11-104795w
City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835 -2607 Fax: (253) 835 -2609
r-, 1�-' LT E
' Deiholition
Pert #: 11- 104795 -00 -DE
Inspection Request Line: (253) 835 -3050
Project Name: BIGFOOT JAVA
Project Address: 4627 SW 320TH ST Parcel Number: 142103 9095
Project Description: Demolition of existing espresso building, and removal of debris.
Owner
Applicant
Contractor
BIG FOOT JAVA
MIKE BAILY
GENERATION CONSTRUCTION
402 ELINGSON SUITE 200
LDG ARCHITECTS
GENERCL977MB (8/1/13)
PACIFIC WA 98047
1319 DEXTER AVE W SUITE 245
202 FRONTAGE RD N
SEATTLE WA 98109
PACIFIC WA 98047
Demolition Valuation ................... ..........................2500
PERMIT EXPIRES Sunday, December 1, 2013
Permit Issued on Friday, December 2, 2011
1 hereby certify that t above information is correct and that the construction on the above described property and
the occupancy an a use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent Date: _
FINAIIQ> (Z/1*/11
THIS CARD IS TO REMAIN ON -SITE
�,r„ of THIS
I1 ection Record
Federal Way � INSPECTION REQUESTS: (253) 835 -3050
PERMIT #: 11- 104795 -00 -DE Address: 4627 SW 320TH ST
Project: BIG FOOT JAVA FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
U-1 a.,;ia ;..,.1Ancnv
Approved
By ��� Date
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date
C ffy PERMIT
�
Federal
COMMUNnfYDEVELOPMENT 5ERVIC1Fq�� �
253 -835 -2607• FAX 253 -835 -2609 v ky?XIICATION www.citiioffederalwau.com
_. - /0- _(� qa
SF MF CO ME P DE EN FP
SITE ADD
SUITE /UMT #
PROJECT VALUATION
ZONING
ASSESSOR'S T /PARCEL #
TYPE OF PERMIT
❑ BUILDING ❑ PLUMBING ❑ MECHANICAL
EMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
(Tenant Name /Homeowner Last Name)
PROJECT DESCRIPTION
Detailed description of work to
_
be included on this permit only
PROPERTY OWNER
NAME
T-14 ( f e ^x:— Ltl
PRDIARY PHONE
MAILING ADDRESS
EMAIL
CITY
STATE ZIP
NAME
PHONE
MAnJNG ADDRESS n�
2' �C -JL �jT t">
E -MAD•
CONTRACTOR
CITY ,!,
t'ri,.L.
SjTAT�Ef�,...
my
ZIP 3
C O
FAX
WA STATE CONTRACTOR'S LICENSE #
EXPIRATION DATE
FEDERAL WAY BUSINESS LICENSE !
NAME
"IV_ a__
PHONE
MARM0 ADDRESS ^
E-MAIL 1 ✓t
APPLICANT
CITY
STATE
t
ZIP
( CZ
FAX
PROJECT CONTACT
(The individual to receive and
NAME
1V--2-- _?SA-(
PHONE
MAILING ADDRESS
E-MAIL
respond to all correspondence
concerning this application)
CITY
STATE
ZIP
FAX
ALTERNATE CONTACT NAME:
PHONE
E -MAD.
PROJECT FINANCING
NAME
OWNER - FINANCED
Required value of $5,000 or more
(RCW 19.27.095)
MAILING ADDRESS, CITY, STATE, ZIP
PHONE
I certify under penalty of perjury that I am the property owner or authorised agent of the property owner. I certify that to the best
of my knowledge, the information submittal in support of this permit application Is true and correct, I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
Issuance of this permit es not remove the owner's responsibility for compliance wi th local, state, or federal Laws regulating
construction or enviro a tal laws.
I further agree to o harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation an ewe of such claim), which may be made by any person, including the undersigned, and.111ed against the city,
but only where such arises out AuLthe reliance of the city, including its ojyicers and employees, upon the accuracy of the
information suppli o city as a part of this application.
2r
SIGNATURE: DATE
y�
PRINT NAM`11
Bulletin #100 - January 1. 2011 Pave 1 of 3 k:\Handouts\Permit Annlication
11/29/2011 16:40 253 - 502 -1$4 WATER CITY - TACOMA PAGE 02/02
Nov [y 11 12:330 Mika Bail, 20691293 p,2
., °_ DxraaaMrt�ra' of Cot►nnr��xv Drsv�,or�t,�vx 5cltvrCr�
UTV OF 33325 eAvasue South
2"Ob way FadcrAl Fed el l Q 253.835.2607• F=2 3.835 2009
# �delf�w- a
DEMOLITION PERMIT REQUIREMENTS
A demolrtice permit is required to mmove
Division rA see if the � st► nctvrE or atrlxtut= on a sabject prOpertY Check with 1nm=tal cxceeds thres]20lds that trigger an enviro><,mo��1 view. A,� cn $ie City`s �lttauria�
c issued of an orrvirortmental ch�klivi May rmgaitrmd� whiff will rotul W Levi
be issued. �vonrzieat8l rtv;ew �d ftE Plod before a damoligion permit can
L7 Prior to subrnlittiog a deraouppn >aeraoie, the %X*Mng Rem$ (aa :ePPtieabkj must De a
agen7' (see attached DevvorWora Perfraid Cvrttsct "$t).
il;rted by the rrvapecciyc
1�arrsrf.�lrCM!t.• U( tll t!' IU: ltattt �OZrCD1f7MCMQtOpd .trrv�CL�CAnfiM1><iC' ���Jq(+eoAfe, o. fn r.
