Loading...
12-103368C. , 0 City of Federal Way MARILYN J POWERS Community & Econ. Dev. Services 333 8th Ave S PACIFIC AIR SYSTEMS (ELECTRICAL) W Federal Way, WA 98003 FILE Ph: (253) 835 -2607 Fax: (253) 835 -2609 FEDERAL WAY WA Project Name: POWERS Project Address: 30425 MILITARY RD S Project Description: CIRCUITS FOR HEAT PUMP 0 glect%ical Permit #: 12- 103368 -00 -EL Inspection Request Line: (253) 835 -3050 Parcel Number: 092104 9220 Owner Ap lig cant Contractor MARILYN J POWERS WESCO NORTHWEST PERMIT PACIFIC AIR SYSTEMS (ELECTRICAL) 30425 MILITARY RD S NORTHWEST PERMIT / WESCO PACIFAS912RQ (12/17/13) FEDERAL WAY WA 1345 W GULF RD 12811 PACIFIC HWY S 98003 POINT ROBERTS WA 98281 LAKEWOOD WA 98023 Additional Permit Information Is Use Educational or Institutional ? .......................No Electrical Fixtures Circuits - Residential ...................... 2 PERMIT EXPIRES Wednesday, July 23, 2014 Permit Issued on Monday, July 23, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: PIA / 4 / 10/31 IL CITY OF Federal Way • THIS CARD IS TO IN ON -SITE Construction In rection Record INSPECTION REQUE (253) 835 -3050 PERMIT #: 12- 103368 -00 -EL Address: 30425 MILITARY RD S Project: MARILYN J POWERS FEDERAL WAY, WA 98003 -4852 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 11—� Rough Electrical (4225) Ceiling Cover (4020) Final Electrical Approved Final - Electrical (4055) Approved By Approved Approved By Date By Date By Date (6 11—� Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date