Loading...
AG 14-142TO: 1-1$144 EXT: 14;c0/ CITY OF FEDERAL WAY LAW DEPARTMENT ROUTING FORM 1. j ORIGINATING DEPT/DIv: PUBLIC WORKS 1,964016C /✓hrl- /JlArVA67 6yr' ' s 2. ORIGINATING STAFF PERSON: Z /y Dam4 C' EXT: ,'t 3 3. DATE REQ. BY: ?o 4. ! TYPE OF DOCUMENT (CHECK ONE): ❑ CONTRACTOR SELECTION DOCUMENT (E.G., RFB, RFP, RFQ) ❑ PUBLIC WORKS CONTRACT ❑ SMALL OR LIMITED PUBLIC WORKS CONTRACT ❑ PROFESSIONAL SERVICE AGREEMENT M/MAINTENANCE AGREEMENT j ❑ GOODS AND SERVICE AGREEMENT ❑ HUMAN SERVICES/ CDBG ❑ REAL ESTATE DOCUMENT ❑ SECURITY DOCUMENT (E.G. BOND RELATED DOCUMENTS) ❑ ORDINANCE ❑ RESOLUTION ' ❑ CONTRACT AMENDMENT (AG #): ❑ INTERLOCAL I ❑ OTHER 'PROJECT r' P t � CS uz .7 u a ll� + 6. 1 NAME OF ADDRESS: 6110 Nrr 'Y Z�flfIrC *1e Sf &ng' /.Q Q8 //< TELEPHONE: (A&) 122.9296 E -MAIL: 6►tco��ri/Lp"S. oiL4—�� � FAX: /2gj S;22,- 9. x SIGNATURE NAME: -, Me /f Z / TITLE�ji /SCOPE, 7. EXHIBITS AND ATTACHMENTS: C� SCOPE, WORK OR SERVICES COMPENSATION ❑ INSURANCE REQUIREMENTS /CERTIFICATE ❑ ALL OTHER REFERENCED EXHIBITS ❑ PROOF OF AUTHORITY TO SIGN ❑ REQUIRED LICENSES ❑ PRIOR CONTRACT /AMENDMENTS CFW LICENSE # 11 1003D1 OtO 00 BL, EXP. 12/31/ (f UBI # b0145910'7 EXP..4 /90/ tS 8. TERM: COMMENCEMENT DATE: l`)W COMPLETION DATE: / / / /� /5-- 9. TOTAL COMPENSATION: $ 29 (INCLUDE EXPENSES AND SALES TAX, IF ANY) (IF CALCULATED ON HO LY LABOR CHARGE - ATTACH SCHEDULES OF EMPLOYEES TITLES AND HOLIDAY RATES) REIMBURSABLE EXPENSE: ❑ YES ❑ NO IF YES, MAXIMUM DOLLAR AMOUNT: $ IS SALES TAX OWED: ❑ YES ❑ NO IF YES, $ ❑ PURCHASING: PLEASE CHARGE TO: A161 -31AW 6y® 3'N2 ^ Y57-1,1i 10. DOCU)XENT / CONTRACT REVIEW IV PROJECT MANAGER ❑ DIVISION MANAGER W�6EPUTY DIRECTOR W''bIRECTOR ❑ RISK MANAGEMENT (IF APPLICABLE) cC LAW DEPT 11. COUNCIL APPROVAL (IF APPLICABLE) INITIAL / D TE VIEWED COMMITTEE APPROVAL DATE: 12. CONTRACT SIGNATURE ROUTING ❑ SENT TO VENDOR/CONTRACTOR DATE SENT: lZ 114 ❑ ATTACH: SIGNATURE AUTHORITY, INSURANCE CERTIFICATE, LICENSES, EXHIBITS pqle LAW DEPT ❑ CHIEF OF STAFF C7 / SIGNATORY (MAYOR DIRECTOR) d CITY CLERK ASSIGNED AG # M'SIGN D COPY RETURNED M3RETURN ONE ORIGINAL PAID BY: ❑ CONTRACTOR ❑ CITY INITIAL / DATE APPROVED C�� y 2XI1i{�'� revlCl,S COUNCIL APPROVAL DATE: DATE REC'D:.�a_��� TJukN& COMMENTS: EXECUTE ",4 " ORIGINALS _:r.�. /r i �d L� i I/ / �a.i 15 11/9 CITY Of CITY HALL .r Federal Feder 8th Avenue South Federal way. "trilA 9s0o3 -6325 (253) 535 -7000 wwGti +-.ryoffe:derrri aycorn PUBLIC WORKS MAINTENANCE AGREEMENT FOR INVASIVE SPECIES AND TRASH REMOVAL IN HYLEBOS WATERSHED CONSERVATION PROPERTIES This Public Works Maintenance Agreement ( "Agreement ") is made between the City of Federal Way, a Washington municipal corporation ( "City "), and EarthCorps, a Washington non - profit organization ( "Contractor "). The City and Contractor (together "Parties ") are located and do business at the below addresses which shall be valid for any notice required under this Agreement: EARTHCORPS: Bill Brosseau, Field Director 6310 NE 74`h St, Suite 201 E Seattle, WA 98115 (206) 322 -9296 x207 (telephone) (206) 322 -9312 (facsimile) The Parties agree as follows: CITY OF FEDERAL WAY: Tony Doucette, SWM Engineer 33325 8' Ave. S. Federal Way, WA 98003 -6325 (253) 835 -2753 (telephone) (253) 835 -2709 (facsimile) ffederalway.com 1. TERM. The term of this Agreement shall commence upon the effective date of this Agreement, which shall be the date of mutual execution, and shall continue until the completion of the Work, but in any event no later than May 31 S', 2015 ( "Term "). This Agreement may be extended for additional periods of time upon the mutual written agreement of the City and the Contractor. 2.1 Work. The Contractor shall provide goods, materials or services and otherwise perform the work more specifically described in Exhibit "A ", attached hereto and incorporated by this reference ( "Work "), performed to the City's satisfaction, within the time period prescribed by the City and pursuant to the direction of the Mayor or his or her designee. 2.2 Warranties. The Contractor warrants that it has the requisite training, skill, and experience necessary to provide the Work and is appropriately accredited and licensed by all applicable agencies and governmental entities, including but not limited to obtaining a City of Federal Way business registration. The Contractor warrants it will provide services in a manner consistent with the accepted practices for other similar services within the Puget Sound region in effect at the time those services are performed. The Contractor warrants goods are merchantable, are fit for the particular purpose for which they were obtained, and will perform in accordance with their specifications and Contractor's representations to City. The Contractor shall, at its sole cost and expense, correct all Work performed which the City deems to have defects in workmanship and material discovered within one (1) year after the City's final acceptance of the Work. This Agreement is subject to all warranty provisions established under the Uniform Commercial Code, Title 62A RCW. In the event any part of the goods are repaired, only original replacement parts shall be used — rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time PW MAINTENANCE AGREEMENT - 1 - Rev. 6/2012 CI'T'Y OF CITY HALL 33325 8th Avenue 50 �� E ederaE Way, l ��A 980003 3 -6325 1_97 (253)835 -7000 as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. 2.3 Time, Documentation, and Inspection. Work shall begin immediately upon the effective date of this Agreement. Work shall be subject, at all times, to observation and inspection by and with approval of the City, but the making (or failure or delay in making) such inspection or approval shall not relieve Contractor of responsibility for performance of the Work in accordance with this Contract, notwithstanding the City's knowledge of defective or non - complying performance, its substantiality or the ease of its discovery. 2.4 Clean Up. At any time ordered by the City and immediately after completion of the Work, the Contractor shall, at its own expense, clean up and remove all refuse and unused materials of any kind resulting from the Work. In the event the Contractor fails to perform the necessary clean up, the City may, but in no event is it obligated to, perform the necessary clean up and the costs thereof shall be immediately paid by the Contractor to the City and /or the City may deduct its costs from any remaining payments due to the Contractor. 3. TERMINATION. Either party may terminate this Agreement, with or without cause, upon providing the other parry thirty (30) days written notice at its address set forth on the signature block of this Agreement. The City may terminate this Agreement immediately if the Contractor fails to maintain required insurance policies, breaches confidentiality, or materially violates Section 12 and may result in ineligibility for further City agreements. 4. COMPENSATION. 4.1 Amount. In return for the Work, the City shall pay the Contractor an amount not to exceed a maximum amount and according to a rate or method as delineated in Exhibit "B ", attached hereto and incorporated by this reference. The Contractor agrees that any hourly or flat rate charged by it for its services contracted for herein shall remain locked at the negotiated rate(s) for the Term. Except as otherwise provided in Exhibit "B ", the Contractor shall be solely responsible for the payment of any taxes imposed by any lawful jurisdiction as a result of the performance and payment of this Agreement. 4.2 Method of Pa ment. On a monthly basis, the Contractor shall submit a voucher or invoice in the form specified by the City, including a description of what Work have been performed, the name of the personnel performing such Work, and any hourly labor charge rate for such personnel. The Contractor shall also submit a final bill upon completion of all Work. Payment shall be made on a monthly basis by the City only after the Work have been performed and within thirty (30) days after receipt and approval by the appropriate City representative of the voucher or invoice. If the Work do not meet the requirements of this Agreement, the Contractor will correct or modify the work to comply with the Agreement. The City may withhold payment for such work until the work meets the requirements of the Agreement. 4.3 Defective or Unauthorized Work. If any goods, materials, or services provided under this Agreement are either defective, unauthorized, or otherwise do not meet the requirements of this Agreement, the Contractor will correct or modify the work to comply with the Agreement and the City reserves the right to withhold payment from the Contractor until the goods, materials, or services are acceptable to the City. If Contractor is unable, for any reason, to complete any part of this Agreement, the City may obtain the goods, materials or services from other sources, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Agreement price specified above. The City further reserves its right to deduct these additional costs incurred to complete this Agreement with other sources, from any and all amounts due or to become due the Contractor. PW MAINTENANCE AGREEMENT - 2 - Rev. 6/2012 CITY OF CITY HALL 33325 8th Avenue South `�edera[ Way, �tUA 98003 -632 {253) 838 - 7000 mw : c)tYof1edef*0tway —corn 4.4 Non - Appropriation of Funds. If sufficient funds are not appropriated or allocated for payment under this Agreement for any future fiscal period, the City will not be obligated to make payments for Work or amounts incurred after the end of the current fiscal period, and this Agreement will terminate upon the completion of all remaining Work for which funds are allocated. No penalty or expense shall accrue to the City in the event this provision applies. 