•itcrns be! c ro b�3l�Ged
—, ut�d �y th® ►rr/SOOn �� o +xy � ;e+ttarl+et. xcuance V rile *Avatluanperr a 4119Wica6k
2. (+HAAS SUP?[Y o
(Gas to De shut 0, MWr ranx,,gd and final td oalq)
('a^ remove 'r tank W be drelned ant? 640),
(KI^, rmllvnmenrel Services}
A an"T•f-.. -- - -__
5. GAINAGE
(All h0u9atrplr oerbage yISpMa' oft and final bill f*d)
d cotnplekd Commiction romit opikatfom farm
7. FUEL STaMME TANKS
(Above or below 9r0de W tanks, have bean purn h ovW
under P►re DtPW tent permit prior to any di
n)
(Wulh long pre and R k5e-)
8•MQW oo be ro w�W and fIn A (Check appticable box)
moved and Gnat utU blrl Para
rem nd P►Oe Md 01 yy.t„ a a.�rt�.wtr, hN A wt
7 _ ra
2, / i`ra.rer...r� ,a av
ter Su dr) atft.,,r
I pR ***&*. & hil«s.,L
Prtt/afhe Well (C .,reek eppllcawe box)
ci prw4-- wall nNet Ilnd capped
a P k'Ae W81 to be LSW for ogler p:Mp /
.no CoU1ly Ron - mertm FErvlo9t: Jv
provide the f6j(Mag &cs: I. 1)QMoJitne1tr Perm's Poe
2. Antantafion pee $.0 anvNiuulon.
6 5at0leonpgaoftheaorstrueSon
$0.00 pMtrit applicator.,
3. WA Stste Sumbxrge 54.50
titl)klb trl x2 , - J�nanry :, 207 t
P>txc r Or t
PC%NaedlLeo alidcp Pwma lk9olrolecrrn
ton.gao�j �e�
11146
pea. iu R473 60999fi8s5Z tVA ST:01 i' g/89 /IT
Approved Transaction Page 1 of 1
psc lean air.org
Puget Sound Clean Air Agency
Notification Case #: 201103219
This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for
inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)).
Fee Amount Paid $105.00
Credit Card Transaction # VXJF8A9FAFA4
Transaction Date
11/28/11
Owner's Name
TRIMARK -HOYT ROAD LLC
Phone (253) 833 -7863
Project Street Address 4627 S 320TH ST
City
FEDERAL WAY
Zip 98023
Contact Person
AL JIWANI
Phone (253) 833 -7863
Mailing Address
420 ELLINGSON ROAD
PACIFIC, WA 98047
This project includes a demolition.
Demolition Start Date 11/29/11 Completion Date 12/06/11
Demolition will be completed by a demolition contractor
Demo Contractor GENERATION CONSTRUCTION
Contact TIM CLEMENTS
Mailing Address 202 FRONTAGE ROAD
PACIFIC, WA 98047
This is an emergency project. The emergency reason:
The project must proceed to avoid imposing an unreasonable burden.
Contractor Job # GENERCL977
Phone (253) 804 -0999
(1) I certify that the information I have provided is to the best of my knowledge true and accurate.
(2) I understand that I must file an Amendment to this Notification if:
• The type of project has changed. The project types are asbestos and demolition.
• The quantity of friable asbestos to be removed meets a larger project category.
• The project's start or completion date has changed.
(3) I understand one Notification must be flied for each structure. The only exception is for a single - family residence that includes
multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If there is no street
address, I have used a building number.
(4) I understand the fees for this Notification are nonrefundable.
Create Another Notification
If you have questions, contact us at asbestos @pscleanair.org or 206.689.4058.
https: / /secure.pscleanair.org /Asbestos /Approved.aspx 11/28/2011
• •
XOO
W ENVIRONMENTAL SERVICES, INC.
Environmental Consulting & Compliance
November 22, 2011
Mike Bailey
LDG Architects
1319 Dexter Ave N, Suite 215
Seattle, WA 98109
RE: Asbestos consulting at the Espresso Retail Structure located at 4627 S 320"' St in Federal Way, WA
Dear Mr. Bailey,
NOW Environmental Services is pleased to present this survey report for suspect asbestos - containing
building materials analysis conducted at the Espresso Retail Structure located at 4627 S 320' St in
Federal Way, Washington.
We appreciate the opportunity to have been of service to you. If you have any questions regarding this
report, please feel free to contact me at (253) 927 -5233.
