04-102018-01City of Federal Way
Community Development Services
33530 1st Way S
Federal Way, WA 98003 -6210
Ph: 253.661.4000 Fax: 253.661.4129
Building - Multi Family Permit #: 04 - 102018.- 01, - MF
Project Name: WOODMARK AT STEEL LAKE
Project Address: 31400 23RD AVE S
Inspection request line: 253.835.3050
Parcel Number: 092104 9127
Project Description: ALT - Conversion of existing living units into one space; modifications to existing doors and new doors
for security and egress control; addition of a small deck. The revision modified the deck railing.
Owner
Applicant
Contractor
Lender
WOODMARK AT STEEL LAKE LL
LEWIS ARCHITECTS, THE
KLD SERVICES LLC
WOODMARK AT STEEL LAKE LL
31200 23RD AVE S #100
2800 NORTHRUP WY #100
KLDSEL *997NG 10/16/05
11747 NE l ST ST #220
FEDERAL WAY WA
BELLEVUE, WA
KLD SERVICES LLC
BELLEVUE WA
98003 -5533
198004
1 16720 NE 139TH PL
98005 -3018
Includes:
Census category: 435 - Reside
#1
#2
#3
#4
[Occupancy Group:
LC
No
Number of Stories ......... ......... ...............2
(Construction Type:
Type V - One-HR
Plumbing . ........................................ I.....
No
Total Proposed Sq. Peet...... , ........
r Occupancy Load:
Floor Area (Sq. Ft.):
Sensitive Areas? .................. ...............................
Yes
Zoning Designation.............. ...............................
J
Census Category....... .... ...... ......................:435
- Residential alt/add - dec
Deck Proposed Sq, Feet...... ........1
............306
Fire Sprinklers..... .....i ........................
Yes
Mechanical.,....... .................................
No
Number of Stories ......... ......... ...............2
Permit for Building Shell Only.........
........♦... No
Plumbing . ........................................ I.....
No
Total Proposed Sq. Peet...... , ........
............306
Sensitive Areas? .................. ...............................
Yes
Zoning Designation.............. ...............................
CC -F
CONDITIONS:
1. Two new parking lot landscaping trees must be installed per the approved plans. Once the trees are installed, please call
Jane Gamble at (253) 835 -2644 prior to building final to schedule a planning inspection.
2. The new deck must be constructed with materials and finish colors consistent with the existing building.
3. Care shall be taken to not disturb existing storm drainage lines in the area to be excavated for the deck footings.
Contractor is reponsible for field- locating existing storm lines.
4. The new deck downspout line shall be connected to the existing 8" roof drain line, NOT to the existing 12" drain line
located just east of the proposed deck.
PERMIT EXPIRES March 19, 2005.
Permit issued on September 20, 2004
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and
the City of Federal Way.
Owner or agent: A�A�_ I
®3
�U
0�
Date: q '/'V ho y
THIS CARD IS TO AIN ON -SITE
CITY of ?ommunity Developm t Inspection Record
Federal Way IVR INSPECTION REQUEST PHONE # (253) 835 -3050
PERMIT #: 04- 102018 -01 -MF
Owner:
Address: 31400 23RD AVE S
FEDERAL WAY, WA 98003 -5548
This card is part of your required inspection documents. Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD.
Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not
be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections
are logged on the back of this card.
❑
Footings /Setback (4110)
❑
Foundation Wall (4115)
❑
Drainage/Downspout (4040)
Approved to place concrete or grout
Approved to place concrete
Approved to cover
Approved to place concrete
I
By
Approved to backfill
By
Date
By
Date
By
Date
❑
Re -steel (4215)
❑
Plumbing Groundwork (4190)
❑ Slab /Concrete Floor (4255)
Approved to place concrete or grout
Approved to cover
Approved to place concrete
By
Date
By
Date
By Date
❑
Floor Sheathing (4105)
❑ Shear Walls (4245)
❑
Underfloor Framing (4285)
Approved to sheath floor
Approved to install flooring
Approved to install siding
By
Date
By
Date
By Date
❑
Fire/Draft Stops (4095)
NCTE: Prior to scheduling a Framing (4120)
❑
Roof Sheathing (4220)
Approved to install roofing
Approved
inspection; Electrical, Plumbing & Mechanical
Rough -in and Fire/Draft Stop inspections must be
By
Date
By
Date
signed -off and approved. IBC 109.3.4/UBC 108.5.4
❑
Insulation (4150)
❑ Gypsum Wallboard Nailing (4130)
❑
Framing (4120)
Approved to insulate
Approved to install wallboard
Approved to install mud & tape
By
Date
By
Date
By Date
❑
Final - Fire Department (4060)
❑ Final - Planning (4070)
❑
Suspended Ceiling Grid (4265)
Approved to drop tile
Approved
Approved
By
Date
By
Date
By Date
❑ Final - Public Works (4080) Final - Building (4050)
Approved A � � Ap2roved
By Date By ,J Date Lk-1 kj—a