4.5 Final Payment: Waiver of Claims. Contractor's acceptance of final payment shall constitute a waiver of any and all claims, except those previously and properly made and identified by Contractor as unsettled at the time request for final payment is made. 4.6 Bond. As this is a contract for less than thirty -five thousand dollars, and as the Contractor has requested it, pursuant to RCW 39.08, the City, in lieu of the bond, will retain fifty percent of the contract amount for a period of thirty days after the date of final acceptance, or until receipt of all necessary releases from the department of revenue, the employment security department, and the department of labor and industries and settlement of any liens filed under chapter 60.28 RCW, whichever is later. Contractor's obligations under this Agreement shall not be limited to the dollar amount of the retained funds. 5. INDEMNIFICATION. 5.1 Contractor Indemnification. The Contractor agrees to release indemnify, defend, and hold the City, its elected officials, officers, employees, agents, representatives, insurers, attorneys, and volunteers harmless from any and all claims, demands, actions, suits, causes of action, arbitrations, mediations, proceedings, judgments, awards, injuries, damages, liabilities, taxes, losses, fines, fees, penalties expenses, attorney's fees, costs, and /or litigation expenses to or by any and all persons or entities, including, without limitation, their respective agents, licensees, or representatives, arising from, resulting from, or in connection with this Agreement or the performance of this Agreement, except for that portion of the claims caused by the City's sole negligence. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. Contractor shall ensure that each sub - contractor shall agree to defend and indemnify the City, its elected officials, officers, employees, agents, representatives, insurers, attorneys, and volunteers to the extent and on the same terms and conditions as the Contractor pursuant to this paragraph. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. 5.2 Industrial Insurance Act Waiver. It is specifically and expressly understood that the Contractor waives any immunity that may be granted to it under the Washington State industrial insurance act, Title 51 RCW, solely for the purposes of this indemnification. Contractor's indemnification shall not be limited in any way by any limitation on the amount of damages, compensation or benefits payable to or by any third party under workers' compensation acts, disability benefit acts or any other benefits acts or programs. The Parties further acknowledge that they have mutually negotiated this waiver. 5.3 City Indemnification. The City agrees to release, indemnify, defend and hold the Contractor, its officers, directors, shareholders, partners, employees, agents, representatives, and sub- contractors harmless from any and all claims, demands, actions, suits, causes of action, arbitrations, mediations, proceedings, judgments, awards, injuries, damages, liabilities, losses, fines, fees, penalties expenses, attorney's fees, costs, and /or litigation PW MAINTENANCE AGREEMENT - 3 - Rev. 6/2012 CITY Of CITY HALL 33325 8th Avenue South Federal Way Federal ,Nay, "A 98003 -5325 (253) 335 -71100 expenses to or by any and all persons or entities, including without limitation, their respective agents, licensees, or representatives, arising from, resulting from or connected with this Agreement to the extent solely caused by the negligent acts, errors, or omissions of the City. 5.4 Survival. The provisions of this Section shall survive the expiration or termination ofthis Agreement with respect to any event occurring prior to such expiration or termination. 6. INSURANCE. The Contractor agrees to carry insurance for liability which may arise from or in connection with the performance of the services or work by the Contractor, their agents, representatives, employees or subcontractors for the duration of the Agreement and thereafter with respect to any event occurring prior to such expiration or termination as follows: 6.1. Minimum Limits. The Contractor agrees to carry as a minimum, the following insurance, in such forms and with such carriers who have a rating that is satisfactory to the City: a. Commercial general liability insurance covering liability arising from premises, operations, independent contractors, products - completed operations, stop gap liability, personal injury, bodily injury, death, property damage, products liability, advertising injury, and liability assumed under an insured contract with limits no less than $1,000,000 for each occurrence and $2,000,000 general aggregate. b. Workers' compensation and employer's liability insurance in amounts sufficient pursuant to the laws of the State of Washington; C. Automobile liability insurance covering all owned, non - owned, hired and leased vehicles with a minimum combined single limits in the minimum amounts required to drive under Washington State law per accident for bodily injury, including personal injury or death, and property damage. 6.2. No Limit of Liability. Contractor's maintenance of insurance as required by the agreement shall not be construed to limit the liability of the Contractor to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self - insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 6.3. Additional Insured, Verification. The City shall be named as additional insured on all commercial general liability insurance policies. Concurrent with the execution of this Agreement, Contractor shall provide certificates of insurance for all commercial general liability policies attached hereto as Exhibit "C" and incorporated by this reference. At City's request, Contractor shall furnish the City with copies of all insurance policies and with evidence of payment of premiums or fees of such policies. If Contractor's insurance policies are "claims made," Contractor shall be required to maintain tail coverage for a minimum period of three (3) years from the date this Agreement is actually terminated or upon project completion and acceptance by the City. 6.4 Survival. The provisions of this Section shall survive the expiration or termination of this Agreement. 7. CONFIDENTIALITY. All information regarding the City obtained by Contractor in performance of this Agreement shall be considered confidential subject to applicable laws. Breach of confidentiality by the Contractor may be grounds for immediate termination. The Contractor will fully cooperate with the City in identifying and assembling records in case of any public disclosure request. 8. WORK PRODUCT. All originals and copies of work product, including plans, sketches, layouts, designs, design specifications, records, files, computer disks, magnetic media or material which may be produced or modified by Contractor while performing the Work shall belong to the City upon delivery. The Contractor shall delivery all PW MAINTENANCE AGREEMENT - 4 - Rev. 6/2012 CITY OF CITY HALL Federal Feder 8th revenue South ii"' Federal Way, WA 98003 -325 w.: (253) 835 -7000 VWAV,cftV0ff0de10€ K1y.COM needed or contracted for work project upon demand. All records submitted by the City to the Contractor will be safeguarded by the Contractor. Contractor shall make such data, documents, and files available to the City upon the City's request. At the expiration or termination of this Agreement, all originals and copies of any such work product remaining in the possession of Contractor shall be delivered to the City. 9. BOOKS AND RECORDS. The Contractor agrees to maintain books, records, and documents which sufficiently and properly reflect all direct and indirect costs related to the performance of the Work and maintain such accounting procedures and practices as may be deemed necessary by the City to assure proper accounting of all funds paid pursuant to this Agreement. These records shall be subject, at all reasonable times, to inspection, review or audit by the City, its authorized representative, the State Auditor, or other governmental officials authorized by law to monitor this Agreement. 10. INDEPENDENT CONTRACTOR / EMPLOYEE CONDITIONS. 10.1 Independence. The Parties intend that the Contractor shall be an independent contractor and that the Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. The City shall be neither liable nor obligated to pay Contractor sick leave, vacation pay or any other benefit of employment, nor to pay any social security, income, or other tax which may arise as an incident of employment, except as specifically provided in Section 4. Industrial or any other insurance that is purchased for the benefit of the City, regardless of whether such may provide a secondary or incidental benefit to the Contractor, shall not be deemed to convert this Agreement to an employment contract. If the Contractor is a sole proprietorship or if this Agreement is with an individual, the Contractor agrees to notify the City and complete any required form if the Contractor retired under a State of Washington retirement system and agrees to indemnify any losses the City may sustain through the Contractor's failure to do so. 10.2 Safety. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors at the work site and in the performance of the contract work and shall utilize all protection necessary for that purpose. Contractor shall comply with all applicable provisions of federal, state and municipal safety and health laws and codes, including without limitation, all OSHA/WISHA requirements, Safety and Health Standards for Construction Work (Chapter 296 -155 WAC), General Safety and Health Standards (Chapter 296 -24 WAC), and General Occupational Health Standards (Chapter 296 -62 WAC). Contractor shall erect and properly maintain, at all times, all necessary guards, barricades, signals and other safeguards at all unsafe places at or near the site for the protection of its employees and the public, safe passageways at all road crossings, crosswalks, street intersections, post danger signs warning against known or unusual hazards and do all other things necessary to prevent accident or loss of any kind. Contractor shall protect from damage all water, sewer, gas, steam or other pipes or conduits, and all hydrants and all other property that is likely to become displaced or damaged by the performance of the Work. The Contractor shall, at its own expense, secure and maintain a safe storage place for its materials and equipment and is solely responsible for the same 10.3 Risk of Work. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. Industrial or any other insurance that is purchased for the benefit of the City, regardless of whether such may provide a secondary or incidental benefit to the Contractor, shall not be deemed to convert this Agreement to an employment contract. Even though Contractor is an independent contractor, the work must meet the approval of the City and shall be subject to the City's general right of inspection to secure satisfactory completion PW MAINTENANCE AGREEMENT - 5 - Rev. 6/2012 CI'T'Y OF CITY HALL Federal Way 33325 8th Avenue South Federal Way, VIVA 98003 -6325 ' (253) 835 -7000 10.4 Prevailing Wages. 10.4.1 Wages of Employees. This Agreement is subject to the minimum wage requirements of Chapter 39.12 of the Revised Code of Washington, as now existing or hereafter amended or supplemented. In the payment of hourly wages and fringe benefits to be paid to any of Contractor's laborers, workers and/or mechanics, Contractor shall not pay less than the "prevailing rate of wage" for an hour's work in the same trade or occupation in the locality within the State of Washington where such labor is performed, as determined by the Industrial Statistician of the Department of Labor and Industries of the State of Washington, which current "prevailing rates of wage" are attached hereto as Exhibit "D" and incorporated herein by this reference. Prevailing wages paid pursuant to this Agreement shall be the prevailing wage rates that are in effect on the date when the bids, proposals, or quotes were required to be submitted to the City. 10.4.2 Agreements Exceeding One Year. Pursuant to WAC 296 - 127 -023, or hereafter amended, the City agrees to pay any increase in the current prevailing wages if and when this Contract is extended provided that the term of the Contract exceeds one year. The City further agrees to pay the current prevailing wages at the time of additional yearly extensions, and the Contractor agrees to pay its employees the increased prevailing wage. 10.4.3 Exemptions to Prevailing Wage. The prevailing wage requirements of Chapter 39.12 RCW, and as required in this Agreement do not apply to: Sole owners and their spouses; any partner who owns at least 30% of a partnership; the President, Vice President and Treasurer of a corporation if each one owns at least 30% of the corporation. 10.4.4 Reporting Requirements. Contractor shall comply with all reporting requirements of the Department of Labor and Industries of the State of Washington. Upon the execution of this Agreement, Contractor shall complete and file a Statement of Intent to Pay Prevailing Wages with the Department of Labor and Industries. Upon completion of the Work, Contractor shall complete and file an Affidavit of Wages Paid with the Department of Labor and Industries. Contractor shall deliver copies of both the Statement of Intent to Pay Prevailing Wages and the Affidavit of Wages Paid, certified by the Department of Labor and Industries, to the City. 10.4.5 Disputes. In the event any dispute arises as to what are the prevailing rates of wages for work of a similar nature and such dispute cannot be resolved by the City and the Contractor, the matter shall be referred for arbitration to the Director of the Department of Labor and Industries of the State of Washington and the decision therein shall be final and conclusive and binding on all parties involved in the dispute. 11. CONFLICT OF INTEREST. It is recognized that Contractor may or will be performing professional services during the Term for other parties; however, such performance of other services shall not conflict with or interfere with Contractor's ability to perform the Services. Contractor agrees to resolve any such conflicts of interest in favor of the City. Contractor confirms that Contractor does not have a business interest or a close family relationship with any City officer or employee who was, is, or will be involved in the Contractor's selection, negotiation, drafting, signing, administration, or evaluating the Contractor's performance. 12. EQUAL OPPORTUNITY EMPLOYER. In all services, programs, activities, hiring, and employment made possible by or resulting from this Agreement or any subcontract, there shall be no discrimination by Contractor or its subcontractors of any level, or any of those entities' employees, agents, subcontractors, or representatives against any person because of sex, age (except minimum age and retirement provisions), race, color, religion, creed, PW MAINTENANCE AGREEMENT - 6 - Rev. 6/2012 Ak CITY OF 7N Federal Way CITY [-BALL 33325 Sth Avenue SOLIth Federal Way, WA 98003 -6325 (253) 835 -7000 vvvi v C;r ,,Cflezierahvcfy coo national origin, marital status, or the presence of any disability, including sensory, mental or physical handicaps, unless based upon a bona fide occupational qualification in relationship to hiring and employment. This requirement shall apply, but not be limited to the following: employment, advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. Contractor shall comply with and shall not violate any of the terms of Chapter 49.60 RCW, Title VI of the Civil Rights Act of 1964, the Americans With Disabilities Act, Section 504 of the Rehabilitation Act of 1973, 49 CFR Part 21, 21.5 and 26, or any other applicable federal, state, or local law or regulation regarding non - discrimination. 13. GENERAL PROVISIONS. 13.1 Interpretation and Modification. This Agreement, together with any attached Exhibits, contains all of the agreements of the Parties with respect to any matter covered or mentioned in this Agreement and no prior statements or agreements, whether oral or written, shall be effective for any purpose. Should any language in any Exhibits to this Agreement conflict with any language in this Agreement, the terms of this Agreement shall prevail. The respective captions of the Sections of this Agreement are inserted for convenience of reference only and shall not be deemed to modify or otherwise affect any of the provisions of this Agreement. Any provision of this Agreement that is declared invalid, inoperative, null and void, or illegal shall in no way affect or invalidate any other provision hereof and such other provisions shall remain in full force and effect. Any act done by either Parry prior to the effective date of the Agreement that is consistent with the authority of the Agreement and compliant with the terms of the Agreement, is hereby ratified as having been performed under the Agreement. No provision of this Agreement, including this provision, may be amended, waived, or modified except by written agreement signed by duly authorized representatives of the Parties. 13.2 Assignment and Beneficiaries. Neither the Contractor nor the City shall have the right to transfer or assign, in whole or in part, any or all of its obligations and rights hereunder without the prior written consent of the other Parry. If the non - assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. Subject to the foregoing, the rights and obligations of the Parties shall inure to the benefit of and be binding upon their respective successors in interest, heirs and assigns. This Agreement is made and entered into for the sole protection and benefit of the Parties hereto. No other person or entity shall have any right of action or interest in this Agreement based on any provision set forth herein. 13.3 Compliance with Laws. The Contractor shall comply with and perform the Services in accordance with all applicable federal, state, local, and city laws including, without limitation, all City codes, ordinances, resolutions, regulations, rules, standards and policies, as now existing or hereafter amended, adopted, or made effective. If a violation of the City's Ethics Resolution No. 91 -54, as amended, occurs as a result of the formation or performance of this Agreement, this Agreement may be rendered null and void, at the City's option. 13.4 Enforcement. Time is of the essence of this Agreement and each and all of its provisions in which performance is a factor. Adherence to completion dates set forth in the description of the Services is essential to the Contractor's performance of this Agreement. Any notices required to be given by the Parties shall be delivered at the addresses set forth at the beginning of this Agreement. Any notices may be delivered personally to the addressee of the notice or may be deposited in the United States mail, postage prepaid, to the address set forth above. Any notice so posted in the United States mail shall be deemed received three (3) days after the date of mailing. Any remedies provided for under the terms of this Agreement are not intended to be exclusive, but shall be cumulative with all other remedies available to the City at law, in equity or by statute. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option PW MAINTENANCE AGREEMENT - 7 - Rev. 6/2012 conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. Failure or delay of the City to declare any breach or default immediately upon occurrence shall not waive such breach or default. Failure of the City to declare one breach or default does not act as a waiver of the City's right to declare another breach or default. This Agreement shall be made in, governed by, and interpreted in accordance with the laws of the State of Washington. If the Parties are unable to settle any dispute, difference or claim arising from this Agreement, the exclusive means of resolving that dispute, difference, or claim, shall be by filing suit under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative process. If the King County Superior Court does not have jurisdiction over such a suit, then suit maybe filed in any other appropriate court in King County, Washington. Each party consents to the personal jurisdiction of the state and federal courts in King County, Washington and waives any objection that such courts are an inconvenient forum. If either Party brings any claim or lawsuit arising from this Agreement, each Parry shall pay all its legal costs and attorney's fees and expenses incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, however nothing in this paragraph shall be construed to limit the Parties' rights to indemnification under Section 5 of this Agreement. 13.5 Execution. Each individual executing this Agreement on behalf of the City and Contractor represents and warrants that such individual is duly authorized to execute and deliver this Agreement. This Agreement may be executed in any number of counterparts, each of which shall be deemed an original and with the same effect as if all Parties hereto had signed the same document. All such counterparts shall be construed together and shall constitute one instrument, but in making proof hereof it shall only be necessary to produce one such counterpart. The signature and acknowledgment pages from such counterparts may be assembled together to form a single instrument comprised of all pages of this Agreement and a complete set of all signature and acknowledgment pages. The date upon which the last of all of the Parties have executed a counterpart of this Agreement shall be the "date of mutual execution" hereof. [Signature page follows] PW MAINTENANCE AGREEMENT - 8 - Rev. 6/2012 CITY ,or- CITY HALL Federal Way 33325 8th Avenue South Federal Way, WA 98003 -6325 (253) 835 -7000 vvns'Ce aftedeta4vaycom conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. Failure or delay of the City to declare any breach or default immediately upon occurrence shall not waive such breach or default. Failure of the City to declare one breach or default does not act as a waiver of the City's right to declare another breach or default. This Agreement shall be made in, governed by, and interpreted in accordance with the laws of the State of Washington. If the Parties are unable to settle any dispute, difference or claim arising from this Agreement, the exclusive means of resolving that dispute, difference, or claim, shall be by filing suit under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative process. If the King County Superior Court does not have jurisdiction over such a suit, then suit maybe filed in any other appropriate court in King County, Washington. Each party consents to the personal jurisdiction of the state and federal courts in King County, Washington and waives any objection that such courts are an inconvenient forum. If either Party brings any claim or lawsuit arising from this Agreement, each Parry shall pay all its legal costs and attorney's fees and expenses incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, however nothing in this paragraph shall be construed to limit the Parties' rights to indemnification under Section 5 of this Agreement. 13.5 Execution. Each individual executing this Agreement on behalf of the City and Contractor represents and warrants that such individual is duly authorized to execute and deliver this Agreement. This Agreement may be executed in any number of counterparts, each of which shall be deemed an original and with the same effect as if all Parties hereto had signed the same document. All such counterparts shall be construed together and shall constitute one instrument, but in making proof hereof it shall only be necessary to produce one such counterpart. The signature and acknowledgment pages from such counterparts may be assembled together to form a single instrument comprised of all pages of this Agreement and a complete set of all signature and acknowledgment pages. The date upon which the last of all of the Parties have executed a counterpart of this Agreement shall be the "date of mutual execution" hereof. [Signature page follows] PW MAINTENANCE AGREEMENT - 8 - Rev. 6/2012 , CITY Of CITY HALL Sth ✓�r 33325 8th Avenue South Federal Way, WA 98003 -6325 (253) 835 -7000 IN WITNESS, the Parties execute this Agreement below, effective the last date written below. CITY FEDERAL WAY ATTEST: B Y M an Salloum, P.E. Public Works Director & t Jerk DATE: Of 2 7 2.p 1 q EARTHCORPS By: Steve Dubiel, Executive Director DATE: Lf STATE OF WASHINGTON ) APPROVED AS TO FORM: Vie. U, l for City Attorney, Amy Jo Pearsall ss. COUNTY OF t ) On this day personally appeared before me Steve Dubiel, to me known to be the Executive Director of EarthCorps that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he /she was authorized to execute said instrument and that the seal affixed, if any, is the corporate seal of said corporation. GIVEN my hand and official seal this day of 5e Y v , 201A. �♦,����I�N� Notary's signature IAO/P,RW X Notary's printed name � Notary Public in and for the Sta e of Washington. My commission expires 6 p1 I • kOF WSJ," PW MAINTENANCE AGREEMENT - 9 - Rev. 6/2012 v. w w. aft 6 40 t .. • CITY Of CITY HALL 33325 8th Avenue South Federal Federal Way, WA 98003 -6325 fr ..rte. ^ �t53) 835 -7000 mvtv c l,: ,offedea a &vay co:Fn EXHIBIT "A" SERVICES Scope of work: EarthCorps will complete priority invasive species control, trash and debris clean -up and selected blackberry removal activities on two City of Federal Way owned properties identified in the attached reference document titled "2014 Maintenance Priorities." The properties are referred to as the Spring Valley Open Space and Bridges Property and were acquired in partnership with King County Conservation Futures to become conservation areas. The 2014 Maintenance Priorities identified are the result of observations by EarthCorps ecologists during a rapid ecological assessment in the fall of 2013. Invasive species control activities include: Noxious weed control of Japanese knotweed and Purple loosestrife found during rapid ecological assessment fieldwork. Japanese knotweed will be treated through stem injection with herbicide Purple loosestrife will be treated with manual removal and /or targeted herbicide applications Trash and debris clean -up activities include: Removal of trash and debris on the north section of the Spring Valley Wetlands along the North Fork of West Hylebos Creek (City to arrange for debris disposal) Wooden structure mitigation to remove all metal and plastic in the structure and leave the wood to decompose in place Selected blackberry removal activities include: • Blackberry bush removal from the Bridges Property • Sheet mulch disturbed soils (mulch to be provided by the City) PW MAINTENANCE AGREEMENT _10- Rev. 6/2012 CITY OF x Federal Way EXHIBIT "B" COMPENSATION CITY HALL 33325 8th Avenue South Federal Way, VVA 98003 -6325 (253) 8135 -7000 svwEk citycffed rttwklycom 1. Total Compensation: In return for the Services, the City shall pay the Contractor a total amount not to exceed four thousand, eight hundred twenty -nine and 00 /100 Dollars ($4,829.00) 2. Method of Compensation: Hourly/Daily rate: In consideration of the Contractor performing the Services, the City agrees to pay the Contractor the amounts calculated on the basis of the hourly and daily labor rate schedule for Contractor's personnel as shown below: PW MAINTENANCE AGREEMENT - 11 - Rev. 6/2012 Project Field Tasks & Subtasks Management Technician Hourly Rates $ 75.00 $ 30.00 Hours Fee Invasive species control 8 ! 8 16 $ 840 r Rags 1,I �? Days r ✓ 2 clebns '�.y 5 } d� / $ 2,380 r...,n. Sele to ; :tilioy 041., $ 1,190 Task Total Hours 8 ' 8' " rQJJa rf ,sir by %r/ rrrr/�j rro i3rirrr ' • '. 5 Task Cost $ 600.00 1 $ 240.00 1 $3,570.00 1 $ 4,410 9.5% Sales Tax $ 419 Total Cost $ 4,829 PW MAINTENANCE AGREEMENT - 11 - Rev. 6/2012 Eart102 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONVERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGRATION IS WAIVED, subject to the terms and conditions of the policy, certain coverage may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). Canfield 451 Diamond Drive Ephrata, WA 98823 Earthcorps 6310 NE 74th Street, Suite 201 E Seattle, WA 98115 American Alternative Insurance Corporation AUTOMOBILE LIABILITY American Alternative Insurance Corporation PROPERTY American Alternative Insurance Corporation RSUI Group, Inc. MISCELLANEOUS PROFESSIONAL LIABILITY THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE COVERAGE PERIOD INDICATED, NOT WITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. COMMERCIAL GENERAL LIABILITY N1- A2 -RL- 0000013 -06 06/01/2014 06/01/2015 PER OCCURRENCE 351000,UuU OCCURRENCE FORM PER MEMBER AGGREGATE $10,000,000 INCLUDES STOP GAP PRODUCT- COMP /OP $5,000,000 PROPERTY IS SUBJECT TO A $50,000 SIR PAYABLE FROM PROGRAM FUNDS PERSONAL & ADV. INJURY $5,000,000 LIABILITY IS SUBJECT TO A $50,000 SIR PAYABLE FROM PROGRAM FUNDS ANNUAL POOL AGGREGATE $50,000,000 .. AUTONIQBILE LIABILITY ... ... ..... ... .. ANY AUTO N1- A2 -RL- 0000013 -06 06/0112014 06/01/2015 COMBINED SINGLE LIMIT $5,000,000 (LIABILITY IS SUBJECT TO A $50.000 SIR PAYABLE FROM PROGRAM FUNDS) ANNUAL POOL AGGREGATE NONE N1- A2 -RL- 0000013 -06 06/01/2014 06/01/2015 ALL RISK PER OCC EXCL EQ & FL $55,000,000 EARTHQUAKE PER OCC $1,000,000 FLOOD PER OCC $1,000,000 PROPERTY IS SUBJECT TO A $50,000 SIR PAYABLE FROM PROGRAM FUNDS ANNUAL POOL AGGREGATE NONE MISCELLANEOUS. P%E)f5S1i�NAf,1.fAtlLftY .. 