree to participate in at least four hours of mediation in accordance with the mediation procedures of United States Arbitration and Mediation ( "USA &M "). The Parties shall proportionately share in the cost of the mediation. The mediation shall be administered by the Seattle USA &M office, 4300 Two Union Square, 601 Union Street, Seattle, Washington 98101 -2327. The Surety shall not interplead prior to completion of the mediation. DATED this 19thday of May 2014 . CORPORATE SEAL OF PRINCIPAL: PRINCIPAL Henerson Partners, By: /1 1� - — Its: 11302 Burnham Dr. NW (Address) Gig Harbor, WA 98332 253 - 851 -5896 (Phone) CERTIFICATE AS TO CORPORATE SEAL I hereby certify that I am the (Assistant) Secretary of the Corporation named as Principal in the within bond; that Sn'>-2,t ZA& W Wd / , who signed the said bond on behalf of the Principal, was "Owe 'Z-Xbe ✓- of the said Corporation; that I know his or her signature thereto is genuine, and that said bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. CORPORATE SEAL OF SURETY: Secretary of Assistan . ecretary SURETY American Contractors Indem ' Company By: Atto ey -in -Fact (Attach Power of Attorney) Julie Craker (Name of Person Executing Bond) 621 Pacific Ave. Suite 400 (Address) Tacoma, WA 98402 253 - 272 -1151 (Phone) AP OVED AS TO RM: "/ Jd Amy Jo Pe I, Interim City Attorney III _ III � � ILI II II III I II I ILII,VIuIII Llll III POWER OF ATTORNEY AMERICAN CONTRACTORS INDEMNITY COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY i w A. 1 BY THESE PRESS T11 n Contractors Ind p o I14� al ifornia eor�orat», ntre n a Maryland-Apon U�pecialty In o as corporatictivel - bytheseprese �ttappoint: 6 - - - g Thom". I e�chi Karen J. Smith, Kar BrI ley A. Roberts, Joanne Reinkensmeyer or Julie Craker of Tacoma, Washington its #rue and lawful Attorney(s)-in-fact, each in their separate capacity if more than one is named above, with full power and authority Cog its name, plac tI cknowledge and delylud4lUblonds, recognizance undertakings nts or coat le S r i ude riders, a eirdmtrni ns is of surety, d g and s i exceed iree Million* — Dollars -_ 0" - i s�'ower of Attorney hall ex wi ($ y p t further action on December�201b�This Power of Attorney is grated under and by authority of the following resolutions adopted by the Boards of Directors of the Companies: Be it Resolved, that the President, any Vice- President, any Assistant Vice - President, any Secretary or any Assistant Secretary shall be and is hereby vested with fall wer and au y personsas Attomey(s }in-Fact to rep and act f I behalf of the Company subject to the follown po thonty.to appoint an one or more suitable resent acts, agreements or i 6 t is Tonal or obligatory cl an n e given full rim Mme of and on be o el Jlacknowledge and a lMo s� I T - _ en and/or final estimates on en urn ah�onstruction contracts, and an and al li all consents forte tom' r�r gree rate - � percentages 8 � g y ices' documents canceling or terminating Hie Company's liability thereunder, and any such instruments so executed by any such Attorney -in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by i> and any power of attorne r c ^ficatc Gsimile signature or facsimile �l shaWbe �d binding upon the Com_pany�vith respecrzo a to which it is a - _ Z III III�IIII'I - - _ IEREOF, The�4I�III I�rl Nlthis instrument tcsi dttvarporate seals to e�xed�h�= I Oth dayof December, 2012. > - AMERICAN CON'T'RACTORS INDEMNITY COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY ealS aaNtr��y -y - (IIII III ,.i a°'c °,} ~��o b III III III I,. III IIII IIII III l li - � _ � � � , :..: • � � � "� Dame/ P. A filar -- - Wt s g , Vice President �State'ofCalifornia „ +murtu"••.I +fl ele's SS: plIII _ - - ecember,,2U12, e a ht, ,a notary Pu�erk y Daniel P. Agui� P�t�t American Contractors Indemnity C pi inited States Surety Lornpany�an tT.S. Specialty Insurance Company proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person(s), or the entity upon behalf of which the-person(s) acted, executed the instrument. et t � tALTY OF P u > fie of the State o ''' IIII II II IIII III oing paragraphs aa(k rn'Nand and official sQ9 I I V I I I IIII IIII I ul 'Signature (Seal) >r Ile 1111 Ili Ill Hill 1! 