Loading...
06-104658' City of Federal Way Community Development Services P.O. Box 9718 Federal Way, WA 98063 -9718 Ph: (253) 835 -2607 Fax: (253) 835 -2609 ■ Demolition Perm #: 06- 104658 -00 -DE Inspection Request Line: (253) 835 -3050 Project Name: CHOI Project Address: 737 SW 328TH PL Parcel Number: 683782 0130 Project Description: Demolition of fire damaged residence w /foundation to remain. Owner Applicant Contractor CHUN Y CHOI RANDY JOHNSON UNIVERSAL BUILDING JACQUELINE CHOI UNIVERSAL BUILDING UNIVEBI005MF (7/1/07) 737 SW 328TH PL 8300 61ST AVE NE 8300 61ST AVE NE FEDERAL WAY WA OLYMPIA WA 98516 OLYMPIA WA 98516 98023 -5225 Additional Permit Information CONDITIONS: After a spection is come A#di p -v d, Please contact Kari Cimmer by e-mail at Karii b t�,ci.federal- way.wa.us to receive a refund of cash bond. I hereby certify that the above i the occupancy and t use P P is correct and that the construction on the above described property and Fdance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: fir ' %-& 9- V) -&-n Date: 9. 14 -4 •` THIS CARD IS TO nVMAIN ON -SITE X , CITY OF Community m Rt p Develo p Inspection Record Federal Way IVR INSPECTION REQUEST PHONE # (253) 835 -3050 PERMIT #: 06- 104658 -00 -DE Owner: CHUN Y CHOI Address: 737 SW 328TH PL FEDERAL WAY, WA 98023 -5225 This card is part of your required inspection documents. Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence On -going inspections are logged on the back of this card. ❑ Final - Building (4050) Approved By C Date 1( Y RECE &D r'ederajway SEP 14 2006 PERMIT C0mwx7Y DEYELOPMEMr 3332S8mAyENVE� fN•pp� OF FEDER ' CATI O N FmzRALWAY,WA 98063 -9718, BU(LDING D ?53435- ?607• PAX ?53,835- ?609 www.d(n•Red n*my.wm - an SITE ADDRESS Z will not be C SF MF CO ME EL PLCDDE EN FP ited. Please print leatbiu /in ink) or tune. SUITE /UNIT # ASSESSOR'S TAX /PARCEL # C) LOT SIZE (s}J LEGAL DESCRIPTION (e.g. Acme Estates, Lot 1) (A-ch swouft ~la kMW lW daaatpuanl ROJECT INFORMATION TYPE OF PERMIT ❑ BUILDING . ❑ PLUMBING ❑ MECHANICAL DEMOLITION ❑ ELECTRICAL ❑ ENGINEERING ❑ FIRE PREVENTION SYSTEM PROJECT DESCRIPTION (Provide detailed description of work included on this hermit only) wSa �i� _ ��_ ��♦ 1,�a It - Iia MEW PROJECT NAME (Name of Business or Owner Last Name) PEOPLE •- • PROPERTY OWNER CONTRACTOR APPLICANT CONTACT LENDER NAME PRIMARY PHONE �ti o'er (2-6 ) 4'49 - Sb3 n MAILING ADDRESS C STATE, ZIP 47 3-r S vet 3 COMPANY NAME Q U N APPLICANT NAME OFFICE PHONE OFFICE PHONE ' t LC-71t-5#4%— — ul (- D, .,. MAILING ADDRESS �{-`: CITY, STATE, ZI �f- igS7�6 CELL PHONE (36o ) 789 -1$8( CITY OF FEDERAL WAY BUSINESS LICENSE NUMBER EXPIRATION DATE FAX NUMBER $_B L l l Woo )4.93 -Mv99- CONTRACTORS REGISTRATION NUMBER loopy of card required with "ch appltcat(oul EXPIRATION DATE v iv V G $ '= o o 5 M 07/ o/ 107 COMPANY NAME APPLICANT NAME OFFICE PHONE ' MAILING ADDRESS CITY, STATE, ZIP CELI. PHONE' RELATIONSHIP TO PROJECT FAX NUMBER o Architect ❑:Tenant ❑ Agent o Other (Describe) EXISTING USE PROPOSED USE EXISTING ASSESSED /APPRAISED VALUE VALUE OF PROPOSED WORK SPRINKLERED.BUILDING? ❑ YES ❑ NO FIRE SUPPRESSION SYSTEM PROPOSED %REQUIRED? ❑ YES o NO WATER SERVICE PROVIDER ❑ LAKEHAVEN ❑ HIGHLINE ❑ TACOMA ❑ PRIVATE (WELL) SEWER SERVICE PROVIDER ❑ LAKEHAVEN . ❑ HIGHLINE ❑ PRIVATE (SEPTIC) 0 0 AREA DESCRIPTION EXISTING S . FT. PROPOSED S . FT. TOTAL SO. FT. BASEMENT . SUMPS WASHING MACHINES URINALS FIRST VACUUM BREAKERS SECOND THIRD FOURTH ADDITIONAL FLOORS (DESCRIBE) DECK (COVERED ?) GARAGE ❑ CARPORT ❑ NUMBER OF FLOORS ssmve neorwse TOTAL EMMON "NEW HOMES ONLY" NUMBER OF BEDROOMS ESTIMATED SELLING PRICE $ number of eaeh type of fixture to be installed or Value of Mechanical Work $ AIR HANDLING UNITS EVAPORATIVE COOLERS BBQS FANS BOILERS FIREPLACE INSERTS COMPRESSORS FURNACES .DUCTS GAS PIPE OUTLETS BATHTI,JBS 1 «Tub/sho comw