06/01/2014 06/01/2015 PER CLAIM (LIABILITY IS SUBJECT TO A SIR PAYABLE FROM PROGRAM FUNDS) ANNUAL POOL AGGREGATE Regarding habitat management and clean up contract for the Spring Valley area of Federal Way and north fork of West Hylebos Creek. City of Federal Way is named as Additional Insured regarding contract services provided only and is subject to poilcy terms, conditions and exclusions. CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE SWM Engineeer - Tony Doucette, PE City of Federal Way 33325 8th Avenue South Federal Way, WA 98003 2866039 AMERICAN ALTERNATIVE INSURANCE COMPANY ADDITIONAL INSURED — DESIGNATED PERSON OR ORGANIZATION (GENERAL LIABILITY) Named Insured Non Profit Insurance Program NPIP Policy Number Endorsement Effective N1- A2 -RL- 0000013- 06 06/01/2014 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY This endorsement modifies insurance provided under the following: GENERAL LIABILITY COVERAGE PART This endorsement changes the policy effective on the inception date of the policy unless another date is indicated above. Schedule Person or Organization (Additional Insured): As Per Schedule on file with Canfield, Underwriting Administrator SWM Engineeer - Tony Doucette, PE City of Federal Way 33325 8th Avenue South Federal Way, WA 98003 Regarding habitat management and clean up contract for the Spring Valley area of Federal Way and north fork of West Hylebos Creek. City of Federal Way is named as Additional Insured regarding contract services provided only and is subject to poilcy terms, conditions and exclusions. A. With respects to the General Liability Coverage Part only, the definition of Insured in the Liability Conditions, Definitions and Exclusions section of this policy is amended to include as an Insured the Person or Organization shown in the above Schedule. Such Person or Organization is an Insured only with respect to liability for Bodily Injury, Property Damage, or Personal and Advertising Injury caused in whole or in part by your acts or omissions or the acts or omissions of those acting on your behalf: 1. In performance of your ongoing operations; or 2. In connection with your premises owned or rented to you. B. The Limits of Insurance applicable to the additional Insured are those specified in either the: 1. Written contract or written agreement; or 2. Declarations for this policy, whichever is less. These Limits of Insurance are inclusive and not in addition to the Limits Of Insurance shown in the Declarations. All other terms and conditions remain unchanged. Includes copyrighted material of the Insurance Services Office, Inc., with its permission. RL 2163 12/12 Page 1 of 1 2866040 Page 1 of 17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360 - 902 -5335 PO Box 44540, Olympia, WA 98504 -4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 8/22/2014 County ^Trade Job Classification Wa a Holiday Overtime Note JKing Asbestos Abatement Workers Journey Level $41.69 5D 1H lKing Boilermakers Journey Level $64.44 5N 1C #King Brick Mason Brick And Block Finisher $43.26 5A 1M King Brick Mason Journey Level $50.12 5A 1M King Brick Mason Pointer Caulker Cleaner $50.12 5A 1M ;King Building Service Employees Janitor $20.59 5S 2F King Building Service Employees Traveling Waxer /Shampooer $21.00 5S 2F ;King Building Service Employees Window Cleaner (Non- Scaffold) $24.29 5S 2F 'lKing Building Service Employees Window Cleaner (Scaffold) $25.15 5S 2F i (King Cabinet Makers (In Shop) Journey Level $22.74 1 ;King Carpenters Acoustical Worker $50.82 5D 1M ;King Carpenters Bridge, Dock And Wharf Carpenters $50.82 5D 1M IKing Carpenters Carpenter $50.82 5D 1M King Carpenters Carpenters on Stationary Tools $50.95 5D 1M King Carpenters Creosoted Material $50.92 5D 1M ;King Carpenters Floor Finisher $50.82 5D 1M ;King Carpenters Floor Layer $50.82 5D 1M SKing Carpenters Scaffold Erector $50.82 5D 1M 3King Cement Masons Journey Level $51.18 7A 1M King Divers Et Tenders Diver $105.371 5D 1M 8A King Divers Et Tenders Diver On Standby $59.50 5D 1M King Divers Et Tenders Diver Tender $54.82 5D 1M King Divers Et Tenders Surface Rcv Et Rov Operator $54.82 5D 1M King Divers Et Tenders Surface Rcv Et Rov Operator Tender $51.07 5A 1B King Dredge Workers Assistant Engineer $53.00 5D 3F King Dredge Workers Assistant Mate (Deckhand) $52.58 5D 3F https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 2 of 17 King Dredge Workers Boatmen $52.30 5D 3F King Dredge Workers Engineer Welder $54.04 5D 3F King Dredge Workers Leverman, Hydraulic $55.17 5D 3F King Dredge Workers Mates $52.30 5D 3F ?King Dredge Workers Oiler $52.58 5D 3F King Dry wall Applicator Journey Level $50.82 5D 1 H King Drywall Tapers Journey Level $50.87 5P 1E ;King Electrical Fixture Maintenance Journey Level $25.84 5L 1E Workers ;King Electricians - Inside Cable Splicer $65.69 7C 2W King Electricians - Inside Cable Splicer (tunnel) $70.52 7C 2W King Electricians - Inside Certified Welder $63.49 7C 2W King Electricians - Inside Certified Welder (tunnel) $68.10 7C 2W 'King Electricians - Inside Construction Stock Person $35.69 7C 2W King Electricians - Inside Journey Level $61.30 7C 2W King Electricians - Inside Journey Level (tunnel) $65.69 7C 2W F. Electricians - Motor Shop Craftsman $15.37 1 King Electricians Motor Shop Journey Level $14.69 1 King Electricians - Powerline Construction Cable Splicer $68.33 5A 4A King g Electricians - Powerline Construction Certified Line Welder $62.50 5A 4A King Electricians - Powerline Construction Groundperson $42.56 5A 4A ,King I Electricians - Powerline Construction Heavy Line Equipment Operator $62.50 5A 4A King Electricians - Powerline Construction Journey Level Lineperson $62.50 5A - 4A - i i King Electricians - Powerline Construction Line Equipment Operator $52.47 5A 4A s °King Electricians - Powerline Construction Pole Sprayer $62.50 5A 4A King Electricians - Powerline Construction Powderperson $46.55 5A 4A 3 King Electronic Technicians Journey Level $31.00 1 i <King Elevator Constructors Mechanic $80.14 7D 4A ;King Elevator Constructors Mechanic In Charge $86.77 7D 4A 'King Fabricated Precast Concrete All Classifications - In- Factory Work Only $15.25 5B 1R Products 'King Fence Erectors Fence Erector $15.18 1 'King Flaggers Journey Level $35.34 7A 31 :King Glaziers Journey Level $53.76 7L 1y King Heat Et Frost Insulators And Journeyman $58.93 5J 1S Asbestos Workers King Heating_ Equipment Mechanics Journey Level $69.37 7F 1E King Hod Carriers Et Mason Tenders Journey Level $42.99 7A 31 'King Industrial Power Vacuum Journey Level $9.32 1 https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 3 of 17 https:H fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Cleaner King Inland Boatmen Boat Operator $54.57 5B 1K King Inland Boatmen Cook $50.95 513 1K King Inland Boatmen Deckhand $51.19 5B 1K 'King Inland Boatmen Deckhand Engineer $52.18 5B 1K ,King Inland Boatmen Launch Operator $53.40 5B 1K King Inland Boatmen Mate $53.40 513 1K King Inspection /Cleaning /Sealing Of Cleaner Operator, Foamer Operator $31.49 1 Sewer Et Water Systems By Remote Control lKing Inspection /Cleaning /Seating Of Grout Truck Operator $11.48 1 Sewer Et Water Systems By Remote Control King 1 Inspection /Cleaning /Sealing Of Head Operator $24.91 1 Sewer Et Water Systems By Remote Control 3King I Inspection /Cleaning /Sealing Of Technician $19.33 1 Sewer Et Water Systems By Remote Control King Inspection /Cleaning /Seating Of Tv Truck Operator $20.45 1 Sewer Et Water Systems By Remote Control 3King Insulation Applicators Journey Level $50.82 5D 1M 3King Ironworkers Journeyman $59.77 7N 10 ;King I Laborers Air, Gas Or Electric Vibrating Screed $41.69 7A 31 ;King Laborers Airtrac Drill Operator $42.99 7A 31 gKing Laborers Ballast Regular Machine $41.69 7A 31 King Laborers Batch Weighman $35.34 7A 31 King Laborers Brick Pavers $41.69 7A 31 'King Laborers Brush Cutter $41.69 7A 31 t =King Laborers Brush Hog Feeder $41.69 7A 31 ;King Laborers Burner $41.69 7A 31 ;King Laborers Caisson Worker $42.99 7A 31 King Laborers Carpenter Tender $41.69 7A 31 1 ;King Laborers Caulker $41.69 7A 31 ;King Laborers Cement Dumper - paving $42.461 7A 31 ;King Laborers Cement Finisher Tender $41.691 7A 31 King Laborers Change House Or Dry Shack $41.69 7A 31 `King Laborers Chipping Gun (under 30 Lbs.) $41.69 7A 31 King Laborers Chipping Gun(30 Lbs. And Over) $42.46 7A 31 ;King Laborers Choker Setter $41.69 7A 31 King Laborers Chuck Tender $41.69 7A 31 King Laborers Clary Power Spreader $42.46 7A 31 King Laborers Clean -up Laborer $41.69 7A 31 ;King Laborers Concrete Dumper /chute $42.46 7A 31 https:H fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 4 of 17 3 I Operator I k 1 King Laborers Concrete Form Stripper $41.69 7A 31 ;King Laborers Concrete Placement Crew $42.46 7A 31 King Laborers Concrete Saw Operator /core Driller $42.46 7A 31 1 King Laborers Crusher Feeder $35.341 7A 31 ;King Laborers Curing Laborer $41.69 7A 31 King Laborers Demolition: Wrecking £t Moving (incl. Charred Material) $41.69 7A 31 King Laborers Ditch Digger $41.69 7A 31 I King Laborers Diver $42.99 7A 31 King Laborers Drill Operator (hydraulic, diamond) $42.46 7A 31 i ;King Laborers Dry Stack Walls $41.69 7A 31 l King Laborers Dump Person $41.69 7A 31 King Laborers Epoxy Technician $41.69 7A 31 King Laborers Erosion Control Worker $41.69 7A 31 King Laborers Faller £t Bucker Chain Saw $42.46 7A 31 King Laborers Fine Graders $41.69 7A 31 ;King Laborers Firewatch $35.34 7A 31 King Laborers Form Setter $41.69 7A 31 King Laborers Gabian Basket Builders $41.69 7A 31 King Laborers General Laborer $41.69 7A 31 King Laborers Grade Checker 1t Transit Person $42.99 7A 31 