11, III !Ili VIII IIII I' p IIIIA _ _ \ Page I of 17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360- 902 -5335 PO Box 44540, Olympia, WA 98504 -4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 4/21/2014 County Trade Job Classification Wade Holiday Overtime Note King Asbestos Abatement Workers Journey Level $41.69 5D 1 H King Boilermakers Journey Level $64.44 5N 1C King Brick Mason Brick And Block Finisher $43.26 5A 1M King Brick Mason Journey Level $50.12 5A 1M King Brick Mason Pointer - Caulker - Cleaner $50.12 5A 1M King Building Service Employees Janitor $20.59 5S 2F King Building Service Employees Traveling Waxer /Shampooer $21.00 5S 2F King Buildine Service Emptoyees Window Cleaner (Non- Scaffold) $24.29 5S 2F King Building Service Employees Window Cleaner (Scaffold) $25.15 5S 2F King Cabinet Makers (In Shops Journey Level $22.74 1 King Carpenters Acoustical Worker $50.82 5D 1M King Carpenters Bridge, Dock And Wharf Carpenters $50.82 5D 1M King Carpenters Carpenter $50.82 5D 1M King Carpenters Carpenters on Stationary Tools $50.95 5D 1M King Carpenters Creosoted Material $50.92 5D 1M King Carpenters Floor Finisher $50.82 5D 1M King Carpenters Floor Layer $50.82 5D 1M King Carpenters Scaffold Erector $50.82 5D 1M King Cement Masons Journey Level $51.18 7A 1M King Divers £t Tenders Diver $105.37 5D 1M 8A King Divers ft Tenders Diver On Standby $59.50 5D 1M King Divers & Tenders Diver Tender $54.82 5D 1M King Divers £t Tenders Surface Rcv & Rov Operator $54.82 5D 1M King Divers ft Tenders Surface Rcv Et Rov Operator Tender $51.07 5A 1 B King Dredge Workers Assistant Engineer $53.00 5D 3F King Dredge Workers Assistant Mate (Deckhand) $52.58 5D 3F https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Page 2 of 17 King Dredge Workers Boatmen $52.30 5D 3F King Dredge Workers Engineer Welder $54.04 5D 3F King Dredge Workers Leverman, Hydraulic $55.17 5D 3F King Dredge Workers Mates $52.30 5D 3F King Dredge Workers Oiler $52.58 5D 3F King Drywall Applicator Journey Level $50.82 5D 1H King Drywall Tapers Journey Level $50.87 5P 1 E King Electrical Fixture Maintenance Journey Level $25.84 5L 1E Workers King Electricians - Inside Cable Splicer $65.69 7C 2W King Electricians - Inside Cable Splicer (tunnel) $70.52 7C 2W King Electricians - Inside Certified Welder $63.49 7C 2W King Electricians - Inside Certified Welder (tunnel) $68.10 7C 2W King Electricians - Inside Construction Stock Person $35.69 7C 2W King Electricians - Inside Journey Level $61.30 7C 2W King Electricians - Inside Journey Level (tunnel) $65.69 7C 2W King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Construction Cable Splicer $68.33 5A 4A King Electricians - Powerline Construction Certified Line Welder $62.50 5A 4A King Electricians - Powerline Construction Groundperson $42.56 5A 4A King Electricians - Powerline Construction Heavy Line Equipment Operator $62.50 5A 4A King Electricians - Powerline Construction Journey Level Lineperson $62.50 5A 4A King Electricians - Powerline Construction Line Equipment Operator $52.47 5A 4A King Electricians - Powerline Construction Pole Sprayer $62.50 5A 4A King Electricians - Powerline Construction Powderperson $46.55 5A 4A King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $80.14 7D 4A King Elevator Constructors Mechanic In Charge $86.77 7D 4A King Fabricated Precast Concrete Products All Classifications - in- Factory Work Only $15.25 5B 1R King Fence Erectors Fence Erector $15.18 1 King Etagggrs Journey Level $35.34 7A 31 King Glaziers Journey Level $53.76 7L 1y King Heat £t Frost Insulators And Journeyman $58.93 5J 15 Asbestos Workers King Heating Equipment Mechanics Journey Level $69.37 7F 1 E King Hod Carriers ft Mason Tenders Journey Level $42.99 7A 31 King Industrial Power Vacuum Journey Level $9.32 1 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/21/2014 Page 3 of 17 https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Cleaner King inland Boatmen Boat Operator $54.57 5B 1K King Inland Boatmen Cook $50.95 5B 1K King Inland Boatmen Deckhand $51.19 5B 1K King Inland Boatmen Deckhand Engineer $52.18 5B 1K King Inland Boatmen Launch Operator $53.40 5B 1K King Inland Boatmen Mate $53.40 5B 1K King. Inspection /Cleaning /Seating Cleaner Operator, Foamer Operator $31.49 1 Sewer Et Water Systems By Remote Control King Inspection /Cleaning /Sealing Of Grout Truck Operator $11.48 1 Sewer Ft Water Systems By Remote Control King Inspection /Cleaning /Sealing Of Head Operator $24.91 1 Sewer Ft Water Systems By Remote Control King Inspection /Cleaning/Seating Of Technician $19.33 1 Sewer Ft Water Systems By Remote Controt King Inspection /Cleaning /Sealing Of Tv Truck Operator $20.45 1 Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $50.82 5D 1M King Ironworkers Journeyman $59.77 7N 10 King laborers Air, Gas Or Electric Vibrating Screed $41.69 7A 31 King Laborers Airtrac Drill Operator $42.99 7A 31 King Laborers Ballast Regular Machine $41.69 7A 31 King laborers Batch Weighman $35.34 7A 31 King Laborers Brick Pavers $41.69 7A 31 King Laborers Brush Cutter $41.69 7A 31 King Laborers Brush Hog Feeder $41.69 7A 31 King Laborers Burner $41.69 7A 31 King Laborers Caisson Worker $42.99 7A 31 King Laborers Carpenter Tender $41.69 7A 31 King Laborers Caulker $41.69 7A 31 King laborers Cement Dumper - paving $42.46 7A 31 King Laborers Cement Finisher Tender $41.69 7A 31 King Laborers Change House Or Dry Shack $41.69 7A 31 King Laborers Chipping Gun (under 