12-105181A
City of Federal Way
Community & Econ. Dev. Services
33325 8th Ave S
Federal Way, WA 98003
Ph: (253) 835 -2607 Fax: (253) 835 -2609
• 1 11
FILE
0 Plumbing
Permit #: 12- 105181 -00 -PL
Inspection Request Line: (253) 835 -3050
Project Name: JONES
Project Address: 2132 S 286TH ST
Project Description: REMOVE AND REPLACE ELECTRIC WATER HEATER
3 00-7 X
Parcel Number: 422210 0370
Owner
ARRI11can
Contractor
WILLIAM A JONES
JESSICA VARON
FAST WATER HEATER CO (GENERAL)
2132 S 286TH ST
FAST WATER HEATER COMPANY
FASTWWH948BC (1/4/14)
FEDERAL WAY, WA 98003
12601 132ND AVE NE
12601 132ND AVE NE
KIRKLAND WA 98034
KIRKLAND WA 98034
Plumbing Fixtures
Water Heaters .. ............................... 1
PERMIT EXPIRES Monday, May 13, 2013
Permit Issued on Wednesday, November 14, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: ^1LIN OIL ffign Date:
FINALED
I I /e& /1 ?00
CITY OF
Federal Way
PERMIT #:
12- 105181 -00 -PL
THIS CARD IS TO MAIN ON- SITE +"
Construction In ection Record
INSPECTION REQUE TS: (253) 835 -3050
Address: 2132 S 286TH ST
Project: WILLIAM A JONES FEDERAL WAY, WA 98003 -3321
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Final - Plumbing (4075)
Approved
B Date I_
Plumbing Groundwork (4190)
0
Rough Plumbing (4230)
Final Electrical
Approved
Gas Piping (4125)
Approved to cover
By
Approved
Approved to release test
By
Date
By
Date
By
Date
Final - Plumbing (4075)
Approved
B Date I_
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date