SHOWERS DISHWASHERS SINKS GAS PIPE OUTLETS __, . SUMPS WASHING MACHINES URINALS LAVS fs.th— " VACUUM BREAKERS I eerWy under penalty of perjury that the infw7no am authorised by the owner of the above promises to harmless the City of Federal • Way as to any claim line such claino, which may be by any p ludic arises out of the rslian jt city, in nq office this application. �f NAME /TITLE RELATIONSEV TO o Agent as part of this project. Do not include existing fvd4res to. OAS LOOS REFRIG. SYSTEMS HOODS Icoemacdat► WOODSTOVES RANGES MISC (Desenbe) GAS WATER HEATERS b WATER CLOSETS pogo' MISC (Describe) DRINKING FOUNTAINS RAINWATER SYST HOSE BIBBS ELECTRIC WATER HEATERS n furnished by me is true and correct to the best of my knowledge, and further, that I wform the work for which the permit application is .made. I further agree to hold ling costa, expenses, and attorneys' fees Incurred in the investigation and d4(ense of the undersigned, and filed against the City of Federal Way, but only where such claim and employees, upon the accuracy of the information supplied to the city as a part of Contractor a Architect o Other 13......1 ..PA L \L7o+.An.dn \Da.+.+:• Awnl:nofinn i DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES 33325 8`" Avenue South PO Box 9718 Federal Way WA 98063 -9718 253- 835 -2607; Fax 253 - 835 -2609 www. c ityoffed eralway. corn DEMOLITION PERMIT REQUIREMENTS A demolition permit is required to remove any structure or structures on a subject property. Check with the City's Planning Division to see if the proposal exceeds thresholds that trigger an environmental review. An environmental review and submittal of an environmental checklist may be required, which will extend the time period before a demolition permit can be issued. ❑ Prior to submitting a demolition permit, the following items (as applicable) must be signed by the respective agency (see attached Demolition Permit Contact List). NoTE TO APPLICANT. Utilities shall be disconnected and services performed, if applicable, prior to issuance of the demolition permit. All applicable items below are to be signed and dated by the respective agency representatives. 1. ASBESTOS ABATEMENT (Copy of approval form and asbestos survey from Puget Sound Clean Air Agency provided) (City of Federal Way Building Official) 2. GAS SUPPLY (Gas to be shut off, meter removed and final bill paid) A/4 (Puget Sound Energy) 3. SEPTIC SYSTEM (Tank to be removed or tank to be drained and filled) (King County Environmental Services) 4. SANITARY SEWER (Check applicable box) • Sewer line capped at property line • Existing sewer line to remain and be used by proposed new structure LA (Sewer District) S. GARBAGE (All household garbage disposed off and final bill paid) (RST Disposaf /Federal Way Disposal) ❑ Completed Construction Permit Application form ❑ Provide the following fees: & ELECTRICITY (Electricity to be shut off and meter removed) NId- (Pug tSound Energy) 7. FUEL STORAGE TANKS (Above or below grade fuel tanks, have been pumped or removed under Fire Department permit prior to any dismantle /excavation) (Federal Way Fire District #39) 8. WATER - Public Source (Check applicable box) ❑ Meter to be removed and final utility bill paid o Meter to remain and be protecte (Water Supplier) * * * * ** OR * * * * ** 9. WATER - Private Well (Check applicable box) • Private well filled and capped • Private well to be used for other purposes (King County Environmental Services) 1. Demolition Permit Fee 2. Automation Fee 3. WA State Surcharge 4. Cash Bond Deposit $65.50 5.00 4.50 500.00 (Refundable upon Completed Final Inspection) $575.00 Bulletin #122 — January 1, 2006 Page t of 1 k: \Handouts \Demolition Permit Requirements Aug, 31, 2006 5; 51 PM LIMITED SCOPE ASBESTOS INSPECTION Single Family Residence 737 SW 3281h Place, Federal Way, WA