30 Lbs.) $41.69 7A 31 King Laborers Chipping Gun(30 Lbs. And Over) $42.46 7A 31 King Laborers Choker Setter $41.69 7A 31 King Laborers Chuck Tender $41.69 7A 31 King Laborers Clary Power Spreader $42.46 7A 31 King Laborers Clean -up Laborer $41.69 7A 31 King Laborers Concrete Dumper /chute $42.46 7A 31 https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Page 4 of 17 https:H fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Operator King Laborers Concrete Form Stripper $41.69 7A 31 King Laborers Concrete Placement Crew $42.46 7A 31 King Laborers Concrete Saw Operator /core Driller $42.46 7A 31 King Laborers Crusher Feeder $35.34 7A 31 King Laborers Curing Laborer $41.69 7A 31 King Laborers Demolition: Wrecking Et Moving (incl. Charred Material) $41.69 7A 31 King Laborers Ditch Digger $41.69 7A 31 King L4borers Diver $42.99 7A 31 King Laborers Drill Operator (hydraulic, diamond) $42.46 7A 31 King Laborers Dry Stack Walls $41.69 7A 31 King Laborers Dump Person $41.69 7A 31 King Laborers Epoxy Technician $41.69 7A 31 King Laborers Erosion Control Worker $41.69 7A 31 King Laborers Fatter It Bucker Chain Saw $42.46 7A 31 King Laborers Fine Graders $41.69 7A 31 King Laborers Firewatch $35.34 7A 31 King Laborers Form Setter $41.69 7A 31 King Laborers Gabian Basket Builders $41.69 7A 31 King Laborers General Laborer $41.69 7A 31 King Laborers Grade Checker £t Transit Person $42.99 7A 31 King Laborers Grinders $41.69 7A 31 King Laborers Grout Machine Tender $41.69 7A 31 King Laborers Groutmen (pressure)including Post Tension Beams $42.46 7A 31 King La orers Guardrail Erector $41.69 7A 31 King Laborers Hazardous Waste Worker (level A) $42.99 7A 31 King Laborers Hazardous Waste Worker (level $42.46 7A 31 King Laborers Hazardous Waste Worker (level C) $41.69 7A 31 King Laborers High Scaler $42.99 7A 31 King Laborers Jackhammer $42.46 7A 31 King Laborers Laserbeam Operator $42.46 7A 31 King Laborers Maintenance Person $41.69 7A 31 King Laborers Manhole Builder - mudman $42.46 7A 31 King Laborers Material Yard Person $41.69 7A 31 King Laborers Motorman -dinky Locomotive $42.46 7A 31 King Laborers Nozzleman (concrete Pump, Green Cutter When Using Combination Of High Pressure Air £t Water On Concrete 8t $42.46 7A 31 https:H fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Page 5 of 17 https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/21/2014 Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $42.46 7A 31 King Laborers Pilot Car $35.34 7A 31 King Laborers Pipe Layer Lead $42.99 7A 31 King Laborers Pipe Layer /tailor $42.46 7A 31 King Laborers Pipe Pot Tender $42.46 7A 31 King Laborers Pipe Reliner $42.46 7A 31 King Laborers Pipe Wrapper $42.46 7A 31 King Laborers Pot Tender $41.69 7A 31 King Laborers Powderman $42.99 7A 31 King Laborers Powderman's Helper $41.69 7A 31 King Laborers Power Jacks $42.46 7A 31 King Laborers Railroad Spike Putter - Power $42.46 7A 31 King Laborers . Raker - Asphalt $42.99 7A 31 King Laborers Re- timberman $42.99 7A 31 King Laborers Remote Equipment Operator $42.46 7A 31 King Laborers Rigger /signal Person $42.46 7A 31 King Laborers Rip Rap Person $41.69 7A 31 King LaLorer Rivet Buster $42.46 7A 31 King Laborers Rodder $42.46 7A 31 King Laborers Scaffold Erector $41.69 7A 31 King Laborers Scale Person $41.69 7A 31 King Laborers Roper (over 20") $42.46 7A 31 King Laborers Stoper Sprayer $41.69 7A 31 King Laborers Spreader (concrete) $42.46 7A 31 King Laborers Stake Hopper $41.69 7A 31 King Laborers Stock Piler $41.69 7A 31 King Laborers Tamper ft Similar Electric, Air Et Gas Operated Toots $42.46 7A 31 King Laborers Tamper (multiple Et Self- propelled) $42.46 7A 31 King Laborers Timber Person - Sewer (tagger, Shorer Et Cribber) $42.46 7A 31 King Laborers Tootroom Person (at Jobsite) $41.69 7A 31 King Laborers Topper $41.69 7A 31 King Laborers Track Laborer $41.69 7A 31 King Laborers Track Liner (power) $42.46 7A 31 King Laborers Traffic Control Laborer $37.79 7A 31 8R King Laborers Traffic Control Supervisor $37.79 7A 31 8R King Laborers Truck Spotter $41.69 7A 31 King Laborers Tugger Operator $42.46 7A 31 King Laborers Tunnel Work- Compressed Air Worker 0 -30 psi '$60.06 7A 31 8� King Laborers Tunnel Work- Compressed Air $65.09 7A 1 31 >� https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/21/2014 Page 6 of 17 https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Worker 30.01 -44.00 psi King laborers Tunnel Work- Compressed Air Worker 44.01 -54.00 psi $68.77 7A 31 8Q King Laborers Tunnel Work- Compressed Air Worker 54.01 -60.00 psi $74.47 7A 31 King Laborers Tunnel Work- Compressed Air Worker 60.01 -64.00 psi $76.59 7A 31 King Laborers Tunnel Work- Compressed Air Worker 64.01 -68.00 psi $81.69 7A 31 8Q King Laborers Tunnel Work- Compressed Air Worker 68.01 -70.00 psi $83.59 7A 31 8� King Laborers Tunnel Work- Compressed