Loading...
12-104447r. r aS City of Federal Way ^ Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835 -2607 Fax: (253) 835 -2609 03uilding - C *' merdal . Permit #: 12- 104447 -01 -CO Inspection Request Line: (253) 835 -3050 Project Name: FEDERAL WAY DISCOUNT GUNS & INDOOR RANGE Project Address: 1401 S 324TH ST Parcel Number: 150050 0140 Project Description: TI - Phase 2 of Project; Construct a new interior second floor for new office, restroom, and attic area. Install partition walls & finishes, and includes plumbing & some minor mechanical work. Owner KILLY II LLC Aq licant MIKE HOVLAND Contractor 6901 WATER STREET NE Lender MOHAMMED & ANNA BAGHAI 6901 WATER ST NE HOVLAND ARCHITECTS TACOMA WA 98422 6901 WATER STREET NE FEDERAL WAY WA 98422 900 MERIDIAN AVE E SUITE 408 Construction Type: TACOMA WA 98422 MILTON WA 98354 Occupancy Load- Census Category: 437 - Commercial alt / add / conversion Includes: # 1 #2 #3 #4 Occupancy Class: B Construction Type: Type V - B Occupancy Load- Floor Areas . ft. 2,615 1 0 0 1 0 New / Additional Sq. Feet - 2nd Floor ...................836.9 Mechanical to be Included ? ....... ............................Yes Permit for Building Shell Only9 .............................No New / Additional Sq. Feet - Total .......................... 837 Zoning Designation .................. .............................BC Existing Sprinkler System in Building? .................No Number of Stories ................... ..............................1 Plumbing to be Included? ....................................... es Occupancy # 1- Use ................ ............................... Professional Services/Offices Ducting............ ............................... 1 Fans................. ............................... 1 Plumbing 1=bdutres Lavatories........ ............................... 1 Sinks................ ............................... 1 Water Xow ts.. ............................... 1 r Water Heaters .. ............................... 1 \ - - W im CONDITIONS: 1. Attic area is not designed for use as storage. 2. Exterior canopy at north facade and screening of exterior mechanical equipment on roof and at west end of building must be installed, inspected and approved by planning division staff prior to issuance of certificate of occupancy. PIVIT EXPIRES Tuesday, April 30, 3 Permit Issued on Thursday, November 1, 2012 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the ccordan ith the laws, rules and regulations of the State of Washington an t e City of Federal Way. Owner or agent: Date: eftilding - Coinnrercial City of Federal Way Community & Econ. Dev. Services Permit #: 12- 104447 -00 -CO 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835 -2607 Fax: (253) 835 -2609 Inspection Request Line: (253) 835 -3050 � '': Project Name: FEDERAL WAY DISCOUNT GUNS & INDOOR RANGE Project Address: 1401 S 324TH ST Parcel Number: 150050 0140 Project Description: TI - Construct partition walls & finishes to create office, conference/training room & restroom for Phase H of project. Includes plumbing & mechanical. Owner Al2RIlcant Contractor Lender KILLY II LLC MIKE HOVLAND 6901 WATER STREET NE MOHAMMED & ANNA BAGHAI 6901 WATER ST NE HOVLAND ARCHITECTS TACOMA WA 98422 6901 WATER STREET NE FEDERAL WAY WA 98422 900 MERIDIAN AVE E SUITE 408 TACOMA WA 98422 MILTON WA 98354 Census Category: 437 - Commercial alt / add / conversion Includes: # 1 #2 #3 #4 Occupancy Class: B Construction Type: Type V - B Occupancy Loa& Floor Areas . ft. 2,615 0 0 0 Additional Permit Information Ducting............ ............................... 