PROJECT: limited Scope Asbestos Inspection LOCATION: Single Family Residence 737 SW 328`h Place Federal Way, WA 98023 CLIENT: Universal Building Inc. 8300 6151 Avenue NE Olympia, WA 98516 SITE CONTACT: Randy Johnson 0. No. 0018 P. 1 /10 NO`UVICKI NVTRONMENY`AL EM180NbONiAL MANAGEASNT Y CONdWC4 Phone: (360) 459 -1646 FAX: (360) 493 -1699 PROJECT Identify asbestos containing material (ACM) in this single family residence that has DESCRIPTION: experienced a fire and that may be impacted by upcoming renovation work. EXECUTIVE This limited scope asbestos inspection was conducted at the subject facility on Friday SUMMARY: August 1B, 2006. None of the materials sampled on this date tested positive for asbestos content. This inspection was limited to only those areas that might be impacted by upcoming renovation work. No samples were collected from the electrical and lighting systems as they were energized at the time of the inspection. Electrical and lighting system components should be presumed to be ACM until tested. Locations from which the samples were collected are keyed to the accompanying site sketches. BUILDING The structure is a two story approximately 2,700 square foot vacant single family DESCRIPTION: residence of traditional wood frame construction dating from the 1990s timeframe with an attached two car garage. The exterior is clad with painted wood siding and the roofing is wood shake. The interior is made up of a living room, family room kitchen with adjoining eating area, formal dining room, guest room, three bathrooms, four bedrooms and an attached two car garage. Interior partition walls and ceilings are made up of wood framing covered with painted and textured gypsum wallboard. Exterior walls are insulated with blown in material. Flooring on the main level is made up a variety of hardwood, sheet vinyl, carpet over pad and bare concrete (in the garage). Flooring on the second level Is comprised of carpet over pad and sheet vinyl. Windows are insulated vinyl units. Doors are both solid and hollow core wood. None of the exposed plumbing was insulated. Heat is provided to the structure via a forced air gas furnace. None of the visible ductwork was insulated. An unjacketed gas water heater was present. 34004 9th Avenue South Suite 12 Federal Way, Washington 98003 Phone: (253) 927 -5233 Fax: (253) 924 -0323 Aug. 31. 2006 5;51PM No. 0016 P. 2/10 INSPECTION On Friday August 18, 2006 Nowicki Environmental Services inspected the Subject DATE: property and collected the samples described in this report. INSPECTOR �) ENDORSEMENT: �G�CF./Vto�rti' Ron Coleman PROJECT j'� i REVIEW: ' c: ' Alan Olson ANALYSIS Polarized Light Microscopy METHOD: PARMMRS: The Puget Sound Clean Air Agency (PSCAA) and Washington State Department of Labor and Industries (L&I) regulations require an inspection of all buildings for the presence of asbestos - containing materials (ACM) prior to renovation and demolition. ACM is identified as those building materials containing one percent (1.0 %) or more of asbestos as verified by laboratory analysis. All building materials fabricated prior to 1980 are assumed to contain asbestos unless proven otherwise by a licensed building inspector. DEFINITIONS: ACM is subdivided into three types; (1) Surfacing Materials: These are defined as those materials that are sprayed -on, toweled -on or otherwise applied to surfaces including, but not limited to, lath and plaster, acoustical plaster on ceilings, paints, fireproofing materials on structural members or other materials on surfaces applied for decorative purposes. (2) Thermal System Insulation (TSI): These materials are defined as those applied to pipes, fillings, boilers, tanks, ducts or other structural components to prevent heat loss or gain. (3) Miscellaneous Materials: All other building materials that may be ACM