Air Worker 70.01 -72.00 psi $85.59 7A 31 8g King Laborers Tunnel Work- Compressed Air Worker 72.01 -74.00 psi $87.59 7A 31 King Laborers Tunnel Work -Guage and Lock Tender $43.09 7A 31 8� King Laborers Tunnel Work -Miner $43.09 7A 31 >� King Laborers Vibrator $42.46 7A 31 King Laborers Vinyl Seamer $41.69 7A 31 King Laborers Watchman $32.12 7A 31 King Laborers Welder $42.46 7A 31 King Laborers Well Point Laborer $42.46 7A 31 King Laborers Window Washer /cleaner $32.12 7A 31 King Laborers - Underground Sewer General Laborer Et Topman $41.69 7A 31 Wat r King laborers - Underground Sewer Pipe Layer $42.46 7A 31 a Water King Landscape Construction Irrigation Or Lawn Sprinkler Installers $13.56 1 King Landscape Construction Landscape Equipment Operators Or Truck Drivers $28.17 1 King Landscape Construction Landscaping or Planting Laborers $17.87 1 King Lathers Journey Level $50.82 5D 1H King Marble Setters Journey Level $50.12 5A 1M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metai Fabrication In Shop} Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication {{n Shops Painter $11.10 1 King Metal Fabrication {In Shop) Welder $15.48 1 King Millwright Journey Level $51.92 5D 1M King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Page 7 of 17 King Modular aL tildin s Tool Maintenance $11.561 1 King Modular Buitdia s Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $37.80 6Z 2B King Pite Driver Journey Level $51.07 5D 1M King Plasterers Journey Level $49.29 Zq 1R King Playground £t Park Equipment Journey Level $9.32 1 Installers King Plumbers & Pipefitters Journey Level $73.69 6Z 1 G King Power Equipment Operators Asphalt Plant Operators $53.49 7A 3C 8P King Power Equipment Operators Assistant Engineer $50.22 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $53.00 7A 3C 8P King Power Equipment Operators Batch Plant Operator, Concrete $53.00 7A 3C 8P King Power Equipment Operators Bobcat $50.22 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition Equipment $50.22 7A 3C 8P King Power Equipment Operators Brooms $50.22 7A 3C 8P King Power Equipment Operators Bump Cutter $53.00 7A 3C 8P King Power Equipment Operators Cableways $53.49 7A 3C 8P King Power Equipment Operators Chipper $53.00 7A 3C 8P King Power Equipment Operators Compressor $50.22 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment Over 42 M $53.49 7A 3C 8P King Power Equipment Operators Concrete Finish Machine -laser Screed $50.22 7A 3C 8P King Power Equipment aerators Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure. $52.58 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment Up To 42m $53.00 7A 3C 8P King Power Equipment Operators Conveyors $52.58 7A 3C 8P King Power Equipment Operators Cranes: 20 Tons Through 44 Tons With Attachments $53.00 7A 3C 8P King Power Equipment Operators Cranes: 100 Tons Through 199 Tons, Or 150' Of Boom (Including Jib With Attachments) $54.04 7A 3C 8P King Power Equipment Operators Cranes: 200 Tons To 300 Tons, Or 250' Of Boom (including Jib With Attachments) $54.61 7A 3C 8P King _Power Equipment Operators Cranes: 45 Tons Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) $53.49 7A 3C 8P King Power Equipment Operators Cranes: A -frame - 10 Tons And Under $50.22 7_A 3C 8P https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/21/2014 Page 8 of 17 King Power E_guioment Operators Cranes: Friction 100 Tons Through 199 Tons $54.61 7A 3C 8P King Power Equipment Operators Cranes: Friction Over 200 Tons $55.17 7A 3C 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' Of Boom (including Jib With Attachments) $55.17 7A 3C 8P King Power Equipment Operators Cranes: Through 19 Tons With Attachments A -frame Over 10 Tons $52.58 7A 3C 8P King Power EquipmenL Operators Crusher $53.00 7A 3C 8P King Power Equipment Operators Deck Engineer /deck Winches (power) $53.00 7A 3C 8P King Power Equipment Operators Derricks, On Building Work $53.49 7A 3C 8P King Power Equipment Operators Dozers D -9 Et Under $52.58 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck Or Crane Mount $52.58 7A 3C 8P King Power Eguipment Operators Drilling Machine $53.00 7A 3C 8P King Power Equipment Operators Elevator And Man -lift: Permanent And Shaft Type $50.22 7A 3C 8P King Power Equipment Operators Finishing Machine, Bidwell And Gamaco Et Similar Equipment $53.00 7A 3C 8P King Power Equipment Operators Forklift: 3000 Lbs And Over With Attachments $52.58 7A 3C 8P King Power Equipment Operators Forklifts: Under 3000 Lbs. With Attachments $50.22 7A 3C 8P King Power Equipment Operators Grade Engineer: Using Blue Prints, Cut Sheets, Etc $53.00 7A 3C 8P King Power Equipment�perators Gradechecker /stakeman $50.22 7A 3C 8P King Power Equipment Operators Guardrail Punch $53.00 7A 3C 8P King Power Equipment Operators Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. Et Over $53.49 7A 3C 8P King Power Equipment Operators Hard Tail End Dump Articulating Off -road Equipment Under 45 Yards $53.00 7A 3C 8P King Power Equipment Operators Horizontal /directional Drill Locator $52.58 7A 3C 8P King Power Equipment Operators Horizontal /directional Drill Operator $53.00 7A 3C 8P King Power Equipment Operators Hydralifts /boom Trucks Over 10 Tons $52.58 7A 3C 8P King Power Equipment Operators Hydralifts /boom Trucks, 10 Tons And Under $50.22 7A 3C 8P King Power Equipment Operators Loader, Overhead 8 Yards. Et Over $54.04 7A 3C 8P King Power Equipment Operators Loader, Overhead, 6 Yards. But Not Including 8 Yards $53.49 7A 3C 8P King Power Equipment aerators Loaders, Overhead Under 6 Yards $53.00 7A 3C 8P https:H fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Page 9 of 17 King Power EquipmenL Operators Loaders, Plant Feed $53.00 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $52.58 7A 3C 8P King Power EquiQment Operators Locomotives, All $53.00 7A 3C 8P King Power Equipment Operators Material Transfer Device $53.00 7A 3C 8P King Power Equipment Operators Mechanics, All (leadmen - $0.50 Per Hour Over Mechanic) $54.04 7A 3C 8P King Power Equipment Operators Motor Patrol Grader - Non- finishing $52.5$ 7A 3C 8P King Power Equipment Operators Motor Patrol Graders, Finishing $53.49 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And /or Shield $53.49 7A 3C 8P King Power Equipment Operators Oil Distributors, Blower Distribution Et Mulch Seeding Operator $50.22 7A 3C 8P King Power Equipment Operators Outside Hoists (elevators And Mantifts), Air Tuggers,strato $52.58 7A 3C 8P King Power Equipment Operators Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $53.00 7A 3C 8P King Power Equipment Operators Overhead, Bridge Type: 100 Tons And Over $54.04 7A 3C 8P King Power Equipment Operators Overhead, Bridge Type: 45 Tons Through 99 Tons $53.49 7A 3C 8P King Power Equipment Operators Pavement Breaker $50.22 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane Mount) $53.00 7A 3C 8P King Power Equipment Operators Plant Oiler - Asphalt, Crusher $52.58 7A 3C 813 King Power Equipment Operators Posthole Digger, Mechanical $50.22 7A 3C 8P King Power Equipment Operators Power Plant $50.22 7A 3C 8P King Power Equipment Operators Pumps - Water $50.22 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $53.49 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under 100 Feet In Height Based To Boom $50.22 7A 3C 8P King Power Equipment Operators Remote Control Operator On Rubber Tired Earth Moving Equipment $53.49 7A 3C 8P King Power Equipment Operators Rigger And Bellman $50.22 7A 3C 8P King Power Equipment Operators Roltagon $53.49 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $50.22 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi -lift Materials $52.58 7A 3C 8P King Power Equipment Operators Roto -mill, Roto - grinder $53.00 7A 3C 8P King Power Equipment Operators Saws - Concrete $52.58 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under 45 Yards $53.00 7A 3C 8P King Power Equipment Operators Scrapers - Concrete Et Carry All 81 7A I 3C 8P King Power Equipment Operators Scrapers, Self- propelled: 45 $53.49 7A I 3C SP https:H fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Page 10 of] 7 https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/21/2014 Yards And Over King Power E ui ment O erators Service Engineers - Equipment $52.58 7A 3C 8P King Power Equipment Operators Shotcrete /gunite Equipment $50.22 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, Tractors Under 15 Metric Tons. $52.58 7A 3C 8P King Power Equipment Operators Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons $53.49 7A 3C 8P King Power Equipment Operators Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons $53.00 7A 3C 8P King Power Equipment Operators Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons $54.04 7A 3C 8P King Power Equipment Operators Shovel, Excavator, Backhoes: Over 90 Metric Tons $54.61 7A 3C 8P King Power Equipment Operators Slipform Pavers $53.49 7A 3C 8P King Power Equipment Operators Spreader, Topsider Et Screedman $53.49 7A 3C 8P King Power Equipment Operators Subgrader Trimmer $53.00 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $52.58 7A 3C 8P King Power Equipment Operators Tower Crane Over 175'in Height, Base To Boom $54.61 7A 3C 8P King Power Equipment Operators Tower Crane Up To 175' In Height Base To Boom $54.04 7A 3C 8P King Power Equipment Operators Transporters, All Track Or Truck Type $53.49 7A 3C 8P King Power Equipment Operators Trenching Machines $52.58 7A 3C 8P King Power Equipment Operators Truck Crane Oiler /driver - 100 Tons And Over $53.00 7A 3C 8P King Power Equipment Operators Truck Crane Oiler /driver Under 100 Tons $52.58 7A 3C 8P King Power Equipment Operators Truck Mount