Loading...
12-102723e - S City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835 -2607 Fax: (253) 835 -2609 � FILE Project Name: TWIN LAKES CONDOMINIUMS - UNIT 3C Project Address: 31924 45TH PL SW Unit 3C Project Description: Panel Change 0 Elbcte cal Permit #: 12- 102723 -00 -EL Inspection Request Line: (253) 835 -3050 �° 4 63 Parcel Number: 873179 0110 Owner Analiant Contractor DINA C DETORRES JOEY SUYAT ALL WIRE ELECTRIC 31924 45TH PL SW #3C ALL WIRE ELECTRIC ALLWIWE961CK (2/12/14) FEDERAL WAY WA 3034 SW CHARLESTOWN ST 3034 SW CHARLESTOWN 98023 -2191 SEATTLE WA 98126 SEATTLE WA 98126 Additional Permit Information Is Use Educational or Institutional ? .......................No Alt. Serv./Feeder: 0 to 200 amps (F 1 PERMIT EXPIRES Sunday, June 15, 2014 Permit Issued on Friday, June 15, 2012 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: i. F�� ,#I- & #0/1 ox THIS CARD IS TO . MAIN ON -SITE Cl Construction In ection Record Federal Way INSPECTION REQ TS: (253) 835 -3050 PERMIT #: 12- 102723 -00 -EL Address: 31924 45TH PL SW Unit 3C Project: DINA C DETORRES FEDERAL WAY, WA 98023 -2445 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Final - Electrical (4055) Approved Date 0 LIFER Ground (4295) Ditch cover (40 0) By Slab /Concrete Floor (4255) Approved 0 Approved Approved to place concrete By Date By Date By Date Final - Electrical (4055) Approved Date 0 Pool Bonding (4195) Approved By Date Right of Way Approved 0 Feeders /Sub - panels (4045) Approved By Date Final - Electrical (4055) Approved Date 0 Temporary Power (4275) Approved By Date Right of Way Approved 0 Rough Electrical (4225) Approved By Date Service (4235) Approved By Date Right of Way Approved 0 Ceiling Cover (4020) Approved By Date Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date