Loading...
11-102539x City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835 -2607 Fax: (253) 835 -2609 t .Y 7 LE Project Name: THE COMMONS AT FEDERAL WAY Project Address: 1928 S COMMONS 03uildingg_ Cammercial Permit #: 11- 102539 -00 -CO Inspection Request Line: (253) 835 -3050 Parcel Number: 762240 0010 Project Description: TI - Relocation of mall security and maintenance offices, including a new rooftop unhand plumbing fixtures. Owner AR8lican Contractor Lender STEADFAST COMPANIES STEADFAST COMPANIES S G FOUST CONSTRUCTION INC STEADFAST COMPANIES 4343 VON KARMAN AVE SUITE 3( 4343 VON KARMAN AVE SUITE 30 SGFOUGF911KJ (5/12/13) 4343 VON KARMAN AVE SUITE 300 NEWPORT BEACH CA 92660 NEWPORT BEACH CA 92660 23502 25TH DR SE NEWPORT BEACH CA 92660 BOTHELL WA 98021 Census Category: 437 - Commercial alt / add / conversion Includes: #1 #2 #3 #4 Occupancy Class: M Construction Type: Type V - B Occupancy Load Floor Areas . ft. 1,554 0 1 0 0 Additional Permit Information: CONDITIONS: 1. Rooftop appurtence(s) shall be painted to minimize visual impact. PERMIT EXPIRES Saturday, July 13, 2013 Permit Issued on Monday, January 14, 2013 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in acco ance with the laws, rules and regulations of the State of Washington d the City of Federal Way. / C� Owner or agent: w Date: -, CITY OF r Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON -SITE Construction I ection Record INSPECTION REQUE TS: (253) 835 -3050 11- 102539 -00 -CO Address: 1928 S COMMONS STEADFAST COMPANIES FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. E] SWM Precon Site Mtg (4400) Floor Sheathing (4105) Initial Erosion Control (4365) Plumbing Groundwork (4190) Footings /Setback (4110) Slab /Concrete Floor (4255) Approved Approved to place concrete or grout To be done prior to breaking ground Approved to place concrete By Date By Date By Date Underfloor Framing (4285) Re -steel (4215) Floor Sheathing (4105) By Plumbing Groundwork (4190) Rough Plumbing (4230) Slab /Concrete Floor (4255) Right of Way Approved Approved to place concrete or grout 0 Approved to cover By Date Approved to place concrete By Date By By Date By Date Underfloor Framing (4285) Insulation (4150) Approved to install wallboard Floor Sheathing (4105) By Date Rough Plumbing (4230) Approved to sheath floor Right of Way Approved Approved to install flooring 0 Approved By Date By Date Date By Date E] Mechanical Rough -in (4165) Gas Piping (4125) Fire/Draft Stops (4095) Approved Approved to release test Approved Date 2 . cc _ /J7 By Date By Date Interim Erosion Control (4370) Framing 4120 Approved Prior to scheduling a Framing inspection; Approved t g (ulate ) Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections roust be signed -off and By Date approved. IBC 109.3A By Date X13 ® Final - Mechanical (4065) Approved By Date .. Final - Plumbing (4075) Approved By Date �? JT Suspended Ceiling Grid (4265) Approved to drop tile By Date 2- _2;e� _ Final Erosion Control (4375) Approved By Date �f Final - Building (4050) gl Approved By Date]' ^� El Insulation (4150) Approved to install wallboard 0 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date By Date 2 -4 . /3 Right of Way Approved By 0 By Final - Fire Department (4060) Approved Final - Planning Approved By Date By Date ® Final - Mechanical (4065) Approved By Date .. Final - Plumbing (4075) Approved By Date �? JT Suspended Ceiling Grid (4265) Approved to drop tile By Date 2- _2;e� _ Final Erosion Control (4375) Approved By Date �f Final - Building (4050) gl Approved By Date]' ^� El Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date 'ECEN �I. WERMIT a Federal COMAIUMy=VeWPMSNPSRRVICBS JUN 2'$APpLI�CATIQN 258 - 895 -2607• FAX 25M IS•2609 W-W-1 tnnrrede olmay oom n- FAD - �2- -5-3 g SF &LE PL DE EN FP ..7 /! / / k IL I SITE ADDRESS ` svlTa /UNtr r 1928 S. Commons Way, Federsa Way, WA r 9.4 PROJECT VALUATION ZONING ASSESSOR'S TAX /PARCEL t $60,000 cc-C 752240- 0025-06 X BUILDING ❑ PLUMBING ❑ MECHANICAL TYPE OF PERMIT ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PRE'V'ENTION NAME OF PROJECT Mall Maintenance and Security Office Relocation at Commons Mail (Tenant Name /Homeowner Last Name) Relocation of existing mall maintenance 8v security offices PROJECT DESCRIPTION Detailed description of work to be included on this permit only NA PRIMARY PHONE PROPERTY OWNER St"Mast caws. If, LLC 949 -623 -7709 MAILING ADDRSSS E-MAIL 1$100 Von Kamsa, SAfts boo Jpaldn*teadfastoempaalas.eom CITY TE Z Irwin* 7IP 92512 VAN& &&AA PHONE WAILING AD $ E•MAIG CONTRACTOR ZIP FAX CITY WA STATE C LICENSE # EXPIRATION DATE FEDERAL WAY augmes5 LICENSE i NAME PHONE sane as Owner APPLICANT KPJLING ADDRESS a -MAIL CITY STATE ZIP FAA PROJECT CONTACT HAMS PHONE (The individual to receive and Han. as Owner 24KAD. respond to all correspondence !!AILING ADDassS concerning this application) Cwt STATE ZIP FAX AkIZZA TIE CONTACT NAMES PHONE E•mur, PROJECT FINANCING NAME Bon Aviv Investments LLC OWNER - FINANCED Required value of 355, 000 or more (RCW 19.27.095) MAILING ADDRESS, Crr, r, STATE, ZIP PHONE 342 Grand Avenue Englewood, New .terse , 07631 2011293 -0640 I eert{fy under penalty of perjury that I am the property owner or authorised agent of the property owner. I certify that to the best of my knowledge, the information submitted in support 4f this permit application is true and correct. 1 cart(& that I wiU comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for eontplfanes with foeaI, state, or fedsrai Laws regulating construction or environmental laws. I further agree to hold harmless the ederal Way as to any claim (including costs, expenses, and attorneys' fees incurred In the Investigation and Ise of such m), which may be made by any person, including the undersigned, and filed against the , u ere such claim the reliance of the city, including Its offic an employees, upon the a ation su of this application. SIGNATURE. DATE PRINT r- - — • 0 VALUR OP MWAMCAL Wom $ tbd Z (a copy qf bid or estimate must be provided) ject. Do not include existing flxtures to remain,__ Indicate how many of each type o ure be " or relocated as part of this pro OTHER (Describe) I AIR HANDLING UNITS FAQ GAS PIPE OUTLETS AIR CONDITIONER FIREPLACE INSERTS HOODS BOILERS FURNACES HOT WATER TANKS (o.4 COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES a CRITICAL AREAS ON PROPERTY? WATER PURVEYOR no LAXERAVS11 ZXISTING/NmVIOUS USE LOT am FU OquAm STORAGZIRSTAIL 2,287,336 awra PURVEYOR VALUE OF WUSTWQ IMPRIMPROVEMENTS PR0VZV- RAVEN $--20'000� jjI847Ra I= —arRIMMRSt SYSTEM? PROMBRID FIRM SUPPRESSION SYSTI x Yes ci No x Yes o No Bulletin 11100 — lanuarY 1, 2011 Page 2 of 3 k:\Iiandouts\Pcm-Ait Application