Portable Conveyor $53.00 7A 3C 8P King Power Equipment Operators Welder $53.49 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farman Type $50.22 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $53.00 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $53.49 7A 3C BE Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, Concrete $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Bobcat $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition Equipment $50.22 7A 3C 8P Underground Sewer Et Water King Power E uc ipment Operators- Brooms $50.22 7_A 3C 8P Under round Sewer Et Water https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/21/2014 Page 11 of 17 King Power Equipment Operators- Bump Cutter $53.00 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Cableways $53.49 7A 3C 8P Underground Sewer £t Water King Power Equipment Operators- Chipper $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Compressor $50.22 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Concrete Pump: Truck Mount With Boom Attachment Over 42 M $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Finish Machine -laser Screed $50.22 7A 3C 8P Underground Sewer it Water King Power Equipment Operators- Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure. $52.58 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Concrete Pump: Truck Mount With Boom Attachment Up To 42m $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Conveyors $52.58 7A 3C 8P Underground Sewer £t Water King Power Equipment Operators- Cranes: 20 Tons Through 44 Tons With Attachments $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 100 Tons Through 199 Tons, Or 150' Of Boom (Including Jib With Attachments) $54.04 7A 3C 8P Underground Sewer Ft Water King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, Or 250' Of Boom (including Jib With Attachments) $54.61 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 45 Tons Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) $53.49 7A 3C 8P Under round Sewer Et Water King Power Equipment Operators- Cranes: A -frame - 10 Tons And Under $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Friction 100 Tons Through 199 Tons $54.61 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Friction Over 200 Tons $55.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' Of Boom (including Jib With Attachments) $55.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Through 19 Tons With Attachments A -frame Over 10 Tons $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Crusher $53.00 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Deck Engineer /deck Winches (power) $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Derricks, On Building Work $53.49 7A 3C 8P https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Page 12 of 17 https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Underground Sewer Et Water King Power Equipment Operators- Dozers D -9 Et Under $52.58 7A — 3C — 8P — Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck Or Crane Mount $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Drilling Machine $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Elevator And Man -lift: Permanent And Shaft Type $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Finishing Machine, Bidwell And Gamaco Et Similar Equipment $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Forklift: 3000 Lbs And Over With Attachments $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Forklifts: Under 3000 Lbs. With Attachments $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Grade Engineer: Using Blue Prints, Cut Sheets, Etc $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Gradechecker /stakeman $50.22 7A — 3C — 8P — Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tait End Dump Articulating Off- Road Equipment 45 Yards. 8t Over $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump Articulating Off -road Equipment Under 45 Yards $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Horizontal /directional Drill Locator $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Horizontal /directional Drill Operator $53.00 7A 3C 8P Underground Sewer £t Water King Power Equipment Operators- Hydralifts /boom Trucks Over 10 Tons $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hydralifts /boom Trucks, 10 Tons And Under $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loader, Overhead 8 Yards. Et Over $54.04 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loader, Overhead, 6 Yards. But Not Including 8 Yards $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loaders, Overhead Under 6 Yards $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Underground Sewer Et Water Loaders, Plant Feed $53.00 7A 3C 8P King Power Equipment Operators- Loaders: Elevating Type Belt $52.58 7A 3C 8P Under round Sewer Et Water King