Loading...
RES 16-706 - Adopting Revised TIP for 2017-22RESOLUTION NO. 16 -706 A RESOLUTION of the City Council of the City of Federal Way, Washington, adopting an extended and revised Transportation Improvement Program and Arterial Street Improvement Plan for 2017- 22, and directing the same to be filed with the Washington State Secretary of Transportation and the Transportation Improvement Board. (Amending Resolution Nos. 91 -67, 92 -117, 93 -155, 94 -186, 95- 210, 96 -236, 97 -258, 98 -273, 99 -299, 00 -316, 01 -343, 02 -365, 03 -391, 04- 433, 05 -451, 06 -481, 07 -503, 08 -732, 09- 550,10- 558,11- 609,12- 622,13- 640, 14 -666, and 15 -692). WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the Federal Way City Council adopted an original Transportation Improvement Program ( "TIP ") on July 23,1991 (Resolution No. 91 -67); and WHEREAS, the Federal Way City Council updated a TIP annually thereafter; and WHEREAS, the Federal Way City Council held a public hearing on the revised TIP on June 21, 2016, in compliance with the requirements of State laws; and WHEREAS, the City Council has determined current and future City street and arterial needs, and based upon these findings has prepared a revised and extended TIP and an Arterial Street Improvement Plan ( "ASIP ") for the ensuing six calendar years; and WHEREAS, pursuant to Chapters 35.77 and 47.26 RCW, the City Council is required annually to revise and adopt an extended TIP and ASIP; and WHEREAS, the City's SEPA Responsible Official has adopted the Determination of Non- Significance ( "DNS "), Federal Way File 16- 101835- 00 -SE, issued for the City's 2017 -22 TIP and ASIP, which includes the extended and revised projects contained in the TIP adopted herein; and Resolution No. 16 -706 Page 1 of 3 WHEREAS, adoption of the City's 2017 -22 TIP and ASIP DNS reflects the fact that there will be no significant adverse environmental impacts as a result of adoption or implementation of the extended and revised TIP and ASIP adopted herein; NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, RESOLVES AS FOLLOWS: Section 1. Program Adopted. The extended and revised Transportation Improvement Program and Arterial Street Improvement Plan for the City of Federal Way, a copy of which is attached hereto as Exhibit A and incorporated herein by this reference, which sets forth the City's transportation project locations, types of improvements, and the estimated costs thereof, is hereby approved and adopted for the ensuing six (6) calendar years (2017 -22 inclusive). Section 2. Filing nl' Program. Pursuant to Chapter 35.77 RCW, the City Clerk is hereby authorized and directed to file a copy of this Resolution, together with Exhibit A, with the Washington State Secretary of Transportation and the Washington State Transportation Improvement Board. Section 3. Severabil ity. If any section, sentence, clause or phrase of this resolution should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase of this resolution. Section 4. Convctions. The City Clerk and the codifiers of this resolution are authorized to make necessary corrections to this resolution including, but not limited to, the correction of Resolution No. 16 -706 Page 2 of 3 scrivener /clerical errors, references, resolution numbering, section/subsection numbers and any references thereto. Section 5. Ratification. Any act consistent with the authority and prior to the effective date of this resolution is hereby ratified and affirmed. Section 6. Effective Date. This resolution shall be effective immediately upon passage by the Federal Way City Council. RESOLVED BY THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, WASHINGTON this 21 st day of June, 2016. CITY OF FEDERAL WAY d" --� Z�/61Z, FERRELL ATTEST: VY'h,1...RK, STEPHAN , 'OURTNEY, CMC APPROVED AS TO FORM: aNq /0 Gr'M tv CITY A NEY, AMY JO PEARSALL FILED WITH THE CITY CLERK: 06/17/2016 PASSED BY THE CITY COUNCIL: 06/21/2016 RESOLUTION NO.: 16 -706 Resolution No. 16 -706 Page 3 of 3 EXHIBIT A CITY OF FEDERAL WAY TRANSPORTATION IMPROVEMENT PLAN (TIP) - 2017 TO 2022 I Map ROADWAY CAPITAL PROJECTS Year 2016 Costs in $ thousands ID "* Location Description Previous Years 2016 2017 2018 2019 2020 2021 2022 Total 1a City Center Access Phase 1 - Environmental Update environmental documentation for modified access at S 320th St & S 324th St 2,500 2,500 1b City Center Access Phase 2 - S 320th St @ 1 -5 Bridge Add HOV lanes on S 320th St, realign ramps in SE quadrant 5,612 2,12.3 62,187 