11-102539x
City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835 -2607 Fax: (253) 835 -2609
t
.Y 7 LE
Project Name: THE COMMONS AT FEDERAL WAY
Project Address: 1928 S COMMONS
03uildingg_ Cammercial
Permit #: 11- 102539 -00 -CO
Inspection Request Line: (253) 835 -3050
Parcel Number: 762240 0010
Project Description: TI - Relocation of mall security and maintenance offices, including a new rooftop unhand
plumbing fixtures.
Owner
AR8lican
Contractor
Lender
STEADFAST COMPANIES
STEADFAST COMPANIES
S G FOUST CONSTRUCTION INC
STEADFAST COMPANIES
4343 VON KARMAN AVE SUITE 3(
4343 VON KARMAN AVE SUITE 30
SGFOUGF911KJ (5/12/13)
4343 VON KARMAN AVE SUITE 300
NEWPORT BEACH CA 92660
NEWPORT BEACH CA 92660
23502 25TH DR SE
NEWPORT BEACH CA 92660
BOTHELL WA 98021
Census Category: 437 - Commercial alt / add / conversion
Includes:
#1
#2
#3
#4
Occupancy Class:
M
Construction Type:
Type V - B
Occupancy Load
Floor Areas . ft.
1,554
0
1 0
0
Additional Permit Information:
CONDITIONS:
1. Rooftop appurtence(s) shall be painted to minimize visual impact.
PERMIT EXPIRES Saturday, July 13, 2013
Permit Issued on Monday, January 14, 2013
1 hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in acco ance with the laws, rules and regulations of the State of Washington
d the City of Federal Way. / C�
Owner or agent: w Date:
-,
CITY OF r
Federal Way
PERMIT #:
Project:
THIS CARD IS TO REMAIN ON -SITE
Construction I ection Record
INSPECTION REQUE TS: (253) 835 -3050
11- 102539 -00 -CO Address: 1928 S COMMONS
STEADFAST COMPANIES FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
E]
SWM Precon Site Mtg (4400)
Floor Sheathing (4105)
Initial Erosion Control (4365)
Plumbing Groundwork (4190)
Footings /Setback (4110)
Slab /Concrete Floor (4255)
Approved
Approved to place concrete or grout
To be done prior to breaking ground
Approved to place concrete
By
Date
By
Date
By
Date
Underfloor Framing (4285)
Re -steel (4215)
Floor Sheathing (4105)
By
Plumbing Groundwork (4190)
Rough Plumbing (4230)
Slab /Concrete Floor (4255)
Right of Way
Approved
Approved to place concrete or grout
0
Approved to cover
By Date
Approved to place concrete
By
Date
By
By
Date
By
Date
Underfloor Framing (4285)
Insulation (4150)
Approved to install wallboard
Floor Sheathing (4105)
By
Date
Rough Plumbing (4230)
Approved to sheath floor
Right of Way
Approved
Approved to install flooring
0
Approved
By Date
By
Date
Date
By
Date
E]
Mechanical Rough -in (4165)
Gas Piping (4125)
Fire/Draft Stops (4095)
Approved
Approved to release test
Approved
Date 2 . cc _ /J7
By
Date
By
Date
Interim Erosion Control (4370) Framing 4120
Approved Prior to scheduling a Framing inspection; Approved t g (ulate )
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections roust be signed -off and
By Date approved. IBC 109.3A By Date
X13
® Final - Mechanical (4065)
Approved
By Date ..
Final - Plumbing (4075)
Approved
By Date �?
JT Suspended Ceiling Grid (4265)
Approved to drop tile
By Date 2- _2;e� _
Final Erosion Control (4375)
Approved
By Date
�f Final - Building (4050)
gl Approved
By Date]' ^�
El
Insulation (4150)
Approved to install wallboard
0 Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By
Date
By
Date 2 -4 . /3
Right of Way
Approved
By
0
By
Final - Fire Department (4060)
Approved
Final - Planning
Approved
By
Date
By
Date
® Final - Mechanical (4065)
Approved
By Date ..
Final - Plumbing (4075)
Approved
By Date �?
