Loading...
12-105181A City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835 -2607 Fax: (253) 835 -2609 • 1 11 FILE 0 Plumbing Permit #: 12- 105181 -00 -PL Inspection Request Line: (253) 835 -3050 Project Name: JONES Project Address: 2132 S 286TH ST Project Description: REMOVE AND REPLACE ELECTRIC WATER HEATER 3 00-7 X Parcel Number: 422210 0370 Owner ARRI11can Contractor WILLIAM A JONES JESSICA VARON FAST WATER HEATER CO (GENERAL) 2132 S 286TH ST FAST WATER HEATER COMPANY FASTWWH948BC (1/4/14) FEDERAL WAY, WA 98003 12601 132ND AVE NE 12601 132ND AVE NE KIRKLAND WA 98034 KIRKLAND WA 98034 Plumbing Fixtures Water Heaters .. ............................... 1 PERMIT EXPIRES Monday, May 13, 2013 Permit Issued on Wednesday, November 14, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ^1LIN OIL ffign Date: FINALED I I /e& /1 ?00 CITY OF Federal Way PERMIT #: 12- 105181 -00 -PL THIS CARD IS TO MAIN ON- SITE +" Construction In ection Record INSPECTION REQUE TS: (253) 835 -3050 Address: 2132 S 286TH ST Project: WILLIAM A JONES FEDERAL WAY, WA 98003 -3321 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Final - Plumbing (4075) Approved B Date I_ Plumbing Groundwork (4190) 0 Rough Plumbing (4230) Final Electrical Approved Gas Piping (4125) Approved to cover By Approved Approved to release test By Date By Date By Date Final - Plumbing (4075) Approved B Date I_ Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date