Power Equipment Operators- Locomotives, All $53.00 7A — 3C — 8P — Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $53.00 7A — 3C — 8P — Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $54.04 7A 3C 8P https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Page 13 of 17 https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/21/2014 Underground Sewer Et ate:_ $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Motor Patrol Grader - Non- finishing $52.58 7A — 3C — 8P — Underground Sewer Ex Water King Power Equipment Operators- Motor Patrol Graders, Finishing $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And /or Shield $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Oil Distributors, Blower Distribution It Mulch Seeding Operator $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Outside Hoists (elevators And Manlifts), Air Tuggers,strato $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Overhead, Bridge Type: 100 Tons And Over $54.04 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Overhead, Bridge Type: 45 Tons Through 99 Tons $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pavement Breaker $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane Mount) $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $52.58 7A - 3C 8P Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Power Plant $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $50.22 7A 3C 8P Underground Sewer It Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under 100 Feet In Height Based To Boom $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Remote Control Operator On Rubber Tired Earth Moving Equipment $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rigger And Bellman $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rollagon $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Mutti -lift Materials $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roto -mill, Roto - grinder $53.00 7A — 3C 8P — Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $52.58 7A 3C 8P https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/21/2014 Page 14 of 17 https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/91 0014 Underground Sewer a Water King Power Equipment Operators- Scraper, Self Propelled Under 45 Yards $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Scrapers - Concrete Et Carry All $52.58 7A — 3C — 8P — Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self - propelled: 45 Yards And Over $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Service Engineers - Equipment $52.58 7A — 3C — 813 — Underground Sewer Et Water King Power Equipment Operators- Shotcrete /gunite Equipment $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, Tractors Under 15 Metric Tons. $52.58 7A 3C 8P Underground Sewer £t Water King Power Equipment Operators- Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons $54.04 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoes: Over 90 Metric Tons $54.61 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Slipform Pavers $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider It Screedman $53.49 7A 3C IE Underground Sewer Et Water King Power Equipment Operators- Subgrader Trimmer $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'in Height, Base To Boom $54.61 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Up To 175' In Height Base To Boom $54.04 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Transporters, All Track Or Truck Type $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Underground Sewer Et Water Trenching Machines $52.58 7A 3C 8P King Power Equipment Operators- Truck Crane Oiler /driver - 100 Tons And Over $53.00 7A 3C 813 Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler /driver Under 100 Tons $52.58 7A 3C 8P Underground Sewer Et Water King Power. Equipment Operators- Truck Mount Portable Conveyor $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Welder $53.49 7A 3C — 8P — Underground Sewer Et Water King Power Equipment O ep rators- Wheel Tractors, Farmall Type $50.22 7_A 3C — 8P — Underground Sewer Et Water King Power Equipment C }gyrators_ Yo Yo Pay Dozer $53.00 7A 3C 8P https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/91 0014 Page 15 of 17 https: // fortress. wa. gov/ lni /wagelookup /pivWagelookup.asl)x 4/9 t 0n i a Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $44.86 5A - 4A - Trimmers King Power Line Clearance Tree Spray Person $42.58 5A - 4A - Trimmers King Power Line Clearance Tree Tree Equipment Operator $44.86 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $40.08 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $30.20 5A 4A Trimmers King Refrigeration Et Air Conditioning Mechanics Journey Level $72.46 6Z 1G King Residential Brick Mason Journey Level $50.12 5A 1M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Dr