JT Suspended Ceiling Grid (4265)
Approved to drop tile
By Date 2- _2;e� _
Final Erosion Control (4375)
Approved
By Date
�f Final - Building (4050)
gl Approved
By Date]' ^�
El
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date
'ECEN
�I. WERMIT a Federal
COMAIUMy=VeWPMSNPSRRVICBS JUN 2'$APpLI�CATIQN
258 - 895 -2607• FAX 25M IS•2609
W-W-1 tnnrrede olmay oom
n- FAD
- �2- -5-3 g
SF &LE PL DE EN FP
..7 /! / /
k IL I
SITE ADDRESS `
svlTa /UNtr r
1928 S. Commons Way, Federsa Way, WA
r
9.4
PROJECT VALUATION
ZONING
ASSESSOR'S TAX /PARCEL t
$60,000
cc-C
752240- 0025-06
X BUILDING ❑ PLUMBING ❑ MECHANICAL
TYPE OF PERMIT
❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PRE'V'ENTION
NAME OF PROJECT
Mall Maintenance and Security Office Relocation at Commons Mail
(Tenant Name /Homeowner Last Name)
Relocation of existing mall maintenance 8v security offices
PROJECT DESCRIPTION
Detailed description of work to
be included on this permit only
NA
PRIMARY PHONE
PROPERTY OWNER
St"Mast caws. If, LLC
949 -623 -7709
MAILING ADDRSSS
E-MAIL
1$100 Von Kamsa, SAfts boo
Jpaldn*teadfastoempaalas.eom
CITY
TE
Z
Irwin*
7IP
92512
VAN& &&AA
PHONE
WAILING AD $
E•MAIG
CONTRACTOR
ZIP
FAX
CITY
WA STATE C LICENSE #
EXPIRATION DATE
FEDERAL WAY augmes5 LICENSE i
NAME
PHONE
sane as Owner
APPLICANT
KPJLING ADDRESS
a -MAIL
CITY
STATE
ZIP
FAA
PROJECT CONTACT
HAMS
PHONE
(The individual to receive and
Han. as Owner
24KAD.
respond to all correspondence
!!AILING ADDassS
concerning this application)
Cwt
STATE
ZIP
FAX
AkIZZA TIE CONTACT NAMES
PHONE
E•mur,
PROJECT FINANCING
NAME Bon Aviv Investments LLC
OWNER - FINANCED
Required value of 355, 000 or more
(RCW 19.27.095)
MAILING ADDRESS, Crr, r, STATE, ZIP
PHONE
342 Grand Avenue Englewood, New .terse , 07631
2011293 -0640
I eert{fy under penalty of perjury that I am the property owner or authorised agent of the property owner. I certify that to the best
of my knowledge, the information submitted in support 4f this permit application is true and correct. 1 cart(& that I wiU comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for eontplfanes with foeaI, state, or fedsrai Laws regulating
construction or environmental laws.
I further agree to hold harmless the ederal Way as to any claim (including costs, expenses, and attorneys' fees
incurred In the Investigation and Ise of such m), which may be made by any person, including the undersigned, and
filed against the , u ere such claim the reliance of the city, including Its offic an employees,
upon the a ation su of this application.
SIGNATURE. DATE
PRINT r- - —
•
0
VALUR OP MWAMCAL Wom $ tbd Z (a copy qf bid or estimate must be provided)
ject. Do not include existing flxtures to remain,__
Indicate how many of each type o ure be " or relocated as part of this pro OTHER (Describe)
I AIR HANDLING UNITS FAQ GAS PIPE OUTLETS
AIR CONDITIONER FIREPLACE INSERTS HOODS
BOILERS FURNACES HOT WATER TANKS (o.4
COMPRESSORS GAS LOG SETS REFRIGERATION SYST
DUCTING GAS PIPING WOODSTOVES
a
CRITICAL AREAS ON PROPERTY?
WATER PURVEYOR
no
LAXERAVS11
ZXISTING/NmVIOUS USE
LOT am FU OquAm
STORAGZIRSTAIL
2,287,336
awra PURVEYOR VALUE OF WUSTWQ IMPRIMPROVEMENTS PR0VZV-
RAVEN
$--20'000�
jjI847Ra I= —arRIMMRSt SYSTEM? PROMBRID FIRM SUPPRESSION SYSTI
x Yes ci No x Yes o No
Bulletin 11100 — lanuarY 1, 2011
Page 2 of 3
k:\Iiandouts\Pcm-Ait Application