1 Fans................. ............................... 1 Lavatories........ ............................... 1 Showers........... ............................... 1 Sinks................ ............................... ` 1 Water Closets .. ............................... 1 Water Heaters.. ............................... 1 PERMIT EXPIRES Wednesday, March 27, 2013 Permit Issued on Friday, September 28, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the u . ill be ordanc i the laws, rules and regulations of the State of Washington and t ity of Federal Way. Owner or agent: Date: _�_�z THIS CARD IS TO MAIN ON -SITE 1 1, Al-, CITY OF • Construction In ection Record Federal Way INSPECTION REQUE TS: (253) 835 -3050 PERMIT #: 12- 104447 -00 -CO Address: 1401 S 324TH ST Project: KILLY II LLC FEDERAL WAY, WA 98003 -8443 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ SWM Precon Site Mtg (4400) E] Initial Erosion Control (4365) Final Electrical Approved Footings /Setback 0) By Approved By To be done prior to breaking ground By Approved to place co ete By Date By Date By D Interim Erosion Control (4370) Approved By Date El Insulation (4150) Approved to install wallboard By Date Final - Fire Depa t Ap oved By ate Final - Mec nical (4065) A roved By Date Plumbing Groundwork (4190) Slab/ ' crete Floor Approved to cover roved to place concrete *ter By ci . Date By ❑ Floor Sheathing (4105) hWlumbi Approved to install flooring Approved By Date /f B�� ( % Date Gas Pi g 12 Re -steel (4215) Final Electrical Approved Approved to place concrete or grout By Date By at By Underfloor Framing (4285) Pri r Approved to sheath floor By Date Electric lu ng & Mken ical g -i and Mechanical Rough -in (4165) Fire/Dra Approved By Date Interim Erosion Control (4370) Approved By Date El Insulation (4150) Approved to install wallboard By Date Final - Fire Depa t Ap oved By ate Final - Mec nical (4065) A roved By Date Plumbing Groundwork (4190) Slab/ ' crete Floor Approved to cover roved to place concrete *ter By ci . Date By ❑ Floor Sheathing (4105) hWlumbi Approved to install flooring Approved By Date /f B�� ( % Date ❑ Gas Pi g 12 Fire/Draft Stops (4095) Final Electrical Approved Approved t r leas t Approved By at By Date Pri r s g a Fr ing i sp do By Framing (4120) Electric lu ng & Mken ical g -i and Approved to insulate Fire/Dra inspect* st be signed -off and pprov l .3.4 By Date ypsu oard Nailing (4130) E] Suspended Ceiling Grid (4265) v o install mud & tape Approved to drop tile By Date By Date Final - Planning Final Erosion Control (4375) Approved Approved Date By Date Final - Plumbing (4075) Final - Building (4050) — Approved ---� Approved By Date By Date ❑ Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date THIS CARD IS TO MAIlY ON -SITE CITY r Construction In ectil Record Federal Way INSPECTION REQUE TS: (253) 835 -3050 PERMIT #: 12- 104447 -01 -CO Address: 1401 S 324TH ST Project: KILLY II LLC FEDERAL WAY, WA 98003 -8443 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read Ieft to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 M Precon Site Mtg (4 0) 0 Initial Erosion Control ( 365) Footings Setback ( 110) By Approved ByV To be done prior to breaking ground By Approved to place concrete By Date By Date By Date 0 Re -steel (4215) 0 Plumbing Groundwork (4190) Slab /Concrete Floor (4255) By Approved to place concrete or grout ByV Approved to cover By Approved to place concrete By Date By Date By Date 0 Underfloor Framing (4285) Floor Sheathing (4105) 0 Rough Plumbing (4230) Approved to sheath floor Approved to install flooring