IKing Laborers Grinders $41.69 7A 31 IKing Laborers Grout Machine Tender $41.69 7A 31 ;King Laborers Groutmen (pressure)including Post Tension Beams $42.46 7A 31 3King Laborers Guardrail Erector $41.69 7A 31 King Laborers Hazardous Waste Worker (level A) $42.99 7A 31 'King Laborers Hazardous Waste Worker (level $42.46 7A 31 King Laborers Hazardous Waste Worker (level C) $41.69 7A 31 ;King Laborers High Scaler $42.99 7A 31 'King Laborers Jackhammer $42.46 7A 31 'King Laborers Laserbeam Operator $42.46 7A 31 `King Laborers Maintenance Person $41.69 7A 31 King Laborers Manhole Builder - mudman $42.46 7A 31 King Laborers Material Yard Person $41.69 7A 31 King Laborers Motorman -dinky Locomotive $42.46 7A 31 King Laborers Nozzleman (concrete Pump, Green Cutter When Using Combination Of High Pressure Air 8t Water On Concrete £t $42.46 7A 31 https:H fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 5 of 17 ! Rock, Sandblast, Gunite, Shotcrete, Water Bla !King Laborers Pavement Breaker $42.46 7A 31 King Laborers Pilot Car $35.34 7A 31 IKing Laborers Pipe Layer Lead $42.99 7A 31 !King Laborers Pipe Layer /tailor $42.46 7A 31 ;King Laborers Pipe Pot Tender $42.46 7A 31 IKing Laborers Pipe Reliner $42.46 7A 31 !King Laborers Pipe Wrapper $42.46 7A 31 ;King Laborers Pot Tender $41.69 7A 31 King Laborers Powderman $42.99 7A 31 ;King Laborers Powderman's Helper $41.69 7A 31 King Laborers Power Jacks $42.46 7A 31 IKing Laborers Railroad Spike Puller - Power $42.46 7A 31 IKing Laborers Raker - Asphalt $42.99 7A 31 King Laborers Re- timberman $42.99 7A 31 IKing Laborers Remote Equipment Operator $42.46 7A 31 'King Laborers Rigger /signal Person $42.46 7A 31 ; ;King Laborers Rip Rap Person $41.69 7A 31 ;King Laborers Rivet Buster $42.46 7A 31 } King Laborers Rodder $42.46 7A 31 King Laborers Scaffold Erector $41.69 7A 31 1, King Laborers Scale Person $41.69 7A 31 ;King Laborers Sloper (over 20 ") $42.461 7A 31 King Laborers Sloper Sprayer $41.69 7A 31 ;King Laborers Spreader (concrete) $42.46 7A 31 King Laborers Stake Hopper $41.69 7A 31 IKing Laborers Stock Piler $41.69 7A 31 ;King Laborers Tamper Et Similar Electric, Air Et Gas Operated Tools $42.46 7A 31 ;King Laborers Tamper (multiple Et Self- propelled) $42.46 7A 31 'King Laborers Timber Person - Sewer (lagger, Shorer Et Cribber) $42.46 7A 31 King Laborers Toolroom Person (at Jobsite) $41.69 7A 31 King Laborers Topper $41.69 7A 31 King Laborers Track Laborer $41.69 7A 31 'King Laborers Track Liner (power) $42.46 7A 31 King Laborers Traffic Control Laborer $37.79 7A 31 8R King Laborers Traffic Control Supervisor $37.79 7A 31 8R King Laborers Truck Spotter $41.69 7A 31 King Laborers Tugger Operator $42.46 7A 31 King Laborers Tunnel Work- Compressed Air Worker 0 -30 psi $60.06 7A 31 King Laborers Tunnel Work- Compressed Air $65.09 7A 31 8� https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 6 of 17 I Worker 30.01 -44.00 psi King Laborers Tunnel Work- Compressed Air Worker 44.01 -54.00 psi $68.77 7A 31 8g King Laborers Tunnel Work- Compressed Air Worker 54.01 -60.00 psi $74.47 7A 31 8� King Laborers Tunnel Work- Compressed Air Worker 60.01 -64.00 psi $76.59 7A 31 8� King Laborers Tunnel Work- Compressed Air Worker 64.01 -68.00 psi $81.69 7A 31 8S IKing Laborers Tunnel Work- Compressed Air Worker 68.01 -70.00 psi $83.59 7A 31 King Laborers Tunnel Work- Compressed Air Worker 70.01 -72.00 psi $85.59 7A 31 8� King Laborers Tunnel Work- Compressed Air Worker 72.01 -74.00 psi $87.59 7A 31 8� I King 1 Laborers Tunnel Work -Guage and Lock Tender $43.09 7A 31 8� 1 King Laborers Tunnel Work -Miner $43.09 7A 31 8S King Laborers Vibrator $42.46 7A 31 ?King Laborers Vinyl Seamer $41.69 7A 31 1 King Laborers Watchman $32.12 7A 31 King Laborers Welder $42.46 7A 31 ' ;King Laborers Well Point Laborer $42.46 7A 31 King Laborers Window Washer /cleaner $32.12 7A 31 ;King Laborers - Underground Sewer General Laborer Et Topman $41.69 7A 31 Et Water ;King Laborers - Underground Sewer Pipe Layer $42.46 7A 31 } Et Water King Landscape Construction Irrigation Or Lawn Sprinkler Installers $13.56 1 (King Landscape Construction Landscape Equipment Operators Or Truck Drivers $28.17 1 IKing Landscape Construction Landscaping or Planting Laborers $17.87 1 King Lathers Journey Level $50.82 5D 1H `King Marble Setters Journey Level $50.12 5A 1M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $9.78 1 !King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication In Shops Painter $11.10 1 King Metal Fabrication (In Shop) Welder $15.48 1 King Millwright Journey Level $51.92 5D 1M King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 ;King Modular Buildings Plumber $11.56 1 King IModular Buildings Production Worker $9.40 1 https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 7 of 17 3King Modular Buildings Tool Maintenance $11.56 1 1King Modular Buildings Utility Person $11.56 1 £King Modular Buildings Welder $11.56 1 King Painters Journey Level $37.80 6Z 2B 'King Pile Driver Journey Level $51.07 5D 1M King Plasterers Journey Level $49.29 7Q 1R King Playground Et Park Equipment Journey Level $9.32 1 i Installers King Plumbers Et Pipefitters Journey Level $73.69 6Z 1G # King Power Equipment Operators Asphalt Plant Operators $53.49 7A 3C 8P g King Power Equipment Operators Assistant Engineer $50.22 7A 3C 8P King Power Equipment Operators Barrier Machine (zipper) $53.00 7A 3C 8P ;King Power Equipment Operators Batch Plant Operator, Concrete $53.00 7A 3C 8P i King Power Equipment Operators Bobcat $50.22 7A 3C 8P King Power Equipment Operators Brokk - Remote Demolition Equipment $50.22 7A 3C 8P King Power Equipment Operators Brooms $50.22 7A 3C 8P King Power Equipment Operators Bump Cutter $53.00 7A 3C 8P King Power Equipment Operators Cableways $53.49 7A 3C 8P ;King Power Equipment Operators Chipper $53.00 7A 3C 8P King Power Equipment Operators Compressor $50.22 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment Over 42 M $53.49 7A 3C 8P h ;King Power Equipment Operators Concrete Finish Machine -laser Screed $50.22 7A 3C 8P fi King Power Equipment Operators Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure. $52.58 7A 3C 8P 3King Power Equipment Operators Concrete Pump: Truck Mount With Boom Attachment Up To 42m $53.00 7A 3C 8P ;King Power Equipment Operators Conveyors $52.58 7A 3C 8P King Power Equipment Operators Cranes: 20 Tons Through 44 Tons With Attachments $53.00 7A 3C 8P IKing Power Equipment Operators Cranes: 100 Tons Through 199 Tons, Or 150' Of Boom (Including Jib With Attachments) $54.04 7A 3C 8P King Power Equipment Operators Cranes: 200 Tons To 300 Tons, Or 250' Of Boom (including Jib With Attachments) $54.61 7A 3C 8P `King Power Equipment Operators Cranes: 45 Tons Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) $53.49 7A 3C 8P King Power Equipment Operators Cranes: A -frame - 10 Tons And Under $50.22 7A I 3C 8P https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 8 of 17 I King 3 Power Equipment Operators Cranes: Friction 100 Tons Through 199 Tons $54.61 7A 3C 8P ,King Power Equipment Operators Cranes: Friction Over 200 Tons $55.17 7A 3C 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' Of Boom (including Jib With Attachments) $55.17 7A 3C 8P 1King Power Equipment Operators Cranes: Through 19 Tons With Attachments A -frame Over 10 Tons $52.58 7A 3C 8P King Power Equipment Operators Crusher $53.00 7A 3C 8P 'King i Power Equipment Operators Deck Engineer /deck Winches (power) $53.00 7A 3C 8P ;King Power Equipment Operators Derricks, On Building Work $53.49 7A 3C 8P I King Power Equipment Operators Dozers D -9 Et Under $52.58 7A 3C 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck Or Crane Mount $52.58 7A 3C 8P 3King Power Equipment Operators Drilling Machine $53.00 7A 3C 8P King Power Equipment Operators Elevator And Man -lift: Permanent And Shaft Type $50.22 7A 3C 8P King Power Equipment Operators Finishing Machine, Bidwell And Gamaco Et Similar Equipment $53.00 7A 3C 8P King Power Equipment Operators Forklift: 3000 Lbs And Over With Attachments $52.58 7A 3C 8P i King i Power Equipment Operators Forklifts: Under 3000 Lbs. With Attachments $50.22 7A 3C 8P !King Power Equipment Operators Grade Engineer: Using Blue Prints, Cut Sheets, Etc $53.00 7A 3C 8P lKing Power Equipment Operators Gradechecker /stakeman $50.22 7A 3C 8P yKing Power Equipment Operators Guardrail Punch $53.00 7A 3C 8P ;King Power Equipment Operators Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. Et Over $53.49 7A 3C 8P King Power Equipment Operators Hard Tail End Dump Articulating Off -road Equipment Under 45 Yards $53.00 7A 3C 8P King Power Equipment Operators Horizontal /directional Drill Locator $52.58 7A 3C 8P King Power Equipment Operators Horizontal/ directional Drill Operator $53.00 7A 3C 8P King Power Equipment Operators Hydralifts /boom Trucks Over 10 Tons $52.58 7A 3C 8P King Power Equipment Operators Hydralifts /boom Trucks, 10 Tons And Under $50.22 7A 3C 8P King Power Equipment Operators Loader, Overhead 8 Yards. It Over $54.04 7A 3C 8P King Power Equipment Operators Loader, Overhead, 6 Yards. But Not Including 8 Yards $53.49 7A 3C 8P King Power Equipment Operators Loaders, Overhead Under 6 Yards $53.00 7A 3C 8P https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 9 of 17 jKing Power Equipment Operators Loaders, Plant Feed $53.00 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $52.58 7A 3C 8P King Power EguipmenL Operators Locomotives, All $53.00 7A 3C 8P King Power Equipment Operators Material Transfer Device $53.00 7A 3C 8P iKing Power Equipment Operators Mechanics, All (leadmen - $0.50 Per Hour Over Mechanic) $54.04 7A 3C 8P King Power Equipment Operators Motor Patrol Grader - Non- finishing $52.58 7A 3C 8P j King Power Equipment Operators Motor Patrol Graders, Finishing $53.49 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And /or Shield $53.49 7A 3C 8P King Power Equipment Operators Oil Distributors, Blower Distribution it Mulch Seeding Operator $50.22 7A 3C 8P iKing Power Equipment Operators Outside Hoists (elevators And Manlifts), Air Tuggers,strato $52.58 7A 3C 8P ;King i 3, Power Equipment Operators Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $53.00 7A 3C 8P 1 King Power Equipment Operators Overhead, Bridge Type: 100 Tons And Over $54.04 7A 3C 8P jKing Power Equipment Operators Overhead, Bridge Type: 45 Tons Through 99 Tons $53.49 7A 3C 8P King Power Equipment Operators Pavement Breaker $50.22 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane Mount) $53.00 7A 3C 813 ;King Power Equipment Operators Plant Oiler - Asphalt, Crusher $52.58 7A 3C 8P King Power Equipment Operators Posthole Digger, Mechanical $50.22 7A 3C 8P 3 King Power Equipment Operators Power Plant $50.22 7A 3C 8P iKing Power Equipment Operators Pumps - Water $50.22 7A 3C 8P King Power Equipment Operators Quad 9, Hd 41, D10 And Over $53.49 7A 3C 8P King Power Equipment Operators Quick Tower - No Cab, Under 100 Feet In Height Based To Boom $50.22 7A 3C 8P j i 'King Power Equipment Operators Remote Control Operator On Rubber Tired Earth Moving Equipment $53.49 7A 3C 8P ;King Power Equipment Operators Rigger And Bellman $50.22 7A 3C 8P j ;King Power Equipment Operators Rollagon $53.49 7A 3C 8P 'King Power Equipment Operators Roller, Other Than Plant Mix $50.22 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi -lift Materials $52.58 7A 3C 8P King Power Equipment Operators Roto -mill, Roto - grinder $53.00 7A 3C 8P King Power Equipment Operators Saws - Concrete $52.58 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under 45 Yards $53.00 7A 3C 8P King Power Equipment Operators Scrapers - Concrete 8t Carry All $52.58 7A 3C 8P King Power Equipment Operators Scrapers, Self - propelled: 45 $53.49 7A 3C 8P https:H fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 10 of 17 https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Yards And Over ;King Power Equipment Operators Service Engineers - Equipment $52.58 7A 3C 8P g King Power Equipment Operators Shotcrete /gunite Equipment $50.22 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, Tractors Under 15 Metric Tons. $52.58 7A 3C 8P King Power Equipment Operators Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons $53.49 7A 3C 8P King i Power Equipment Operators Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons $53.00 7A 3C 8P !King Power Equipment Operators Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons $54.04 7A 3C 8P King Power Equipment Operators Shovel, Excavator, Backhoes: Over 90 Metric Tons $54.61 7A 3C 8P (King Power Equipment Operators Slipform Pavers $53.49 7A 3C 8P King Power Equipment Operators Spreader, Topsider 8 Screedman $53.49 7A 3C 8P i King Power Equipment Operators Subgrader Trimmer $53.00 7A 3C 8P i King Power Equipment Operators Tower Bucket Elevators $52.58 7A 3C 8P King y Power Equipment Operators Tower Crane Over 175'in Height, Base To Boom $54.61 7A 3C 8P King Power Equipment Operators Tower Crane Up To 175' In Height Base To Boom $54.04 7A 3C 8P King 3 Power Equipment Operators Transporters, All Track Or Truck Type $53.49 7A 3C 8P 4 ;King Power Equipment Operators Trenching Machines $52.58 7A 3C 8P ;King 3 Power Equipment Operators Truck Crane Oiler /driver - 100 Tons And Over $53.00 7A 3C 8P King Power Equipment Operators Truck Crane Oiler /driver Under 100 Tons $52.58 7A 3C 813 King Power Equipment Operators Truck Mount Portable Conveyor $53.00 7A 3C 8P 1King Power Equipment Operators Welder $53.49 7A 3C 8P = ,King Power Equipment Operators Wheel Tractors, Farmall Type $50.22 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $53.00 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $53.49 7A 3C 8P Underground Sewer $ Water '. King Power Equipment Operators- Assistant Engineer $50.22 7A 3C 8P Underground Sewer $ Water King Power Equipment Operators- Barrier Machine (zipper) $53.00 7A 3C 8P Underground Sewer & Water King Power Equipment Operators- Batch Plant Operator, Concrete $53.00 7A 3C 8P Underground Sewer &t Water King Power Equipment Operators- Bobcat $50.22 7A 3C 8P Underground Sewer 0 Water King Power Equipment Operators- Brokk - Remote Demolition Equipment $50.22 7A 3C 8P Underground Sewer £t Water King Power Equipment Operators- Brooms $50.22 7A 3C 8P Underground Sewer &t Water https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 11 of 17 lKing Power Equipment Operators- Bump Cutter $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cableways $53.49 7A 3C 8P Underground Sewer Et Water lKing Power Equipment Operators- Chipper $53.00 7A 3C 8P Underground Sewer Et Water IKing Power Equipment Operators- Compressor $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount With Boom Attachment Over 42 M $53.49 7A 3C 8P i Underground Sewer Et Water King i Power Equipment Operators- Concrete Finish Machine -laser Screed $50.22 7_A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure. $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount With Boom Attachment Up To 42m $53.00 7A 3C 8P Underground Sewer Et Water lKing Power Equipment Operators- Conveyors $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 Tons With Attachments $53.00 7A 3C 8P l Underground Sewer Et Water King Power Equipment Operators- Cranes: 100 Tons Through 199 Tons, Or 150' Of Boom (Including Jib With Attachments) $54.04 7A 3C 8P Underground Sewer Et Water eKing Power Equipment Operators- Cranes: 200 Tons To 300 Tons, Or 250' Of Boom (including Jib With Attachments) $54.61 7A 3C 8P i Underground Sewer Et Water King Power Equipment Operators- Cranes: 45 Tons Through 99 Tons, Under 150' Of Boom (including Jib With Attachments) $53.49 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Cranes: A -frame - 10 Tons And Under $50.22 7A 3C 8P i Underground Sewer Et Water King Power Equipment Operators- Cranes: Friction 100 Tons Through 199 Tons $54.61 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Friction Over 200 Tons $55.17 7A 3C 8P Underground Sewer Et Water SKing Power Equipment Operators- Cranes: Over 300 Tons Or 300' Of Boom (including Jib With Attachments) $55.17 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Through 19 Tons With Attachments A -frame Over 10 Tons $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Crusher $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer /deck Winches (power) $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Derricks, On Building Work $53.49 7A 3C 8P https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 12 of 17 https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Underground Sewer Et Water €, King Power Equipment Operators- Underground Sewer Et Water Dozers D -9 Et Under $52.58 7A 3C 8P King Power Equipment Operators- Underground Sewer Et Water Drill Oilers: Auger Type, Truck Or Crane Mount $52.58 7A 3C 8P 9King Power Equipment Operators- Drilling Machine $53.00 7A 3C 8P Underground Sewer Et Water 5King Power Equipment Operators- Underground Sewer Et Water Elevator And Man -lift: Permanent And Shaft Type $50.22 7A 3C 8P King Power Equipment Operators- Finishing Machine, Bidwell And Gamaco Et Similar Equipment $53.00 7A 3C 8P i Underground Sewer Et Water King Power Equipment Operators- Forklift: 3000 Lbs And Over With Attachments $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Forklifts: Under 3000 Lbs. With Attachments $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Grade Engineer: Using Blue Prints, Cut Sheets, Etc $53.00 7A 3C 8P Underground Sewer Et Water ?King Power Equipment Operators- Gradechecker /stakeman $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump Articulating Off- Road Equipment 45 Yards. Ft Over $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump Articulating Off -road Equipment Under 45 Yards $53.00 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Horizontal /directional Drill Locator $52.58 7A 3C 8P Underground Sewer Et Water 3 King Power Equipment Operators- Horizontal /directional Drill Operator $53.00 7A 3C 8P Underground Sewer Et Water s. King Power Equipment Operators- Hydralifts /boom Trucks Over 10 Tons $52.58 7A 3C 8P Underground Sewer Et Water <King Power Equipment Operators Hydralifts /boom Trucks, 10 Tons And Under $50.22 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Loader, Overhead 8 Yards. Et Over $54.04 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Loader, Overhead, 6 Yards. But Not Including 8 Yards $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Loaders, Overhead Under 6 Yards $53.00 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Loaders, Plant Feed $53.00 7A 3C 2P Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $52.58 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Locomotives, All $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $54.04 7A 3C 8P https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 13 of 17 https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Underground Sewer Et Water $0.50 Per Hour Over Mechanic) ;King Power Equipment Operators- Motor Patrol Grader - Non- finishing $52.58 7A 3C 8P Underground Sewer Et Water lKing Power Equipment Operators- Motor Patrol Graders, Finishing $53.49 7A 3C 8P Underground Sewer Et Water ?King Power Equipment Operators- Mucking Machine, Mole, Tunnel Drill, Boring, Road Header And /or Shield $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Oil Distributors, Blower Distribution Et Mulch Seeding Operator $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Outside Hoists (elevators And Manlifts), Air Tuggers,strato $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Overhead, Bridge Type Crane: 20 Tons Through 44 Tons $53.00 7A 3C 8P Underground Sewer Et Water lKing Power Equipment