62,187 132,109 2 10th Ave SW @ SW Campus Dr Add SB right -turn lane 145 1,084 1,229 3 SW 344th St: 12th Ave SW - 21st Ave SW Extend 3 lane principal collector with bike lanes, sidewalks, illumination 2,884 7,280 10,164 4 1st Ave S @ S 328th St Install raised median, improve access at 328th 210 1_,687 1 1,897 5 SR 99 @ S 312th St Add 2nd left -turn lane NB 1,500 605 4,603 6,708 6 S 304th St @ 28th Ave S Add NB right -turn lane, signal 292 2,079 2,371 7 S 352nd St: SR 99 - SR 161 Extend 3 lane principal collector and signal at SR -99 1,499 4,120 5,619 8 SW 320th St @ 21st Ave SW Add 2nd WB left -turn lane, Interconnect to 26th Ave SW 1,740 4,429 6,169 9 SW 320th St @ 47th Ave SW Install traffic signal 569 569 10 S 312th St a) 28th Ave S Add SB right -turn lane 771 771 11 SW 336th Wy / SW 340th St: 26th PI SW - Hoyt Rd Widen to 5 lanes, add signal at 26th PI SW 210 2,627 9,597 9,597 22,031 12 S 356th St: SR 99 - SR 161 Widen to 5 lanes, bike lanes, sidewalks, illumination 350 200 5,562 6,112 13 S 356th St @! SR 161 Add 2nd NB Left to SR 161 - support phase of Triangle Project 820 3,280 4,100 14 S 320th St & 1 st Ave South Add EBL, WBL, WBR, NBT, SBR; widen to 5 lanes N to 316 or Alternatlive Measure 569 9,891 10,460 15 S 344th Wy & Weyerhaeuser Wy S Roundabout 313 1,450 1,763 16 SR 99 HOV Lanes Phase 5: S 340th St - S 356th St Add HOV lanes, install raised median; roundabout at 340th St, turn lanes at 348th 2,000 2,680 6,460 6,460 17,600 17 Citywide Traffic signal modifications - Flashing Yellow Arrow retrofits 165 749 914 18 S 288th St: Military Rd S - 1 -5 Overlay 637 637 19 S 324th St: SR 99 - S 322nd St Overlay 871 871 20 16th Ave S: S 344th St - S 348th St Add SB auxiliary lane 1 1 400 1,6001 4,1051 6,105 21 Citywide Implement Adaptive Traffic Control System 1 200 400 400 1 1,000 Subtotal Roadway Capital Projects 7,051 il,6151 12,432 9,360 14,253 18,049 87,584111 81,455 241,699 I i i Map NON - MOTORIZED CAPITAL PROJECTS Year 2016 Costs in $ thousands ID Location Description Previous Years 2,016 2,017 2,018 2,019 2,020 2,021 2,022 Total 22 21 st Ave S: S 314th St - S 316th St Pedestrian Connection 300 500 2,000 2,800 23 8th Ave S: S 312th St - S 315th St Install sidewalk on west side 100 400 500 24 S 314th St: 20th Ave S - 23rd Ave S Install sidewalks, ADA ramps, curbs & gutter, pedestrian improvements 175' 1,485 1,685 3,345 25 1 st Ave S: S 292nd St - S 312th St Shoulder improvements 3,770 3,770 26 S 336th St: SR 99 - 20th Ave S Install sidewalk on north side 639 639 27 21 st Ave S: S 316th St - S 320th St Install sidewalk on west side 472 884 1,356 28 SR 509: 11th PI S - 16th Ave S Install sidewalk on south side 200 1,300 1,500 29 Citywide Pedestrian Safety Install mid -block crossing treatments 320 320 640 30 20th Ave S & S 316th St Install sidewalk and streetlights on east and south sides 95 300 395 31 SR 509: SW 312th St - 21st Ave SW Install sidewalk and streetlights on south side 200 1,300 1,500 32 26th Ave SW: SW 327th St - SW 330th St Install sidewalk and streetlights on west side 100 5001 1 600 33 S 312th St: 24th Ave S - Steel Lake Park I Install sidewalk and streetlights on south side 1001 600 700 34 S 312th St: Steel Lake Park - 28th Ave S Install sidewalk and streetlights on south side 100 650 750 Subtotal Non - Motorized Capital Projects 1,262 2,020 1,000 3,334 639 1,485 1,685 3,770 15,195 TOTAL CAPITAL PROJECT COSTS 1 8,313 13,535 13,4321 12,694 14,8921 19,5341 89,269 85,225 256,894 FINAL adopted 06/21/2016 by Resolution #16 -706 .... _.... _._ - ____ .. ............... .. _ ........ ..... i 11M Pitget SO ind 011mas Bov 10 0 NO 8_110 E PK ST Poverl I flal, Ifirror Lake M"* a V_ W C! isOS UHF (Pq 23 h (991 City of Federal Way S/i ' I' Easley kLake 1114" 199, cv U I<L 5 !7�_ 2017-2022 S 2 th ST Transportation t50 Improvement Plan Dollol Lake to UJI U) N, Legend Intersection Improvement Corridor Improvement Non-Motorized Improvement Overlay Improvement Map Date: June, 2016 City of Federal Way, 33325 8th Ave S, Federal Way, WA 98003 (253) 835-7000 0 0.5 1 IN Miles CITY OF Federal Way This map is accompanied by no warranties, and is simply a graphic representation. -Y 18 Lake 181 Gei7eva LU _j _j Fivc Lake Trold Lake EF Legend Intersection Improvement Corridor Improvement Non-Motorized Improvement Overlay Improvement Map Date: June, 2016 City of Federal Way, 33325 8th Ave S, Federal Way, WA 98003 (253) 835-7000 0 0.5 1 IN Miles CITY OF Federal Way This map is accompanied by no warranties, and is simply a graphic representation.