Approved By Date By Date By Date Mechanical Rough -in (4165) Gas Piping (4125) E] Fire/Draft Stops (4095) Approved Approved to release test Approved By Date , — By Date By Date Interim Erosion Control (4370) Framing (4120) Prior to scheduling a Framing inspection; Approved Electrical, Plumbing & Mechanical Rough -in Approved to insulate By Date F re/Draft Stop inspections must be signed -off ]and approved. IBC 1093.4 By N Date Gypsum Wallboard Nailing (4130) Insulation (4150) Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud & tape Approved to drop the By Date -- - By Date t �8- x '� B Date y Q. O % 0 Final -Fire Department (4060) Approved By Date By lion Control (4375) Final - Mechani, Approved Ap r Date By Date � 11 %1��2CJ Final - Plumbing (4075) Final - Building (4050) Approved J2_ By Approved ByV Date _ By Date `+ � 11 %1��2CJ Rough Electrical Approved Final Electrical Approved Right of Way �^ Approved By Date By Date By Date Federal WRECEIVED 0 PERMIT CDELPENT' SRVICESp p L I C A'T I O N 253 - 835 -25 tib� f] �% �(1� urwu__ �_afyi> frl eruau. -nil f !GI ii CITY OF FEDERAL WAY 0 -4 MFXO ME PL DE EN FP — OTCL SITE ADDRESS..,', CDS SUITEMNITM ,` 14o( Se)a4 5 e,+r� cs-xeer PROJECT VALUATION $ 1s4 coo ZONING ASSESSO�'3� /PARCM � � — . — — — — — — — — TYPE OF PERMIT DING UMBING ECHANICAL DEMOLITION ❑ ENGINEERING ❑ FIRE $REVELATION NAME OF PROJECT (Tenant Name /Homeowner Last Name) AgAtriv-, `s'1 191ACO `PT C2u8J s # `N06a ��� Iy,/t G PROJECT DESCRIPTIONitr . c M 36 Detailed description of work to be included on this permit only PROPERTY OWNER NAME w _ p� +� AIC1 1+0% PRIMARY PHONE , MAILING ADDRESS 1 antes 3 E-MAIL CITY STATE my,� 7i NAME PHONE MAILING ADDRESS E-MAIL CONTRACTOR CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE M EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE 8 NAM; �7 * 1: L- • d-vLA"6+V i'� � r V-03, T � 7' • P T� � APPLICANT MAILING ADDRESS 4 T E-MAIL MjGF '�• J�'"�Y,��V rrK1I. CITY of I GTo N STATE W'^ ZIP �a'..5� E5'F FAX 1.35 , c`St 1.3 110 0 PROJECT CONTACT (The individual to receive and respond to all correspondence NAME 0- A$ PHONE MAILING ADDRESS E -MAIL concerning this application) CITY STATE ZIP FAX ALTERNATE CONTACT NAME: PHONE E -MAIL PROJECT FINANCING NAME �+ t ter"► ❑ OWNER- FINANCED Required value of $5,000 or more (RCW 19.27.095) ,CY MAILING ADDRESS, CITY, STATE, ZIP PHONE 1 certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I wtll comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim . es o the r e of the city, including its officers and employees, upon the accuracy of the information supplied to th part o .t s a fication. A /� SIGNATURE: DATE�� PRINT NAME: �• fitellGl3Nl� ^,4GY Bulletin #100 —January 1, 2011 Page I of 3 k: \Handouts\Permit Application VALUE OF MECHAMCAL WORK Indicate how many of each type off AIR HANDLING UNITS _ AIR CONDITIONER _ BOILERS _ COMPRESSORS _ DUCTING (a copy of bid or estimate must be provided) Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. BATHTUBS (or Tub /Shower combo) LAVS (Hand Sinks( �_ TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) PRA INS ., (� SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS ilNKS (Kitchen /ytditA;. WATER HEATERS (eiectrict -HOSE BIBBS SUMPS WASHING MACHINES AREA DESCRIPTION Area in Square Feet ADDITION AREA DESCRIPTION Area in Sauare Feet TENANT AREA ONLY I t tiy Construction # of * e ? __ Additional Information Occupancy Group(s) Occupancy Group(s) Construction # of Additional Information Type I Stories NJ 10 1 ! Bulletin #100— January 1, 2011 Page 2 of 3 k:\Handouts \Permit Application