Sincerely,
�•► �./
j AMR VA,
Todd Rickert
AHERA Building Inspector
Accreditation No. I/MP- NESI- 0601 -11
(Exp. 6-01 -12)
NOW Environmental Services
Enclosure:
Asbestos Survey Report
34004 9th Avenue South, Suite 12, Federal Way, Washington 98003
Phone: (253) 927 -5233 Fax: (253) 924 -0323
www.nowenvironmental.com
0
Asbestos Survey
Prepared For:
LDG Architects
1319 Dexter Ave N, Suite 215
Seattle, WA 98109
November 21, 2011
Subject Property:
4627 S 32Retail Structure
Federal Way, Washington 98023
Prepared By:
Now Environmental Services
34004 9 Avenue South, Suite 12
Federal Way, Washington 98003
9
Contents
Section
Introduction
1.0
Executive Summary
2.0
Regulatory Compliance
3.0
Sampling Plan and Laboratory Analysis 4.0
Survey Results
5.0
Conclusions and Recommendations
6.0
Limits of Survey
7.0
Appendices
Laboratory Results A
Maps B
Certification(s) C
• 0
Section 1.0 - Introduction
On November 21, 2011, AHERA Building Inspector Todd Rickert of NOW Environmental Services
conducted an inspection for suspected asbestos - containing building materials at the espresso retail
structure located at 4627 S 320`h St in Federal Way, WA, Mr. Rickert is an Environmental Protection
Agency (EPA) Accredited Building Inspector Accreditation No. I /MP -NEST -0601 -11 (Exp. 6 -01 -12).
Accessible areas were visited and samples were taken of building materials suspected to contain
asbestos (vinyl floor tile, gypsum wallboard, roofing etc.). These samples were analyzed for the presence
of asbestos. In addition, the quantities of asbestos- containing materials were estimated."" Please see
Table 2 for an inventory of sampled suspect building materials. Sample locations are indicated on the
attached site drawings.
"" QUANTITIES ARE APPROXIMATE AND ARE NOT TO BE USED FOR BIDDING PURPOSES. PROSPECTIVE
BIDDERS MUST SITE VERIFY QUANTITIES AND SITE CONDITIONS.
ESPRESSO RETAIL STRUCTURE - 4627 8 320TH ST IN FEDERAL WAY, WA PROJECT 0 N11 -1140
Section 2.0 - Executive Summary
Building Description
The espresso retail structure is a two story commercial building of approximately 450 square feet. The
structure was built in approximately the year 2007 and is a wood framed structure on a concrete slab.
Interior wall systems are gypsum wallboard with joint compound over wood framing. Other interior
finishes include ceramic tile, painted concrete and cove base with mastic. The exterior finishes included
fiberglass reinforced stucco with metal roofing.
Asbestos
No asbestos containing building materials were found in any samples taken. Please see Table 2 for an
inventory of sampled suspect building materials found at the espresso retail structure located at 4627 S
320'h St in Federal Way, WA during this survey.
Table 1
Summary of Asbestos Containing Building Materials sampled at the espresso retail structure
located at 4627 S 320 "' St in Federal Way, WA
Material Description Sample Number Material Sample Location Analytical (Laboratory)
Results
No Regulated Asbestos Building Materials Identified
ESPRESSO RETAIL STRUCTURE - 4627 S 320TH ST IN FEDERAL WAY, WA PROJECT # N71 -1140
Section 3.0 - Regulatory Compliance
Asbestos
The intent of the asbestos survey is to comply with governing asbestos regulations required by the State
of Washington and Puget Sound Clean Air Agency ( PSCAA). Currently, the State of Washington requires
a written "good faith inspection" for identification of asbestos - containing materials prior to any remodeling
or demolition work. During demolition and construction work it is the responsibility of the owner and the
contractors to make this survey document available to all concerned parties who may be handling the
building materials.
In addition, PSCAA requires that a copy of the written asbestos survey be made available on -site for
inspection by a PSCAA Control Officer during construction and demolition work. The survey is required to
be performed in accordance with 40 CFR 763.86. These federal standards require inspections to be
conducted by an EPA Accredited Building Inspector with analysis to be provided by an asbestos
laboratory certified by the National Bureau of Standards. The requirements are described in Article 1 and
Article 4, of PSCAA's Asbestos Control Standards. All survey work was conducted in compliance with the
above mentioned standards.
Asbestos - containing materials are required to be removed and disposed of in accordance with
Washington State Regulation 296 -155 WAC, Part S prior to any demolition, renovation, or remodeling
that would disturb these materials. Washington State Department of Labor and Industries and PSCAA
require that the abatement be performed using Certified Asbestos Workers under the direct on -site
supervision of a Certified Asbestos Supervisor in accordance with 296-65 WAC. Also see 296-62 WAC,
Part 1- 1— General requirements for handling asbestos.
ESPRESSO RETAIL STRUCTURE - 4627 S 320TH ST IN FEDERAL WAY. WA PROJECT # N11.1140
ILA
Section 4.0 - Sampling Plan and Laboratory Analysis
Asbestos
Obiectives
The objective of the survey was to determine the quantity and location of building materials (vinyl floor
tile, roofing, gypsum wallboard, etc.) that contain asbestos within areas to be impacted by planned
renovation work.
Asbestos Sampling Plan Protocol
This survey was conducted using a protocol adapted from the Asbestos Hazard Emergency Response
Act (AHERA). The protocol is as follows:
1. Group materials into homogeneous sampling areas.
2. Quantify each homogeneous sampling area and collect samples from each area using the "3 -5-7"
criteria for surfacing material to determine the number of samples needed. Quantify and collect a
minimum of three samples of each thermal system insulation (the number of samples collected of
miscellaneous materials was determined by the inspector).
3. Samples of each material were taken to the substrate, ensuring that all components of the material
were included.
4. Sampling was performed by a Certified Building Inspector, and the use of proper protective
equipment and procedures was followed.