but not surfacing materials or TSI fall into this category. SAMPLES Eleven primary samples were collected for this inspection. As mentioned in the EXTRACTED: Executive Summary on the first page of this report, none of the materials sampled on this date were found to be asbestos containing. Locations from which the samples were collected are keyed to the accompanying site sketches. Sample Description Location Anal sis 01 White sink undercoating Kitchen Non - Detect 02 Vinyl sheeting and associated tan mastic Utili Room Non - Detect 03 Fiberglass insulation Exterior Walls Non - Detect 04 White insulation Attic Non - Detect 05 White vinyl sheeting and associated mastic Bath II Non- Detect 06 White Vinyl s ieeting and associated mastic Bath III Non- Detect 07 Joint compound and associated wallboard Upstairs Hallway Non - Detect 08 Roofing felt Gara a Roof Non- Detect 09 Joint compound and associated wallboard Kitchen Non- Detect 10 Joint com ound and associated wallboard Breakfast Area Non - Detect 11 Siding paper Garage Exterior Non - Detect Limited Scope Asbestos Inspection 737 5W.12811 !Place, Federal Way, WA P8023 IVowickl EnvJronmental Serv/ces Project # 06 -0318, August 2006 Page 2 03 Aug, 31. 2006 5;51PM No. 0018 P. 3/10, LIMITATIONS: During renovation of this structure it is possible that additional suspect ACM may be discovered in other areas /systems not accessible or tested at the time of this survey. Should such suspect material be discovered, an AHERA- certified building inspector will have to sample and test the materials to provide evidence that they are non- asbestos containing. Nowicki Environmental Services is neither responsible for the classification of materials that are not identifiable with reasonable diligence, not for the identification of materials beyond the scope for this project as we understand it. No hard measurements were taken of this structure; all square /lineal footage figures are approximate rough estimates to provide perspective and scope. Disclaimer rh /s report and Its contents are limped to the scope and activities performed at the subject Property" described. We represent that our serv/ces were performed within the Ilm /ts prescribed by applicable regulations and in a manner consistent with the level of care and skill ordinarily - XerdSed by other professional consultants under similar dreumstances. No other representation is made to the cifent, expressed or 1 /ed, and no w4manty or guarantee is Included or intended. L/m/ted Scope Asbestos Inspection 137 5'W 3280 place, federal Way, WA 99023 page 3 of 3 Nowicki f�n✓lronmental $ervices Project # 06 -0318, August 2006 Aug. 31. 2006 5:51PM Ajr'P li { No. 0018 P. 4/10 Aug. 31. 2006 5: 51 PM No. 0018 P. 6/10, . O• rion Environmental Services 34004 9* AVehue South ♦ BuDding A Sulte 5 ♦ Fcdernl Way, Waahlbfon 98009-6740 Seattle 874 -8118 ♦ Tacoma (2$3) 952 -6717 ♦ Facsimile (253) 927 -4714 ♦email 0FJQN6717 @aol WBE W2F5912535 Telephone (253) Polarized Light Microscopy Test Report EPA Method 600/R- 98/116 Client Nowicki Environmental Services, Inc. Date August 22, 2003 34004 9'h Avenue South, Building #12 Page Page I of 2 Federal Way, WA 98003 Invoice 063763 Date Received August 18, 2006 Project Number 06 -0318 Client / Project Name 737 SW 3281° Place — Federal Way, Washington Client Orion Sample Asbestos Number Stereo Scope Exam Treatment Percent Tyne Other Fibers Number 01 60818 -01 White Sink Undercoat Chloroform ND - Cellulose Homogeneous 02 60818 -02 Vinyl Sheeting w/White - ND - Cellulose Felt Backing Homogeneous Tan Mastic Chloroform ND - Cellulose Homogeneous 03 60818 -03 Fiberglass Insulation ND - Cellulose Fiberglass Homogeneous 04 60818 -04 White Insulation Tease ND - Cellulose Fiberglass Homogeneous 05 60818 -05 White 'Vinyl Sheeting ' ND _ Cellulose w /Felt Backing Homogeneous Tan Mastic - ND - Cellulose Homogeneous 06 60818 -06 White Vinyl Sheeting - ND - Cellulose w/Felt Backing Homogeneous Tan Mastic - ND Cellulose Homogeneous 07 60818 -07 Joint Compound - ND - Cellulose Homogeneous Wallboard - ND - Cellulose Homogeneous 08 6081808 Roofing Felt Ash ND Homogeneous Aug, 31. 