Mall Applicators Journey Level $39.62 5D 1M King Residential Drywall Tapers Journey Level $50.87 5P 1 E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $36.20 7L 1H King Residential insulation Applicators Journey Level $26.28 1 King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Pipefitters Journey Level $34.69 1 King Residential Refrigeration Et Air Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Sheet Metal Workers Journey Level (Field or Shop) $41.84 7F 1R King Residential Soft Floor Layers Journey Level $42.15 5A 3D King Residential Sprinkler Fitters Journey Level $42.48 5C - 211 - (Fire Protection) King Residential Stone Masons Journey Level $50.12 5A 1M King Residential Terrazzo Workers Journey Level $46.96 5A 1M King Residential Terrazzo /Tile Finishers Journey Level $21.46 1 King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $44.71 3H King Roofers Using Irritable Bituminous Materials $47.71 ff7F 3H King Sheet Metal Workers Journey Level (Field or Shop) $69.37 1 E King Shipbuilding £t Shi Repair Boilermaker $40.12 7M 1H King Shipbuilding a Ship Repair Carpenter $38.24 70 3B King Shipbuilding Et Ship Repair Electrician $37.80 70 3B King Shipbuilding Et Ship Repair Heat Et Frost Insulator $58.93 5J 15 https: // fortress. wa. gov/ lni /wagelookup /pivWagelookup.asl)x 4/9 t 0n i a Page 16 of 17 King Shipbuilding £t Shin Repair Laborer $36.78 70 3B King Shipbuilding Et Ship Repair Machinist $37.81 70 3B King Shipbuilding Et Ship Repair Operator $40.15 70 3B King Shipbuilding Et Ship Repair Painter $37.79 70 3B King Shipbuilding Et Ship Repair Pipefitter $37.77 70 3B King Shipbuilding Ship Repair Rigger $37.74 70 3B King Shipbuilding Et Ship Repair Sandblaster $36.78 70 3B King Shipbuilding Et Ship Repair Sheet Metal $37.74 70 3B King Shi bup ilding Et Ship Repair Shipfitter $37.74 70 3B King Shipbuilding Et Ship Repair Trucker $37.59 70 3B King Shipbuilding Et Ship Repair Warehouse $37.64 70 3B King Shipbuilding %Ship Repair Welder /Burner $37.74 70 3B King Sign Makers Et Installers (Electrical) Sign Installer $22.92 1 King Sign Makers £t Installers (Electrical) Sign Maker $21.36 1 King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electrical) King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Electrical King Soft Floor Layers Journey Level $42.15 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Protection) Journey Level $69.59 5C - 1X - King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) King Stone Masons Journey Level $50.12 5A 1M King Street And Parkine Lot Sweeper Workers Journey Level $19.09 1 King Surveyors Assistant Construction Site Surveyor $52.58 7A. 3C 8P King Surveyors Chairman $52.06 7A 3C 8P King Surveyors Construction Site Surveyor $53.49 7A 3C 8P King Telecommunication Technicians Journey Level $22.76 1 King Telephone Line Construction - Cable Splicer $36.01 5A 2B Outside King Telephone Line Construction - Hole Digger /Ground Person $20.05 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $34.50 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $36.01 5A - 2B - Outside King Telephone Line Construction - Special Apparatus Installer II $35.27 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator (Heavy) $36.01 5A 2B Outside I King ITetephone Line Construction Telephone Equipment Operatorl $33.471 5A 2B https:Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/21/2014 Page 17 of 17 https:H fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014 Outside (Light) King Telephone Line Construction - Telephone Lineperson $33.47 5A 2B Outside King Telephone Line Construction - Television Groundperson $19.04 5A 2B Outside King Telephone Line Construction - Television Lineperson /Installer $25.27 5A 2B Outside King Telephone Line Construction - Television System Technician $30.20 5A 2B Outside King Telephone Line Construction - Television Technician $27.09 5A 2B Outside King Telephone Line Construction - Tree Trimmer $33.47 5A 2B Outside King Terrazzo Workers Journey Level $46.96 5A 1M King Tile Setters Journey Level $21.65 1 King Tile, Marble 8t Terrazzo Finishers Finisher $37.79 5A — 1 B — King Traffic Control Stripers Journey Level $42.33 7A 1 K King Truck Drivers Asphalt Mix Over 16 Yards (W. WA -Joint Council 28) $48.87 5D 3A 8L King Truck Drivers Asphalt Mix To 16 Yards (W. WA -Joint Council 28) $48.03 5D 3A 8L King Truck Drivers Dump Truck Et Trailer $48.87 5D 3A 8L King Truck Drivers Dump Truck (W. WA -Joint Council 28) $48.03 5D 3A 8L King Truck Drivers Other Trucks (W. WA -Joint Council 28) $48.87 5D 3A 8L King Truck Drivers Transit Mixer $43.23 1 King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers Et Irrigation Pump Oiler $12.97 1 Installers King Well Drillers Et Irrigation Pump Well Driller $18.00 1 Installers https:H fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 4/21/2014