Loading...
06-105295FILE 1�k YCITY of CITY HALL Fe d e ra I Wa 33325 8th Avenue South Mailing Address: PO Box 9718 Federal Way, WA 98063 -9718 (253) 835 -7000 www. cityottederalway. com October 27, 2006 Had inder Atwal Redondo Shell Station 28806 Pacific Hwy South Federal Way, WA 98003 RE: File #06- 105295- 00 -AD; RESPONSE TO INQUIRY Redondo Shell Espresso, 28806 Pacific Hwy South, Federal Way Dear Hai jinder Atwal: The City of Federal Way received a letter from you inquiring about what is required for you to establish a drive - through espresso on the south side of the convenience store. The site is located at 28806 Pacific Highway South and is developed with a Shell gas station and convenience store. I am enclosing the chart for the BC zone. I have reviewed your proposal to see what is required by the Federal Way City Code (FWCC). The required review process is Process II. (The Process II checklist is enclosed.) You must turn in a site plan of the existing conditions, a site plan of the proposal, building elevations of the proposal, photographs of the site, and a landscape plan (if the landscaping is going to change significantly). The site plan must accurately depict the property lines and exact location of structures on the site. Zoning and Use Classification. The site is located in a Community Business (BC) Zone. The primary use of the site would fall into the category of "vehicle service station or car wash" per the zoning chart in FWCC 22 -754. A drive- through espresso window would fall into the category of "fast food restaurant' per the zoning chart in FWCC 22 -753. The drive - through proposal is subject to Process II, Site Plan Approval. 2. Process. A master land use application form and a Process II handout are enclosed. There is no public notice for Process II. The Director of Community Development Services will.make the land use decision. The decision may be appealed to the Hearing Examiner. 3. Fees. The 2006 fee for land use Process His $1,824. This includes review by the Planning Division, Public Works Department, and Fire Department. The building permit fee is separate. 4. Nonconformance. Your site is nonconforming, at least in regard to landscaping. However, it does not appear that your proposed espresso window triggers improvements due to nonconforming development, per FWCC 22 -334. Landscaping. In the BC zone, a five- foot -wide strip of Type III landscaping (trees, shrubs, and groundcover) would normally be required along the right -of -way and along all perimeter lot lines. However, as mentioned, you are not required to install these landscaping strips, since your proposal is not enough to trigger significant improvements, per the nonconformance article of the code. Harjinder Atwal October 27, 2006 Page 2 6. Traffic Flow. Access to and from the drive - through facility must be approved by the Public Works Department. I have checked with Maryanne Zukowski, a traffic engineer in the Public Works Department, to see what that department will require. You must submit a Traffic Impact Analysis (TIA) which addresses circulation, queuing, and PM peak hour trips. If you have questions about traffic issues, please contact Maryanne Zukowski at 253- 835 -2742. 7. Parking Count. You must provide parking calculations on the site plan. Pursuant to the development regulations of FWCC 22 -753, fast food restaurants require one parking space for each 80 square feet of building. This would apply to the portion of the building dedicated to espresso service. For the main portion of the building, which is considered vehicle service station, the zoning chart in FWCC 22 -754 states that the required number of parking spaces is determined on a case -by -case basis. Therefore, you will need to submit a parking study prepared by a traffic engineer, in order to determine the overall parking needs for the site and proposal, and to determine if the site is currently conforming or nonconforming in regard to parking standards. If you have questions about preparing a parking study, please contact Maryanne Zukowski at 253- 835 -2742. 8. Accessible Parking Spaces. If not already provided on the site, one handicap accessible space is required by the International Building Code. Please refer to the enclosed requirements for handicap accessible parking spaces. 9. Community Design Guidelines. Your site is subject to FWCC Chapter 22, Article XIX, Community Design Guidelines. However, the Code states, "Subject applications for remodeling or expansion of existing developments shall meet only those provisions of this article that are determined by the Director to be reasonably related and applicable to the area of expansion or remodeling." [FWCC 22- 1632.] 10. Building Design. Please provide elevation drawings of all four sides of the building, as well as a floor plan that clearly indicates the floor area which is devoted to the espresso service. Please keep in mind that the Community Design Guidelines (FWCC Section 22, Article XIX) state, "Project designers shall strive for overall design continuity by using similar elements throughout the project such as architectural style and features, materials, colors, and textures." Please provide color photographs of the existing site, including all four sides of the building. In addition to the items mentioned above, please make sure that all required zoning information and dimensions are provided on the plans you submit. Please submit six full -size sets of the plans and four sets reduced to 11 x 17 inches. Sincerely, Andy Bergsagel Planner enc: Master Land Use Application Form Process 11 checklist Requirements for handicap accessible parking spaces Zoning Chart pages 06- 105295 Doc. I. D. 38541 October 10, 2006 Greg Fewins Deputy Director of Community Development Service 33325 8t` Avenue South PO Box 9718 Federal Way WA 98063 Dear Mr. Greg Fewins, OOMMUNITYDEVELEpIPMEB DEPARTMENT OCT 13 2006 Annnrex Inc. Redondo Shell 28806 Pacific Hwy S Federal Way WA 98003 Tel: 206 - 371 -7182 Fax: 253-839-5969 I am writing to you to request for your approval of a new proposal concerning the amenities of the premises. I would like to establish a drive through espresso services on the south side of the convenience store. I have enclosed a map illustrating the layout of the convenience store; pump islands, three entrance /exits and the dimensions of the premises. Entrance would be from the 288th street entrance /exit, and the proposed arrangement would be that customers would drive around the back of the convenience store building going south, and after utilizing the service, exit on to Pacific Hwy S. I am grateful for your time and effort in considering this proposal and if successful may you inform me of the details that are required to process the planning of the espresso service. Yours truly, HarJinder Atwal Owner/President Y I r r c c W N M r cn O N fA C C W VI a pt Am c N