Project Name: FEDERAL WAY DISCOUNT GUNS & INDOOR RANGE
Project Address: 1401 S 324TH ST
Parcel Number: 150050 0140
Project Description: TI - Phase 2 of Project; Construct a new interior second floor for new office, restroom, and
attic area. Install partition walls & finishes, and includes plumbing & some minor
mechanical work.
Owner
KILLY II LLC
Aq licant
MIKE HOVLAND
Contractor
6901 WATER STREET NE
Lender
MOHAMMED & ANNA BAGHAI
6901 WATER ST NE
HOVLAND ARCHITECTS
TACOMA WA 98422
6901 WATER STREET NE
FEDERAL WAY WA 98422
900 MERIDIAN AVE E SUITE 408
Construction Type:
TACOMA WA 98422
MILTON WA 98354
Occupancy Load-
Census Category: 437 - Commercial alt / add / conversion
Includes:
# 1
#2
#3
#4
Occupancy Class:
B
Construction Type:
Type V - B
Occupancy Load-
Floor Areas . ft.
2,615
1 0
0
1 0
New / Additional Sq. Feet - 2nd Floor ...................836.9
Mechanical to be Included ? ....... ............................Yes
Permit for Building Shell Only9 .............................No
New / Additional Sq. Feet - Total .......................... 837
Zoning Designation .................. .............................BC
Existing Sprinkler System in Building? .................No
Number of Stories ................... ..............................1
Plumbing to be Included? ....................................... es
Occupancy # 1- Use ................ ............................... Professional
Services/Offices
Ducting............ ............................... 1 Fans................. ............................... 1
Plumbing 1=bdutres
Lavatories........ ............................... 1 Sinks................ ............................... 1 Water Xow ts.. ............................... 1
r
Water Heaters .. ............................... 1 \ - - W im
CONDITIONS:
1. Attic area is not designed for use as storage.
2. Exterior canopy at north facade and screening of exterior mechanical equipment on roof and at west end of
building must be installed, inspected and approved by planning division staff prior to issuance of certificate of
occupancy.
PIVIT EXPIRES Tuesday, April 30, 3
Permit Issued on Thursday, November 1, 2012
1 hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the ccordan ith the laws, rules and regulations of the State of Washington
an t e City of Federal Way.
Owner or agent: Date:
eftilding - Coinnrercial
City of Federal Way
Community & Econ. Dev. Services Permit #: 12- 104447 -00 -CO
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835 -2607 Fax: (253) 835 -2609 Inspection Request Line: (253) 835 -3050
� '':
Project Name: FEDERAL WAY DISCOUNT GUNS & INDOOR RANGE
Project Address: 1401 S 324TH ST
Parcel Number: 150050 0140
Project Description: TI - Construct partition walls & finishes to create office, conference/training room &
restroom for Phase H of project. Includes plumbing & mechanical.
Owner
Al2RIlcant
Contractor
Lender
KILLY II LLC
MIKE HOVLAND
6901 WATER STREET NE
MOHAMMED & ANNA BAGHAI
6901 WATER ST NE
HOVLAND ARCHITECTS
TACOMA WA 98422
6901 WATER STREET NE
FEDERAL WAY WA 98422
900 MERIDIAN AVE E SUITE 408
TACOMA WA 98422
MILTON WA 98354
Census Category: 437 - Commercial alt / add / conversion
Includes:
# 1
#2
#3
#4
Occupancy Class:
B
Construction Type:
Type V - B
Occupancy Loa&
Floor Areas . ft.
2,615
0
0
0
Additional Permit Information
Ducting............ ............................... 1 Fans................. ............................... 1
Lavatories........ ............................... 1 Showers........... ............................... 1 Sinks................ ............................... ` 1
Water Closets .. ............................... 1 Water Heaters.. ............................... 1
PERMIT EXPIRES Wednesday, March 27, 2013
Permit Issued on Friday, September 28, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the u . ill be ordanc i the laws, rules and regulations of the State of Washington
and t ity of Federal Way.
