Loading...
09-102589City of Federal Way Community Development services P.O. Box 9718 Federal Way, WA 98063 -9718 Ph: (253) 835 -2607 Fax: (253) 835 -2609 Project Name: POPE Project Address: 30544 7TH AVE SW Project Description: ADD - Installation of 15' above ground pool Building - Single Fairsily Permit #: 09- 102589 -00 -SF Inspection Request Line: (253) 835 -3050 Parcel Number: 178880 0730 Owner Applicant Co ac r Lender JAMES W POPE JR JAMES W POPE JR 3 7 W PAULA J POPE 30544 7 AV SW FE ERA W W 98 39 30544 7TH AVE SW FED AY WA 8023- 2 FEDERAL WAY WA 98023 -3922 1000, 1 0 1 0 � Y Census Cate ry: 43 - ; al alt /a ; �o ihans in number of units Includes: #2 #4 Occupancy Class: Construction Type: fl 221.0 anc Load: 14 Floor Areas . ft.) 0 1 0 0 0 New/ Additional Sq, Feet -I st Floor . 0 New / Additional Sq. Feet - 3rd Floor ....................0 New / Additional Sq. Feet - Deck .......................... 0 Mechanical to be Included? ....... .............................No Plumbing to be Included?... .......... ......................... No New / Additional Sq. Feet - Garage ....................... 0 New / Additional Sq. Feet - Other ..........................0 New / Additional Sq. Feet - Total .......................... aPIA Ncr Plxtures AsSC� c�l�lIth This Permit l� CONDITIONS: Subject to field inspection with plans. PERMIT EXPIRES Monday, January 4, 2010 Permit Issued on Wednesday, July 8, 2009 0 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. q Owner or agent: Date: �ZL-fle / THIS CARD IS TO REMAIN ON-SITE rrroF~i Construction Inspection Record Federal Way INSPECTION REQUE -TS: (253) 835 -3050 PERMIT #: 09- 102589 -00 -SF Address: 30544 7TH AVE SW Owner: JAMES W POPE JR- FEDERAL WAY, WA 98023 -3922 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Foundation Wall (4115) Approved to place concrete By Date Drainage/Downspout (4040) Approved to backfill By Date SWM Precon Site Mtg (44 0) Underfloor Framing (4285) Initial Erosion Control (4365) 0 Footings /Setback (4110) _ Approved Approved to sheath floor To be done prior to breaking ground Approved to place concrete By Date By Date By Date Foundation Wall (4115) Approved to place concrete By Date Drainage/Downspout (4040) Approved to backfill By Date Roof Sheathing (4220) Approved to install roofing By Date Prior to scheduling a Framing.inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date 0 Fire/Draft Stops (4095) Underfloor Framing (4285) Approved 0 Floor Sheathing (4105) _ Approved to sheath floor Framing (4120) Approved to install flooring By By Date By Date Roof Sheathing (4220) Approved to install roofing By Date Prior to scheduling a Framing.inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 109.3.4 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date 0 Fire/Draft Stops (4095) Approved By Date Framing (4120) Approved to insulate By Date Final Erosion Control (4375) Approved By. Date Slab /Concrete Floor (4255) Approved to place concrete By Date r Shear Walls (4245) Approved to install siding By Date ri Interim Erosion Control (4370) Approved By Date Insulation (4150) Approved to install wallboard By Date Final - Building (4050)' Approved By Date For inspector reference only 0 Rough Electrical D FINAL - Electrical Approved Approved By Date By Date or k Value of Mechanical Work $ A COPY OF BID OR ESTIMATE MUST BE PROVIDED Indicate number of each type offixture to be installed or relocated as part of this project, Do not include eidstingfixtures to remain. AIR HANDLING UNITS FANS - GAS PIPE OUTLETS OTHER (Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS (commuaa4 BOILERS FURNACES HOT WATER TANKS I* COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES Indicate number of each type of fixture to be installed or relocated as part of this project, Do not include existingfixturestoremaim BATHTUBS (arTub /sbanrr combo) LAVS (Hand Sbs4 TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS (Kitcbm /un7h}) WATER HEATERS HOSE BIBBS SUMPS WASHING MACHINES �drAhlLIIREB= Bulletin #100 — 4/17/2009 Page 2 of 4 k:\HandoutslPennit Application ft if r of elG FILE FINAL INSPECTION REQUIRED UPON COMPLETION OF WORK #7 /cos� Wz)/