2006 5:52PM No, 0018 P. 7/10 O• rion Environmental Services 34004 96 Avenue Soutb • Building A Suite 5 ♦ FtdetW Way, Wasbtngton 981103.6740 W.BE WV5912535 Telephone Seattle (253) 874 -8118 • Teconte (253) 953 -6717 ♦ FacsitnUe (353) 927 -1714 *email ORION6717 @401 Polarized Light Microscopy Test Report EPA Method 600/R.- 981116 Client Nowicki Environmental Services, Inc, Date August 22, 2003 34004 9°i Avenue South, Building #12 Page Page 2 of 2 Federal Way, WA 98003 Invoice 063763 Date Received August 18, 2006 Project Number 06 -0318 Client / Project Name 737 SW 328th Place -- Federal Way, Washington Client Orion Sample Asbestos Other Number Number Stereo Scope Exam Treatmen Percent —Type _ Fibers 09 60818 -09 Joint Compound ND - Cellulose Homogeneous Wallboard - ND - Cellulose Homogeneous Wallboard - ND - Cellulose Homogeneous 10 60818 -10 Joint Compound - ND - Cellulose Homogeneous Wallboard - ND - Cellulose Homogeneous 1l 60818 -11 Siding Paper Ash N)D - Cellulose Homogeneous Dup: Laboratory QA/QC Duplicate; M; Mastic ((a), (b), (c), etct. Sample layers numbered from front to back. Comments: For layered samples, each component has been analyzed separately. ND moans non -detect for asbestos fiber by EPA Method 600/R- 98/116, Per EPA guidelines, samples will be archived for 30 days and then disposed of Disclaimers: PLM has been ]mown to miss asbestos in a small percentage of samples that contain asbestos. Thus negative PLM results cannot be guaranteed_ This report Nay only be reproduced in full with written approval of ORION Environmental Services. Analyst 10. 4 Reviewed By Nelson B. Miles III Aaron Halverson Sr. Industrial Hygienist Laboratory Manager t CO N 0 n z A 3 � N q `u _ J Ul O k N A z x� c, -. A G'1 Tim �)IJIOW m � x x o o ' OD r N O O V C a' 1 J Q N 4 P� rF to 0 r� ML m fmt r� 1:t r-t O Olt 'd L100 ' °N WdoS:s 9041 le 'gad N � � rP � 1• h poll b PK =, Old � p let Ul o r� ML m fmt r� 1:t r-t O Olt 'd L100 ' °N WdoS:s 9041 le 'gad Agency Case No. N AGENCY ° " " ``-' �-�1 ►te1.J 110 Union Street, Suite 500 � p o J 2UU6 Seattle, WA 98101 -2038 t" 200600782 www.pscieanair.org pwt LEAN NOTICE OF INTENT`` A Proieet Type: I. ❑ Friable Asbestos Removal 2 ❑ Fri able Asbestos Removal A Demolttton 3 Demolition Onfv B. � � <f461-- _ -- Property Owner: C Phone: 2 S>9 9 ' 50310 Mailing Addres : -F57 5 w 3 2—e P G4'r-e Ci C—t' �"_ State "-- Zip: 9-F C. Asbestos NLEASEPR/MCLEA Y. r7ilS LLBEYO �RREIi7RxMA1Ll (,LABEL. Contractor: O_r E - -- Owner /CEO: Mailing Address: Was Friable Asbestos Identified? Uyes WNo Contractor Structures: Phone: Job No.: AHERA Building Inspector: A Certification #: - C-0 fit Ex . Date: J G,v Ze ?.00-7 City: State: Zip: Fax: 13oileffutnace Insulation U Duct Insulation Pipe Insulation LJ Fireproofing Paints Plaster Textured Coatings D. Site �—� S W 3� Y L Icity: Address: � (.11 `�' Site p Manager: R J O'tEry 5411.', @ ILocalPhone: 3604. 45q - r (p 4-k- E. Asbestos Survey or No. of Date of Asbestos Was Friable Asbestos Identified? Uyes WNo P�+C�umed Structures: Survey: 1 2on6 Was Nonfriable Asbestos Identified? ❑Yes QlNo Attach a copy of the survey when friable asbestos AHERA Building Inspector: A Certification #: - C-0 fit Ex . Date: J G,v Ze ?.00-7 has not been identified. Completion Date: Hours: Total . to be Removed: Linear Ft. Will all friable asbestos ❑ Yes Square Ft. materials be removed? ❑ No F. Demolition Start I No. of 1. Training Fire (List Fire Dept.) Information: Date: Structures: 12. ❑ Ordered Demolition attach copy of Order Demolition Insert demolition contractor's