Asbestos Sampling Procedure
1. Spread the plastic drop cloth (if needed) and set up other equipment, e.g., ladder.
2. Put on protective equipment (respirator and protective clothing if needed).
3. Label sample container with its identification number and record number. Record sample location,
and type of material sampled on a sampling data form.
4. Moisten area where sample is to be extracted (spray the immediate area with water).
5. Extract sample using a clean knife, drill capsule, or cork boring tool to cut out or scrape off
approximately one tablespoon of the material. Penetrate all layers of material.
6. Place sample in a container and tightly seal it.
7. Wipe the exterior of the container with a wet wipe to remove any material that may have adhered to it
during sampling.
8. Clean tools with wet wipes and wet mop or vacuum area with HEPA vacuum to dean all debris.
9. Seal the sampling location with caulking compound, spackle or duct tape.
10. Discard protective clothing, wet wipes and rags, cartridge filters, and drop cloth in a labeled plastic
waste bag.
Asbestos Laboratory Analysis
The bulk samples were analyzed in our laboratory using polarized light microscopy (PLM) with dispersion
staining in accordance with US EPA method 600 /R- 931116 as specified in 40 CFR Chapter 1 (7 -1 -93
edition) Part 763, Subpart F, Appendix A, pages 499 -504. Polarizing light microscopy quantifies asbestos
concentrations at between 100% and 1% detection levels. Levels below 1% can only be stated as
"trace."
For samples containing more than one separable layer of materials, the report will include findings for
each layer (labeled L -1 for layer one and L -2 for layer two, etc.) and a total percentage for the entire
sample. The asbestos concentration in the sample is determined by visual estimation.
For those samples with asbestos concentrations between 1 and 10 percent based on visual estimation,
the EPA recommends a procedure known as point counting (NESHAPS, 40 CFR Part 61). Point counting
is a statistically more accurate means of quantification for samples with low concentrations of asbestos.
ESPRESSO RETAIL STRUCTURE -4627 S 320TH ST IN FEDERAL WAY. WA PROJECT 0 N11 -1140
0 •
Section 5.0 - Survey Results
Asbestos
Table II
Summary of suspect Asbestos Containing Building Materials sampled at the espresso retail
structure located at 4627 S 320th St in Federal Way, WA
Material Description
Sample Number
Material Sample Location
Analytical (Laboratory)
Results
Texture, Joint Compound
and Gypsum Wallboard
N11- 1140 -001
Throughout
Non- Detect
Texture, Joint Compound
and Gypsum Wallboard
N11- 1140 -002
Throughout
Non - Detect
Texture, Joint Compound
and Gypsum Wallboard
N11 -1140 -003
Throughout
Non- Detect
Exterior Stucco
N11- 1140 -004
Throughout
Non - Detect
Exterior Stucco
N11- 1140 -005
Throughout
Non- Detect
Exterior Stucco
N11- 1140 -008
Throughout
Non- Detect
4" Black Cove Base and
Mastic
N11- 1140 -007
Throughout
Non- Detect
Ceramic Tile Grout
N11- 1140 -008
Bathroom
Non - Detect
White Ceramic Tile
N11- 1140 -009
Bathroom
Non - Detect
Ceramic Tile Mastic
N11- 1140 -010
Bathroom
Non - Detect
ESPRESSO RETAIL STRUCTURE - 4627 S 320TH ST IN FEDERAL WAY, WA PROJECT # 1411 -1140
•
Section 6.0 - Conclusions and Recommendations
NOW Environmental Services is not responsible for materials which require destructive means to access,
or materials which are hidden from sight, those materials hidden behind walls, or materials which cannot
be found with reasonable diligence. Extreme caution should be used during renovation or demolition to
ensure that additional unidentified materials are not disturbed. In the event that additional materials are
discovered, the material should be sampled by an EPA Accredited AHERA Building Inspector and
analyzed to determine if it contains asbestos prior to disturbance.
Asbestos
According to Washington Administrative Code (WAC) 296 -62 -07721, prior to the start of work, a building
owner must identify the presence, location, and quantity of ACM and /or presumed ACM (PACM) prior to
renovation and demolition. This information must be communicated to contractors bidding on work,
contractors performing other work, employees and tenants in or adjacent to the work area. The Puget
Sound Clean Air Agency Regulation III, Article 4 requires that an asbestos survey be conducted prior to
any renovation or demolition of existing buildings. This survey was intended to meet these regulatory
requirements.
Asbestos - containing materials are required to be removed and disposed of in accordance with
Washington State Regulations prior to any demolition, renovation, or remodeling that would disturb these
materials. Washington State Department of Labor and Industries and PSCAA require that the abatement
be performed using Certified Asbestos Workers under the direct on -site supervision of a Certified
Asbestos Supervisor. The only exemption is for resident owners performing removal of asbestos -
containing materials other than furnace interiors and direct applied mudded asbestos insulation.
ACM is identified as those building materials containing greater than one percent ( >1.0 %) of asbestos as
verified by laboratory analysis. All building materials fabricated prior to 1980 are assumed to contain
asbestos unless proven otherwise by a licensed building inspector.
Materials that contain 1.0% or less asbestos are not regulated for disposal purposes. However, removal
of materials containing 1.0% or less asbestos is considered an unclassified asbestos operation by OSHA
and WISHA. Unclassified asbestos operations cover employees likely to be exposed in excess of the
permissible exposure limit (PEL), and who are performing operations not covered by Class I through IV.