Owner or agent: Date:
_�_�z
THIS CARD IS TO MAIN ON -SITE
1 1, Al-, CITY OF • Construction In ection Record
Federal Way INSPECTION REQUE TS: (253) 835 -3050
PERMIT #: 12- 104447 -00 -CO Address: 1401 S 324TH ST
Project: KILLY II LLC FEDERAL WAY, WA 98003 -8443
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
❑
SWM Precon Site Mtg (4400)
E]
Initial Erosion Control (4365)
Final Electrical
Approved
Footings /Setback 0)
By
Approved
By
To be done prior to breaking ground
By
Approved to place co ete
By
Date
By
Date
By
D
Interim Erosion Control (4370)
Approved
By Date
El Insulation (4150)
Approved to install wallboard
By Date
Final - Fire Depa t
Ap oved
By ate
Final - Mec nical (4065)
A roved
By Date
Plumbing Groundwork (4190) Slab/ ' crete Floor
Approved to cover roved to place concrete
*ter
By ci . Date By
❑ Floor Sheathing (4105) hWlumbi
Approved to install flooring Approved
By Date /f B�� ( % Date
Gas Pi g 12
Re -steel (4215)
Final Electrical
Approved
Approved to place concrete or grout
By
Date
By
at
By
Underfloor Framing (4285)
Pri r
Approved to sheath floor
By
Date
Electric
lu ng & Mken ical g -i and
Mechanical Rough -in (4165)
Fire/Dra
Approved
By
Date
Interim Erosion Control (4370)
Approved
By Date
El Insulation (4150)
Approved to install wallboard
By Date
Final - Fire Depa t
Ap oved
By ate
Final - Mec nical (4065)
A roved
By Date
Plumbing Groundwork (4190) Slab/ ' crete Floor
Approved to cover roved to place concrete
*ter
By ci . Date By
❑ Floor Sheathing (4105) hWlumbi
Approved to install flooring Approved
By Date /f B�� ( % Date
❑
Gas Pi g 12
Fire/Draft Stops (4095)
Final Electrical
Approved
Approved t r leas t
Approved
By
at
By
Date
Pri r
s g a Fr ing i sp do
By
Framing (4120)
Electric
lu ng & Mken ical g -i and
Approved to insulate
Fire/Dra
inspect* st be signed -off and
pprov l .3.4
By
Date
ypsu oard Nailing (4130)
E]
Suspended Ceiling Grid (4265)
v o install mud & tape
Approved to drop tile
By
Date
By
Date
Final - Planning
Final Erosion Control (4375)
Approved
Approved
Date
By
Date
Final - Plumbing (4075)
Final - Building (4050)
—
Approved
---� Approved
By
Date
By
Date
❑
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date
THIS CARD IS TO MAIlY ON -SITE
CITY r Construction In ectil Record
Federal Way INSPECTION REQUE TS: (253) 835 -3050
PERMIT #: 12- 104447 -01 -CO Address: 1401 S 324TH ST
Project: KILLY II LLC FEDERAL WAY, WA 98003 -8443
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read Ieft to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0
M Precon Site Mtg (4 0)
0
Initial Erosion Control ( 365)
Footings Setback ( 110)
By
Approved
ByV
To be done prior to breaking ground
By
Approved to place concrete
By
Date
By
Date
By
Date
0
Re -steel (4215)
0
Plumbing Groundwork (4190)
Slab /Concrete Floor (4255)
By
Approved to place concrete or grout
ByV
Approved to cover
By
Approved to place concrete
By
Date
By
Date
By
Date
0
Underfloor Framing (4285)
Floor Sheathing (4105)
0
Rough Plumbing (4230)
Approved to sheath floor
Approved to install flooring
Approved
By
Date
By
Date
By
Date
Mechanical Rough -in (4165)
Gas Piping (4125)
E]
Fire/Draft Stops (4095)
Approved
Approved to release test
Approved
By
Date , —
By
Date
By
Date
Interim Erosion Control (4370)
Framing (4120)
Prior to scheduling a Framing inspection;
Approved
