Loading...
12-1021219 City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835 -2607 Fax: (253) 835 -2609 FILE 0 Mechanical Permit #: 12- 102121 -00 -ME Inspection Request Line: (253) 835 -3050 Project Name: HATFIELD 7 Project Address: 2900 SW 323RD ST Parcel Number. 873190 0440 Project Description: Replace existing gas furnace, like -in -kind Owner ApRlican Contractor JAMES HATFIELD CELESTE DUFF ALL SEASONS INC (GENERAL) POLINA HATFIELD ALL SEASONS INC ALLSEI *03055 (12/17/13) 2900 SW 323RD ST 4851 S WASHINGTON ST 4851 S WASHINGTON ST FEDERAL WAY WA 98023 -2523 TACOMA WA 98409 TACOMA WA 98407 Additional Permit Information Mechanical Valuation ................. ...........................3000 Is this an Online or O.T.C. application ? ................. es Mechanical Fixtures Furnaces .......... ............................... 1 PERMIT EXPIRES Saturday, November 10, 2012 Permit Issued on Monday, May 14, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the us in ordance with the laws, rules and regulations of the State of Washington NE City of Federal Way. Owner or agent: Date: Z- THIS CARD IS TO MAIN ON -SITE CITY OF Constraction .In ection Record Federal Way INSPECTION REQUE TS: (253) 835 -3050 PERMIT #: 12- 102121 -00 -ME Address: 2900 SW 323RD ST Project: JAMES HATFIELD FEDERAL WAY, WA 98023 -2523 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El Mechanical Rough -in (4165) Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) Approved By Approved to release test Approved By Date By Date By Date R— I El Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date