For construction work involving unclassified asbestos the applicable requirements will include: an
exposure assessment, use of vacuum cleaners equipped with HEPA filters, use of wet methods and
prompt cleanup of debris, use of respirators and protective clothing, training, and record keeping.
Asbestos - containing joint compound associated with non - asbestos gypsum wallboard (GWB) assemblies
is sometimes found in specific locations of a building. The presence of asbestos in this material requires
personnel impacting the material to adhere to regulatory requirement outlined in WAC 296 -62- 17712(2)
and training as outlined in WAC 296 -62 -07722(5) and WAC 296-62 -07728. Personal protect equipment
and proper work practices are required pending completion of a negative exposure assessment. Such an
assessment may include air monitoring of workers' breathing zones. Refer to WISHA Regional Directive
23.30 for additional information.
The possibility exists that additional ACMs may be present in wall and ceiling cavities. Any previously
unidentified material encountered during construction activities should be sampled prior to impact. Work
that may be impact asbestos should be performed by personnel having proper training and utilizing
proper worker protection according WISHA standards.
NOW Environmental Services recommends that a Certified Asbestos Project Designer design any
asbestos abatement project to ensure that the job is completed according to regulatory standards.
ESPRESSO RETAIL STRUCTURE -4627 S 320TH ST IN FEDERAL WAY, WA PROJECT # N11 -1140
9 41
Section 7.0 - Limits of Survey
Asbestos surveys are non - comprehensive by nature and subject to many limitations including those
presented below. Our assessment has considered risks pertaining to asbestos; however, this survey is
limited to only those locations sampled. This survey was not designed to identify all potential concerns or
eliminate all risk associated with asbestos. Materials sampled were limited by the scope of work as
defined by the drawings provided.
Lead based paint & TCLP testing, mercury light tubes and /or other hazardous materials were not included
in the scope of work during the course of this survey. Other risks that were not evaluated with this survey;
Risks such as 1) toxic and hazardous substances in (or in contact with or associated with) soil or ground
water; 2) risks associated with structural, electrical, or mechanical working of the building; 3) risks
associated with radon gas, slope stability, building settlement, moisture, or site drainage and flooding
have not been evaluated during this survey. No warranty, expressed or implied, is made.
The site visit consisted of a thorough visual walk - through of building for the purpose of viewing and
sampling potential asbestos - containing material. A TCLP sample was not collected of the building to
determine levels of leachable lead in building debris. Suspect PCB containing light ballasts were
not estimated. Fluorescent bulbs were not quantified for recycling purposes. Mercury vapor
lamps were not Identified during the survey.
NOW Environmental Services performed this survey in accordance with the generally accepted standards
of care that exist in the industrial hygiene profession in Washington State at the time of this study. The
asbestos survey was performed in preparation for removal of asbestos - containing materials in
accordance with NESHAPS regulations.
This survey is not intended for use as plans and specifications. These estimates are for approximating
actual bid prices from contractors only, and may not reflect the actual final costs of asbestos and /or lead
abatement. They do not include sales tax, or Owner costs such as abatement project oversight and
monitoring for compliance to law and /or compliance to project plans and specifications. These estimates
assume that adequate, professional plans and specifications are prepared and the abatement costs are
minimized by professional project management, and that all asbestos containing materials are abated
during one project by the same asbestos contractor.
Written By:
Todd Rickert
AHERA Building Inspector
Accreditation No. I /MP -NEST- 0601 -11
(Exp. 6 -1 -12)
Reviewed By:
( ) ;A, Zu-::�
Donna McNeal
AHERA Building Inspector, CEO
ESPRESSO RETAIL STRUCTURE - 4627 S 320TH ST IN FEDERAL WAY, WA PROJECT 0 N11 -1140
0
APPENDIX A
Laboratory Results
4)
ORION Environmental Services
34004 Ninth Avenue South, Suite Al2, Federal Way, WA 98003
Phone: (253) 952 -6717 • Fax: (253) 927 -4714
Email: info @oriones.net • Web: www.oriones.net
WBE W21`9219763
Polarized Light Microscopy Test Report
EPA Method 600/R- 98/116
Client: LDG Architects Rpt. Date: 11/22/2011
Address: 1319 Dexter Ave N, Suite 215, Seattle, WA 98109 Page: 1 of 2
Attention: Mike Bailey Invoice: 115048
Project Name: Espresso Stand Date Rcvd: 11/21/2011
Project Number: Nil -1140
%
Client
Orion Material
Sample
nta�n g
Asbestos
Other
Sample ID
Sample ID Description
j Treatment
Material '
Type
Fibers
la
20111121.56 ! Texture
ND r
cellulose
1b
Joint Compound
ND
cellulose i
1C
Wallboard
_
h
ND
cellulose
2a
20111121 -57 ", Texture
ND I
y
_
cellulose
2b
Joint Compound
ND 1
cellulose
2c
Wallboard
ND
cellulose
3a
120111121-58 Texture
ND ,
cellulose
3b
Joint Compound
NO i
cellulose
3c
Wallboard
i
1 NO }
cellulose
4
20111121 -59 Stucco
l crush
, NO
5
20111121 -60 I Stucco
I crush
NO 4
6
20111121 -61 Stucco
crush
NO
7a
20111121 -62 ( Cove Bass
j
i NO
ICI man -made
fibers-
7b
Mastic
chloroform
NO l
.i
8
20111121 -63 Ceramic Tile Grout
crush
ND
g
{ 20111121 -64 Ceramic Tile
i Crush
ND I
I
10
� 20111121 -65 Ceramic Tile Mastic
111 i
1
'chloroform
i NO �
,
0
•
Polarized light Microscopy Test Report (cont.)
