Loading...
11-100525' ' ` ' I Electrical City of Federal Way • • Community Development Services Permit #: 11 - 1 00525-00-EL P.O. Box 9718 Federal Way, WA 98063 -9718 inspection Re uest Line: 253 835 -3050 Ph: (253) 835 -2607 Fax: (253) 835 -2609 FIL p q Project Name: CORTIVA INSTITUTE Project Address: 2030 S 314TH ST Parcel Number: 092104 9053 Project Description: Add 5 thermostats Owner Aoalicant Contractor HILLSIDE PLAZA ASSOCIATES KEVIN HAYS ALL STAR HEATING & A/C INC PO BOX 5003 ALLSTAR HEATING & AIR CONDITIONING (ELECTRICAL) BELLEVUE WA 98009 -5003 INC ALLSTSH91402 (9/22/11) 4223 338TH PL SE PO BOX 70 FALL CITY WA 98024 FALL CITY WA 98024 Is Use Educational or Institutional ? ....................... No Service greater than 999 Amps? ............................. No 5 I hereby certify that the occupancy and Owner or agent: and the City of Federal Way he above described.�rop ions of the State of Wast Date: Cffy OF Federal Way THIS CARD IS TO RUMAIN ON -SITE Construction Ins F�l ion Record INSPECTION REQUE : (253) 835 -3050 PERMIT #: 11- 100525 -00 -EL Address: 2030 S 314TH ST Project: HILLSIDE PLAZA ASSOCIATES FEDERAL WAY, WA 98003 -5475 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. F I UFER Ground (4295) Ditch cover (4030) Temporary Power (4275) Slab/ Concrete Floor (4255) Approved By Approved Approved to place concrete By Date By Date By Date F I Pool Bonding (4195) Temporary Power (4275) Service (4235) By Approved By Approved By Approved By Date By Date By Date Feeders /Sub - panels (4045) Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date By Date Dated l G Final - Electrical (4055) Approved By� Date F I Rough Electrical Approved Final Electrical Approved Right of Way —� Approved By Date By Date By Date