mailing address on back Will nonfriable asbestos be left in place during demo? U Yes W No Contractor: VN ,S�q $�� ,t, t :FG If yes, list type and qty. Note disposal requirements in Step 6 (on back). A. Prior Notice B. 10 Days* A. $25 project) Asbestos removal can be in upon notification; demolition must wait 10 days) G. Friable Asbestos Project NONE Work Days: M T W Th F Sa Su Information: Start Date: Completion Date: Hours: Total . to be Removed: Linear Ft. Will all friable asbestos ❑ Yes Square Ft. materials be removed? ❑ No 13oileffutnace Insulation U Duct Insulation Pipe Insulation LJ Fireproofing Paints Plaster Textured Coatings .,,,,.,...p. vulumu% V r'riayierworingmaterlal timer: H. Asbestos/Demofition Project Categories: Notification Period Project Demolition L Single- Family Residence (owner - occupied): Fee Surcharge A. ❑ Asbestos Removal Project Only B. 1W - Demolition Project (with or without asbestos removal A. Prior Notice B. 10 Days* A. $25 project) Asbestos removal can be in upon notification; demolition must wait 10 days) Note: !f the single family residence is owned by one family who has been or will be using the residence as their domicile, the above boxes JA or 1B may be checked If this is not an owner- occupied residence, one of the categories listed below must be used instead. A single omit resid nce does not include rental property, multi-family units, or any mixed -use buildin . 2. U All Other Demolitions (with no Asbestos removal or Nonfriable Asbestos 10 Days $100 only or less than 10 linear feet and/or 48 square feet of friable Asbestos Friable Asbestos Projects other than Single Famil-v Residence): Asbestos Demo 3. LJ >_ 10 - 259 linear feet and/or 2t 48 - 159 square feet of asbestos Prior Notice 10 Days $100 $100 4. L3 260 - 999 linear feet and/or 160 - 4,999 s uare feet of asbestos 10 Da s $200 $100 5. Li > I Q00 linear feet and/or >5.000 s uare feet of asbestos 10 Days $600 $ ifl0 6. Emergency Asbestos Project or U Emergency Demolition Project j Prior Notice $50 Emergency Fee (Single-Family Residences are exempt from cinergency emergency fee. however, property owners must provide a written emer enc r nest) I. I certi that the info n contained in this notification &supplemental data is, to fhe best of my knowledge, accurate & complete. Agency AU6 3 t 20 _ Puget Sound Clean Air Agency Fort No.: 66 -160 (Revised 2/05) TS IF n I V CJ' �j / O d 1 AMOUNT. K S-0 RCP% NO. :2 �- .( The Puget Sound Clean Air Agency requires advance notification before any person commences a friable asbestos project involving materials equal to or greater in size than 10 linear feet or 48 square feet and for all demolition projects (regardless of asbestos content) involving structures with a projected roof area greater than 120 square feet (Regulation 111, Article 4). All asbestos removal and demolition notifications must be submitted to the Agency on current Agency forms. Asbestos removal and demolition projects involving materials and structures below the notification threshold are still subject to all other requirements of Regulation III Article 4. After receiving a complete notification with the appropriate project fee, the Agency will review the form and return a copy to the asbestos and demolition contractor by mail. The returned copy will be your validated notification. J Demolition Contractor: N V -5 to 1 iJ N C Owner /CEO: Moiling Address: g� Q Q �� o Phone: '� S - 9 ' �O 4—% Contractor's Job #: I S9 city: L- .