Client: LDG Architects
Address: 1319 Dexter Ave N, Suite 215, Seattle, WA 98109
Attention: Mike Bailey
Project Name: Espresso Stand
Project Number: N11 -1140
Rpt. Date: 11/22/2011
Page: 2 of 2
Invoice: 11SO48
Date Rcvd: 11/21/2011
% P
Asbestos
Client Orion Material Sample Containing Asbestos Other
Sample ID Sample ID Description Treatment Material Type Fibers
Dup: Laboratory OA/QC Duplicate; M; Mastic [(a), (b), (c), etc.]: Sample layers numbered from front to back.
Comments: For layered samples, each component has been analyzed separately. ND means non - detect for asbestos fibers by
EPA Method 600 /R- 98 /116.Disciaimers: PLM has been known to miss asbestos in a small percentage of samples that contain
asbestos. Thus, these laboratory results represent due diligence, however negative or <1 % PLM results can not be guaranteed.
Per EPA guidelines samples will be archived for 30 days then will be disposed of. This report may only be reproduced in full with
written approval of ORION Environmental Services.
Analyzed By (Print) Date
Reviewed By (Print) Date
Dennis Rauschenberg 11/22/2011
Donna McNeal 11/22/2011
Analyzed By (Signature) Time
Rev' d By (Signature) Time
0
APPENDIX B
Field Sheets
•
1 2 3 4 5 6 7 $ 9 10 u 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
I � 1 . Y 1 ; • � � ;
' 1 I 1 � I 1 t I I Y
� I . • ♦ 1 1 I � � i � t . . t I t I 1 , 1
A I 1 1 1 r • ! 1 r • •
• , . • . , , , . • • • • a I f . • ♦ 1 I • f i 1 1 • . 1 1 . 1 I
-------------------- .1...•.L_.•.Jr... i •... L... w. i.• a_ J__.__ L_._. a.... J.•.. �....••._... J_..• y._..- L••._ J.- a•. 1.•... L.... L.- n_ J.__._ L..__ L_•..a...n.L_•.•4..._- a..._.J.. _•..lr...L•..
1
1 1 I • • t • 1 1 1 1 1 , , , 1 r 1 I I • • 1 1 1 r
1 1 I t • • r 1 1 1 • I I • 1 . -. -- •.•
•
•.____ �._-. y.._._.. r.... �..•. ya...- n--- w1.... y• r_.. r•-_• p• n.. �.... y___._,..__. t__...,_.•.. r__-. n__•_7____ y_--._.. r..•__.. 1. ••..n- •.•.__•_1a.___•.•.__e._•. I ••.•ry.•_._p..•a �•....+f.
1 1 t 1 1 ; �
1 t I I I 1 : •
`. I 1 • • 1 I • 1 1 I • 1 , , 1 •
I , • t 1 • / 1 t t - _- •iY '�- •11 -- '-- r T 1 1 t 1 1 • t 1 .._.
.I .. . r..•.�...- �.•a..,_a...ra•..*1
...
1 I 1 • 1 1 • 1 •
D , I t ♦ / • r 1 • t 1 ! • I ! I 1 1 • ; I . r Y 1 ; • . • ! f 1 I .
• . 1 • . . • 1 I • . 1 . I , ---- (- ---s--'--: ----' ra---}--- - {---- -r-'-- }- •••i-••. ;-. _..'r__•.s---.:,...._-r- -- -s-._
E 1 I 1 . ♦ • • r 1 ♦ • : . i . . i . . • t . • • • • . . t r r
L_•.. J____J•_.._ L.. .•1..._J__•••♦...•.L.•__ ?• -.•.� ___•i._..�.... ,•___•'____..___?_____L__ a.;_.__'___._ I____-;_•-_ i__..t._..•; •.._i____i_. ---- i_._•L._••i.•.. A.•._L ...•f -__. J.._._L.•_.'.._
p. t I • . I i y y�1 • ' . i � i i � i � : i
r 1 I 1 I I lf�J I •
1 1 . • t . r � • I 1 ♦
L.. .•J..._J•- ....1.•..L.•••J-....L •.__L..•.J• _ J...•_ L....L-•_. J...._ L___.1..._J_._._l.__.\___.J..._ t_...L....1_... J...•.la...L •a._J•..••l..__L• .J......L _.»..L...nJ..a..L.r..\.--
,
r 1 I t • 1 , - i
• • 1 I t . • 1
1 I • t • r I 1 • t 1
• r I • I Y • 1 , I
G i . r . • I . • • I 1 I , 1 • 1 I . , i I I 1 t
r • ! r 1 • • 1 1 f I 1 1 . r t 1 r 1 ! 1 I _•._ _..