Operators- Overhead, Bridge Type: 100 Tons And Over $54.04 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Overhead, Bridge Type: 45 Tons Through 99 Tons $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pavement Breaker $50.22 7A 3C 8P Underground Sewer Et Water lKing Power Equipment Operators- Pile Driver (other Than Crane Mount) $53.00 7A 3C 8P Underground Sewer Et Water jKing Power Equipment Operators- Plant Oiler - Asphalt, Crusher $52.58 7A 3C 8P Underground Sewer 8 Water King Power Equipment Operators- Posthole Digger, Mechanical $50.22 7A 3C 8P i Underground Sewer Et Water 'King Power Equipment Operators- Power Plant $50.22 7A 3C 8P Underground Sewer Et Water !King Power Equipment Operators- Pumps - Water $50.22 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $53.49 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Quick Tower - No Cab, Under 100 Feet In Height Based To Boom $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Remote Control Operator On Rubber Tired Earth Moving Equipment $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rigger And Bellman $50.22 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Rollagon $53.49 7A 3C 8P Underground Sewer Et Water !!King Power Equipment Operators- Roller, Other Than Plant Mix $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi -lift Materials $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roto -mill, Roto- grinder $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $52.58 7A 3C 8P https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 14 of 17 I f Underground Sewer Et Water King Power Equipment Operators- Underground Sewer Et Water Scraper, Self Propelled Under 45 Yards $53.00 7A 3C 8P 'King Power Equipment Operators- Scrapers - Concrete Et Carry All $52.58 7A 3C 813 Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self - propelled: 45 Yards And Over $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Service Engineers - Equipment $52.58 7A 3C 813 Underground Sewer Et Water King Power Equipment Operators- Shotcrete /gunite Equipment $50.22 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, Tractors Under 15 Metric Tons. $52.58 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoe: Over 30 Metric Tons To 50 Metric Tons $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel, Excavator, Backhoes, Tractors: 15 To 30 Metric Tons $53.00 7A 3C 813 Underground Sewer Et Water IKing 3 Power Equipment Operators- Shovel, Excavator, Backhoes: Over 50 Metric Tons To 90 Metric Tons $54.04 7A 3C 8P Underground Sewer Et Water 9King Power Equipment Operators- Shovel, Excavator, Backhoes: Over 90 Metric Tons $54.61 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Slipform Pavers $53.49 7A 3C 813 Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et Screedman $53.49 7A 3C 8P UnderQround Sewer Et Water King Power Equipment Operators- Subgrader Trimmer $53.00 7A 3C 813 Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $52.58 7A 3C 8P f Underground Sewer Et Water ;King Power Equipment Operators- Tower Crane Over 175'in Height, Base To Boom $54.61 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Up To 175' In Height Base To Boom $54.04 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Transporters, All Track Or Truck Type $53.49 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Trenching Machines $52.58 7A 3C 8P UnderQround Sewer Et Water King Power Equipment Operators- Truck Crane Oiler /driver - 100 Tons And Over $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler /driver Under 100 Tons $52.58 7A 3C 8P UnderQround Sewer Et Water King Power Equipment Operators- Truck Mount Portable Conveyor $53.00 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Welder $53.49 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farman Type $50.22 7A 3C 8P Underground Sewer Et Water :King Power Equipment Operators- Yo Yo Pay Dozer $53.00 7A 3C 8P https:H fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 15 of 17 https: // fortress .wa.gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Underground Sewer Et Water King Power Line Clearance Tree Trimmers Journey Level In Charge $44.86 5A 4A King Power Line Clearance Tree Trimmers Spray Person $42.58 5A 4A King Power Line Clearance Tree Trimmers Tree Equipment Operator $44.86 5A 4A ;King Power Line Clearance Tree Trimmers Tree Trimmer $40.08 5A 4A ?King i Power Line Clearance Tree Trimmers Tree Trimmer Groundperson $30.20 5A 4A §King Refrigeration Et Air Conditioning Mechanics Journey Level $72.46 6Z 1G 'King Residential Brick Mason Journey Level $50.12 5A 1M iKing Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 i King Residential Drywall Applicators Journey Level $39.62 5D 1M King Residential Drywall Tapers Journey Level $50.87 5P 1E King Residential Electricians Journey Level $30.44 1 King Residential Glaziers Journey Level $36.20 7L 1H 'King x Residential Insulation Applicators Journey Level $26.28 1 i King Residential Laborers Journey Level $23.03 1 'King Residential Marble Setters Journey Level $24.09 1 ;King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Pipefitters Journey Level $34.69 1 i King Residential Refrigeration Et Air Journey Level $72.46 6Z 1G Conditioning Mechanics King Residential Sheet Metal Workers Journey Level (Field or Shop) $41.84 7F 1R 'King Residential Soft Floor Layers Journey Level $42.15 5A 3D King Residential Sprinkler Fitters Journey Level $42.48 5C 211 (Fire Protection) `King Residential Stone Masons Journey Level $50.12 5A 1M iKing Residential Terrazzo Workers Journey Level $46.96 5A 1M IKing Residential Terrazzo /Tile Journey Level $21.46 1 Finishers ;King Residential Tile Setters Journey Level $25.17 1 ;King Roofers Journey Level $44.71 5A 3H King Roofers Using Irritable Bituminous Materials $47.71 5A 3H King Sheet Metal Workers Journey Level (Field or Shop) $69.37 7F 1 E King Shipbuilding Et Ship Repair Boilermaker $40.12 7M 1H 'King Shipbuilding Et Ship Repair Carpenter $38.24 70 3B King Shipbuilding 4 Ship Repair Electrician $37.80 70 313 King Shipbuilding Et. Ship Repair Heat Et Frost Insulator $58.93 5J 1S https: // fortress .wa.gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 16 of 17 jKing Shipbuilding Et Ship Repair Laborer $36.78 70 3B lKing Shipbuilding &Ship Repair Machinist $37.81 70 3B King Shipbuilding Ship Repair Operator $40.15 70 3B ;King Shipbuilding &Ship Repair Painter $37.79 70 3B IKing Shipbuilding Et Ship Repair Pipefitter $37.77 70 3B 'King Shipbuilding Et Ship Repair Rigger $37.74 70 3B ;King Shipbuilding Et Ship Repair Sandblaster $36.78 70 3B , King Shipbuilding Et Ship Repair Sheet Metal $37.74 70 313 :King Shipbuilding Et Ship Repair Shipfitter $37.74 70 3B King Shipbuilding Et Ship Repair Trucker $37.59 70 3B ;King Shipbuilding Et Ship Repair Warehouse $37.64 70 3B King Shipbuilding Et Ship Repair Welder /Burner $37.74 70 3B King Sign Makers Et Installers (Electrical) Sign Installer $22.92 1 King Sign Makers Et Installers (Electrical) Sign Maker $21.36 1 'King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electrical ;King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Electrical 'King Soft Floor Layers Journey Level $42.15 5A 3D King Solar Controls For Windows Journey Level $12.44 1 i !King Sprinkler Fitters (Fire Protection) Journey Level $69.59 5C 1X King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) ,King Stone Masons Journey Level $50.12 5A 1M ;King Street And Parking Lot Sweeper Workers Journey Level $19.09 1 ;King Surveyors Assistant Construction Site Surveyor $52.58 7A 3C 8P ;King Surveyors Chainman $52.06 7A 3C 8P King Surveyors Construction Site Surveyor $53.49 7A 3C 8P King Telecommunication Technicians Journey Level $22.76 1 ;King Telephone Line Construction - Cable Splicer $36.01 5A 2B Outside King Telephone Line Construction - Hole Digger /Ground Person $20.05 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $34.50 5A 2B Outside ;King Telephone Line Construction - Special Aparatus Installer 1 $36.01 5A 2B Outside 'King Telephone Line Construction - Special Apparatus Installer II $35.27 5A 2B Outside ' King Telephone Line Construction - Telephone Equipment Operator (Heavy) $36.01 5A 2B Outside King iTelephone Line Construction - Telephone Equipment Operator $33.47 5A I 2B https: // fortress. wa. gov/ lni /wagelookup /prvWagelookup.aspx 8/22/2014 Page 17 of 17 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 8/22/2014 Outside (Light) King 3 Telephone Line Construction - Telephone Lineperson $33.47 5A 2B Outside King a Telephone Line Construction - Television Groundperson $19.04 5A 2B Outside King Telephone Line Construction - Television Lineperson /Installer $25.27 5A 2B Outside King i Telephone Line Construction - Television System Technician $30.20 5A 2B Outside jKing Telephone Line Construction - Television Technician $27.09 5A 2B Outside King Telephone Line Construction - Tree Trimmer $33.47 5A 2B Outside jKing Terrazzo Workers Journey Level $46.96 5A 1M ,King Tile Setters Journey Level $21.65 1 ;King Tile, Marble Ft Terrazzo Finishers Finisher $37.79 5A 1B King Traffic Control Stripers Journey Level $42.33 7A 1 K jKing Truck Drivers Asphalt Mix Over 16 Yards (W. WA -Joint Council 28) $48.87 5D 3A 8L IKing j Truck Drivers Asphalt Mix To 16 Yards (W. WA -Joint Council 28) $48.03 5D 3A 81- i 4 King Truck Drivers Dump Truck 8t Trailer $48.87 5D 3A 8L ,King 1 Truck Drivers Dump Truck (W. WA -Joint Council 28) $48.03 5D 3A 8L l King f Truck Drivers Other Trucks (W. WA -Joint Council 28) $48.87 5D 3A 8L 'King Truck Drivers Transit Mixer $43.23 1 j King Well Drillers E Irrigation Pump Irrigation Pump Installer $17.71 1 j Installers ;King Well Drillers Et Irrigation Pump Oiler $12.97 1 Installers 'King Well Drillers EL Irrigation Pump Well Driller $18.00 1 Installers https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 8/22/2014