� Li a State: W zi : 9 Fax- 3 0 .4° 3 • I log GUIDELINES FOR SUBMITTING AN ASSESTOSIDEMOLITION NOTIFICATION Step 1. Check the appropriate project type in Box A. Friable asbestos includes popcorn Ceiling material, sheet vinyl flooring, cement asbestos board siding, and duct insulation. Nonfriable asbestos is normally found in vinyl floor tiles, window putty and most roofing materials. Step 2. Enter property owner information in Box B. Step 3. Enter the asbestos contractor or property owner information, if the property owner is conducting a single - family residential project, in Box C. Print clearly this is your return mailing label. Step 4. Enter the site address for all notifications in Box D. For multi- structure projects, attach supplemental sheet with a site map (include an address for each site) and a list of the type and amount of friable asbestos to be removed from each structure. Step 5. Check either asbestos survey or material presumed in Box E. All demolitions require that an Asbestos Hazard Emergency Response Act (AHERA) asbestos survey be conducted by a certified AHERA building Inspector. Attach a copy of the survey to the notification of a demolition vroiect when only nonfriable asbestos or no asbestos is identified on the survey. Step 6. Enter the project information in Box F. and check the training fire or ordered demolition box if appropriate (a copy of the official order must be attached). All asbestos must be removed prior to conducting a training fine. Additional training fire requirements are contained in Regulation I, Section 8.08. If any nonfriable asbestos materials will be left in place during demolition, check yes and list the type and quantity of material. Note: Demolition debris containing nonfriable asbestos materials must be labeled as "nonfriable asbestos- containing waste" and be deposited at an authorized waste disposal facility. Step 7. Enter asbestos project information in Box G. List types of friable asbestos material to be removed: surfacing material such as popcorn ceilings or plaster, sheet vinyl flooring, duct and pipe insulation, cement asbestos board siding or pipe, etc. Step & For owner - occupied Single -Family Residential projects, check BOX H1A for renovation projects or BOX 111B for demolition projects (with or without asbestos removal). Asbestos removal may be conducted after a complete notification is received, but demolition activities can only begin on the 1 e day after the notification is received. Note. If the single fancily residence is owned by one family who has been or will be using the residence as their domicile, bares IA or IB may be checked A single family residence does not include rental property, multi family units, or any mixed -use building. For Commercial asbestos projects (or projects that do not qualify as Single Family Residential); check the project category H2 - 5 that matches the amount of friable asbestos that will be removed. If a demolition is involved, include the appropriate surcharge (additional fee) in your payment. To file for an emergency asbestos or demolition project, check the appropriate box 1 - 5 and the applicable emergency box in H6. All emergency requests must be accompanied by a letter from the property owner demonstratinthe need to conduct the nroiect immediately in accordance with the requirements in Regulation III. Section 4.03 (c) Step 9. Please certify the accuracy and completeness of the information provided by signing the notification in Box I. Mandatory amendments to the notification are required for changes that increase the project category, change the types of asbestos materials to be removed and changes to start date, completion date and work schedule for asbestos projects. No fee is required for work schedule changes if the -contractor is participating in the Agency work schedule fax program. A $25.00 processing fee is required for all amendments. Puget Sound Clean Air Agency asbestos regulations and forms can be downloaded from the Agency web page at www.pseleanair.org. For technical assistance call (206) 689 -4058 and for administrative inquiries call (206) 689 -4090. Puget Sound Clem Air Agency Forth No.: 66-160 (Revised 2105) TS