Electrical, Plumbing & Mechanical Rough -in
Approved to insulate
By
Date
F re/Draft Stop inspections must be signed -off ]and
approved. IBC 1093.4
By
N Date
Gypsum Wallboard Nailing (4130)
Insulation (4150)
Suspended Ceiling Grid (4265)
Approved to install wallboard
Approved to install mud & tape
Approved to drop the
By
Date
-- -
By
Date
t �8- x '�
B Date
y Q. O %
0 Final -Fire Department (4060)
Approved
By Date By
lion Control (4375) Final - Mechani,
Approved Ap r
Date By Date
� 11 %1��2CJ
Final - Plumbing (4075)
Final - Building (4050)
Approved
J2_
By
Approved
ByV
Date _
By
Date `+
� 11 %1��2CJ
Rough Electrical
Approved
Final Electrical
Approved
Right of Way �^
Approved
By
Date
By
Date
By
Date
Federal WRECEIVED 0 PERMIT
CDELPENT' SRVICESp p L I C A'T I O N
253 - 835 -25 tib� f] �% �(1� urwu__ �_afyi> frl eruau. -nil f !GI ii
CITY OF FEDERAL WAY
0 -4
MFXO ME PL DE EN FP
— OTCL
SITE ADDRESS..,', CDS
SUITEMNITM
,` 14o( Se)a4 5 e,+r� cs-xeer
PROJECT VALUATION
$ 1s4 coo
ZONING
ASSESSO�'3� /PARCM � � —
. — — — — — — — —
TYPE OF PERMIT
DING UMBING ECHANICAL
DEMOLITION ❑ ENGINEERING ❑ FIRE $REVELATION
NAME OF PROJECT
(Tenant Name /Homeowner Last Name)
AgAtriv-, `s'1 191ACO `PT C2u8J s # `N06a ��� Iy,/t G
PROJECT DESCRIPTIONitr
. c M 36
Detailed description of work to
be included on this permit only
PROPERTY OWNER
NAME w _
p� +� AIC1 1+0%
PRIMARY PHONE ,
MAILING ADDRESS
1 antes 3
E-MAIL
CITY
STATE
my,� 7i
NAME
PHONE
MAILING ADDRESS
E-MAIL
CONTRACTOR
CITY
STATE
ZIP
FAX
WA STATE CONTRACTOR'S LICENSE M
EXPIRATION DATE
FEDERAL WAY BUSINESS LICENSE 8
NAM; �7 * 1: L- • d-vLA"6+V i'� � r
V-03, T � 7' • P T� �
APPLICANT
MAILING ADDRESS 4
T
E-MAIL MjGF '�• J�'"�Y,��V
rrK1I.
CITY
of I GTo N
STATE
W'^
ZIP
�a'..5� E5'F
FAX
1.35 , c`St 1.3 110 0
PROJECT CONTACT
(The individual to receive and
respond to all correspondence
NAME
0- A$
PHONE
MAILING ADDRESS
E -MAIL
concerning this application)
CITY
STATE
ZIP
FAX
ALTERNATE CONTACT NAME:
PHONE
E -MAIL
PROJECT FINANCING
NAME �+ t ter"►
❑ OWNER- FINANCED
Required value of $5,000 or more
(RCW 19.27.095)
,CY
MAILING ADDRESS, CITY, STATE, ZIP
PHONE
1 certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I wtll comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim . es o the r e of the city, including its officers and employees, upon the accuracy of the
information supplied to th part o .t s a fication.
A /�
SIGNATURE: DATE��
PRINT NAME: �• fitellGl3Nl� ^,4GY
Bulletin #100 —January 1, 2011 Page I of 3 k: \Handouts\Permit Application
VALUE OF MECHAMCAL WORK
Indicate how many of each type off
AIR HANDLING UNITS _
AIR CONDITIONER _
BOILERS _
COMPRESSORS _
DUCTING
(a copy of bid or estimate must be provided)
Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain.
BATHTUBS (or Tub /Shower combo)
LAVS (Hand Sinks(
�_ TOILETS
WATER PIPING
DISHWASHERS
RAINWATER SYSTEMS
URINALS
OTHER (Describe)
PRA INS ., (�
SHOWERS
VACUUM BREAKERS
DRINKING FOUNTAINS
ilNKS (Kitchen /ytditA;.
WATER HEATERS (eiectrict
-HOSE BIBBS
SUMPS
WASHING MACHINES
AREA DESCRIPTION Area
in Square Feet
ADDITION
AREA DESCRIPTION Area
in Sauare Feet
TENANT AREA ONLY I t tiy
Construction # of
* e ? __ Additional Information
Occupancy Group(s)
Occupancy Group(s)
Construction # of Additional Information
Type I Stories
NJ 10 1 !
Bulletin #100— January 1, 2011 Page 2 of 3 k:\Handouts \Permit Application