r__..J.___.t.. :..r..._...•. K---- .f._•- r.•...• ---- . ....r....a..._ 1...-- r--_•..._. J.•.._ F._.• r__.• y..-_- 1__.._ r __..1- .r.ti.....•..••.•- r••...1. __. .J.r•..1.....L..._. a.....a....- F- .._s -.._
H 1 , 1 I ♦ I •
1 1 1 • • • . . • 1 1 I � I 1
_�•...••r_._.r....� «.a.,.•. .n— .._�..• —,,. _a..r___.�__._�__ —_ Y___ -; ___- �____�.____�____�_ -• —.,• «._r -.__T .r— ._- Tw...� ---- .r ---- r •- •_ ..•.• �- .•._•r.a._T---
1 I Y t • • t • 1 1
I r r 1 I • r 1 • • /
,•_ - --1' 1 1 r....i.....,..•-- f- ...T..•.,, .... •,•...r(..•.�. -.w.,. _...r . .�._a •.�_••. r.w.- �..n.i.._.1.....�.•_.. i.....i.___- ,.....T • -•
1 1 . 1 • • . 1 • • 1 • ♦ . r � � � ' 1 1 � � 1 � r � � . . i 1 . t
J 1 1 • t • r r e • r I r 1 1 1 I . i r • 1 1 ♦ 1 I 1 -
1 1 t 1 ♦ I • • ! • ! r 1 1 1 • - -
• • 1
t_...i__..J•....t....1.« rJ._...�L_•..L..__J —• -_J« .. .•.. �..._ i.___• L ...•l_.•• {._...L....�.... ?•_..- '•__..L....i_•.. �r_._.L .L.•.. Jr.w_ � ... -L_.» ........... Lr•..L..•.•i.... � .i._.
1 ' 1 t t t 1 r r 1 1 t I t 1 : i • � 1 1
, 1 1 r • • r 1 I • • 1 r 1 1 l t , I f • • 1 ♦
Kt • I I • ♦ 1 1 • • 1 1 •
I t r 1 r . ♦ . . 1 . r 1 1 r. • . r I e r _
L--•-J--•_ J..... L._._L._ •- J.__..L_...L....J_...- .\..... ...-J._.. J....• L.... L.... J..... L_... L.. ...J..._J.••.rL.a..J..•.J•....L --- 1._.•J..•._a •.._1__n.J....i ..- •L....J.._. J_...rb..�..; as
I 1 ! I 1 • . • t I • ' j • I .
4 1 1 1 I t I I t I -. ._ . .. - -- - -- -
t 1 • 1 1 r 1 • 1 I 1 • 1 1 I I 1 1 • !
• I • 1 1
• I 1 I 1
r..•. J._•-. I.... LL•.. .L.s..J..... ►••..1.....J...../. ------------------ - . ►....L•.-•J.r.. M.. •\.._.J._•..M ._. ,. L..•.Jr-__�. -•..l ..•L•...J._.•.l. .l• _.•. ..i.. •.L ___s.1- .r-
1 1 1 I • 1 1 • I r I • t 1 I
M 1 , 1 I 1 • ! • • t t Y 1 • 1 • I ♦ • • r t a 1 t , . ' _.
• I 1 1 I 1 • 1 . Y I • t • r 1 I 1 t
1 I I I 1 1 ♦ 1 1 • • • 1 ...•y-- - -`r -- -r------- --- •--- -- r-------- _1'...•r ... t•-....•... p.•.- n•.. ------ - •..- •.n....�.. -.1.- ..fin.. • -r.
N 1 1
r.•.- l•.•..,.....r_• 4V f.•... ..r-.•.. 1- _.- .,•.... .•..T...•. ra. - - .. 7.....r •. - T__•_1__•_Y'___'P_._•y._. _.'1•___.�. • _*...•.,...•.,.•_•.,... ..�.•_- ..�•._.,.�..••T_.....,.. •...i•___f -__
1 r • r I r r 1 � � r i i � i � � 1
• I
I 1 • 1 . r • ♦ • • e I
-1 � • I i . r � : • . i i e I
p 1 1 • t I _ —
I 1 1 I • • ♦ 1 / r r • ' • • ' '
L.... f.... J..... Lw ..•1..._ ?....wr.- _..L..••J. -. -A _... .r.•1. ----------- ..
•... -.. �............ i ...• �__.. �...... . -.. �...• ;.. -•.; .•1._.. -
.1 •_..i.... ,a •_- ?.... -i __._ ?..._ �._- ..t.... A...•
• I • • • • f Y • I • I ; ♦ • ♦ 1 . • t
Q1 t t • f • 1 r I 1 1 I t
I 1 1 • • •)�YL✓ _`-a. • �.•.. ' -.• J.•-.. L...._ L_.• .J•.,._.I••...L- r..;....J..•••L •1• _ J-... .L...•L•- r.J....i.••.L_...J.... J_._..L.••.L.._.
a • • I • • ( i i i i r • r 1 1 . i y : ..y.....a.....r..._y.._... •..- n - - - -rr
r • • • I _..
n._. -..._- M....r...-a.•..y- .a..y..... ' I 1 I ♦ • I r 1 I . 1 t ! • ♦ 1 1
� I ) 1 I ♦ • ♦ I 1 • I • • • 1 I � 1 I ! 1
♦ 1 1 • I ' i e 1 • ♦
1 t 1 1 I ♦ ��� y(�� ' ..• • 1 ...T.... qr... _r ................._.r•...y.... 1. _•-•r - -- -• - • -- T--- _n____1.__. Y....:. .;- ...r.• '
.. -. _., -... r•..'r---- T-- - -- -ol ---- ----- -- - -•.r. f.....,-a...,. •.._ 1 ♦ • f 1 1 • r 1 I • 1 1 • I . I t.
r i 1 . 1 . 1 • • r I 1 r
T I I 1 1 1 • • t . r 1 I • r r ' e i : i i. i . . • —. ..
