Loading...
09-103603• • Building - Single Family City of Federal way .//,� Community Development Services permit #: 09-103603-00-SF P.O. Box 9718 Federal Way, WA 98063 -9718 Inspection Request Line: 253 835 -3050 Ph: (253) 835 -2607 Fax: (253) 835 -2609 p q Project Name: CHENN Project Address: 1089 SW 330TH CT Parcel Number: 926495 0270 Project Description: REP - Reroofing to include tear off, plywood and new 50 year comp w er A Lend r WHYLIE N ASSU OR I S Occuparify s 1538 QUAIL CA ON 127E V 0 /10) RF LOGAN UT 8 2 6 PUYA 837 onstru on 8 l I Censut Category: 555 - Non- struiturl roofi% permits s Incl I dQrJT6- #2 #3 #4 Occuparify s onstru on cu anc Load: Areas New / AddidoW 4 tied 4 3rd Floor,,, rr ...........! Mechanical to �6"Thdl Ml ......... „,A„ ....... No l bdures As so i "ted With This Kermit t! PERMIT EXPIRES Tuesday, March 16, 2010 Permit Issued on Thursday, September 17, 2009 ......,,,........ .... I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. D c- q -/7-0? Owner or agent: ate: le- f CITY OF Federal Way PERMIT #: Owner: THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835 -3050 09- 103603 -00 -SF Address: 1089 SW 330TH CT WHYLIE CHENN FEDERAL WAY, WA 98023 -5327 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Floor Sheathing (4105) Approved to install flooring SWM Precon Site Mtg (4400) Roof Sheathing (421 Approved to install roofing Initial Erosion Control (4365) Date Underfloor Framing (4285) Date Approved Dateeq l-7 To be done prior to breaking ground Approved to install wallboard Approved to sheath floor By Date By Date By Date Floor Sheathing (4105) Approved to install flooring Shear Walls (4245) Approved to install siding Roof Sheathing (421 Approved to install roofing By Date By Date By Dateeq l-7 Fire/Draft Stops (4095) Interim Erosion Control (4370) rior to scheduling a Framing inspection; Approved Approved Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and By Date By Date approved. IBC 109.3.4 Framing (4120) Insulation (4150) E] Gypsum Wallboard Nailing (4130) Approved to insulate By Date Approved to install wallboard Approved to install mud & tape By Date By By Date By Date Final Erosion Control (4375) Final - Building (4050) Approved Approved By Date By Date Rough Electrical Approved Final Electrical Approved Right of Way —^ Approved By Date By Date By Date v Value of Mechanical Work $ A COPY OF BID OR ESTIMATE MUST BE PROVIDED Indicate number of each type offixture to be installed or relocated as part of this project, Do not include exisdngfixtures to remain AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER (Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS pommmeio BOILERS FURNACES HOT WATER TANKS (c.* COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES Bulletin #100 — 4/17/2009 Page 2 of 4 k:\Handouts\Permit Application