1 1 ...r.... }.... 1•.•- � .� � .ti.. .f T• _i•_ f• f • l.. r. -s.� .1. .Y. ..r. .1. .1... .... -e-
• '
' 1 1
y t • • 1 • r r ! _ qI Y • • ♦ • • 1
L___.J.... ----------- \..•.J_. _ "•�..a•_,.. _- .1..Uyi /wL(/�F•I. ....... ...l.w.. , -� y� -•J.... J-.... L•_._.__- J_..• rL. .- .1....,...•_L_...a-- ._J_....L
• 1 • 1 I t r/ 1 I • 1 Y T • I t ♦ r I i • i • I
1 1 t 1 • 1 1 I • I , • t I I 1 1 • 1
w t 1 1 t 1 • • I 1 ' • I r • Y • • I I • I 1 • • • -- . ........
r • I 1 • 1 1 Y • •_ _
I
r---- a-----•----- r---- a---- J- ---- L-- '_a..•_i.....Y.. jA -a4 J....— ---- L--- -•.... J--- -- 1.- •- .M-.._J. .\. .__.L_.__�•.- .J....•I..-- -a_... �._..i •__.Y_.._�.... rt•.._•L____L
1 t I 1 • ; , t Y • ♦ 1
X 1 1 I • • I 1 ; • • • • . _♦ 1 • .• ------ -- - --- --- - -- ----- ----- •. _ --- --
I I • 1 I • • _ __ _ -_ _ • -_
1 1 t r 1 I I 1 I ------- - •__. _
'•--------- - •- -- -- r- -- ••-_•- 1.•_..n ____...•__q.... T ..r.Ir.. -;. -.. y..- _.r. -•.♦ .. ♦ . Y
Y I . • . . ♦ •
I 1 I , I r . t ♦ . . • 1 .
• . • • • 1 I
.............. • .... r ------------------------------- ............
• -------------- - - - • . • 1 t • 1 1
NOW ENVIRONMENTAL
SERVICES, INC.
34004 - e Ave. S., Ste # 12
Federal Way, WA 98003
NOW ENVIRONMENTAL SERVICES
_CLIENT NAME:
ADDRESS: )31`1
TELEPHONE:
FAX:
CELLULAR:
SAMPLE I LAB
NO. NO.
11-Ilz -lb ill iat
bo1 I I -57-(
cvzIIs
�y
SAMPLE CUSTODY FORM
SITE ADDRESS: s'e
77 ,71-7 "
rl 4) �v1,4 .
INSPECTOR:
DATE SAMPLED:
4 HOUR 24 -HOUR
MATERIAL DESCRIPTION
PROJECT NUMBER N 11 ' % l5'o
RE LiN UISHED
DATE / TIME :>
RECEIVED BY:..
DATE / TIME: 11- i _ 7
Y
MATERIAL LAYER EACH
ID AND LOCATION
SUBSTRATE OF
MATERIAL
`oo,»
QTY. I TREAT ! % 1 TYPE I FIBERS
PAGE 1 OF
•I
NOW ENVIRONMENTAL SERVICES
SAMPLE CUSTODY FORM
PROJECT NUMBER /M-//`l0
CLIENT NAME: .7
SITE ADDRESS:
RELINQUISHED BY:
MATERIAL
ID
LAYER
AND
SUBSTRATE
DATE / TIME:
ADDRESS:
TREAT
%
TELEPHONE:
INSPECTOR:
RECEIVED BY:
FAX:
DATE SAMPLED:
DATE i TIME:
CELLULAR:
4 HOUR 24 -HOUR 3DAY
SAMPLE
NO.
LAB
NO.
MATERIAL DESCRIPTION
MATERIAL
ID
LAYER
AND
SUBSTRATE
LEA
ON
AL
QTY.
TREAT
%
TYPE
OTHER
FIBERS
I
PAGE OF
•
APPENDIX C
Certifications
0
\i
Ns
e�
,
hxs'. ��L4441
ro
CSDC eNtraprise - City of F0ral Way's Online Services Page 2 of 2
Floor sheathing
Open
IVR User 0
Insulation
Open
IVR User 0
Gypsum Wallboard Nalling
Open
IVR User 0
Suspended Ceiling Grid
Open
IVR User 0
Miscellaneous Inspection
Open
IVR User 0
Re -steel
Open
IVR User 0
Public Works Inspections
Open
Nov 4, 2011
Ann Dower (253 - 835.2732) 0
Final - Plumbing
Open
IVR User 0
Firwl- Mechanical
Open
IVR User 0
Final - Planning
Open
Matthew Herrera (253- 835.2638) 0
Final - Public Works
Open
Nov 4, 2011
Ann Dower (253- 835 -2732) 0
Final - Fire Department
Open
IVR User 0
Final - Building
Open
IVR User 0
Issue Certificate of Occupancy
Open
IVR User 0
As -built Drawing Review
Open
NOV 4, 2011
Ann Dower (253 - 835 -2732) 0
MA
http:// epermits .cityoffederalway.com /AMANDA5/ eNtraprise /FederalWay /pubiic /p... 11/28/2011