09-1049904
• t
City of Federal Way
Community Development Services
P.O. Box 9718
Federal Way, WA 98063 -9718
Ph: (253) 835 -2607 Fax: (253) 835 -2609
FILE Building - Commercial
Permit #: 09- 104990 -00 -CO
Inspection Request Line: (253) 835 -3050
Project Name: FEDERAL WAY COMMUNITY CENTER - KINETIC ART RELOCATION
Project Address: 876 S 333RD ST Parcel Number: 172104 9138
Project Description: ADD - Relocate kinetic art sculpture to Community Center site in accordance with
engineering.
Owner
Anglicant
Contractor
Lender
CITY OF FEDERAL WAY
STEVE IKERD
CITY OF FEDERAL WAY
PO BOX 9718
CITY OF FEDERAL WAY - PARKS
PO BOX 9718
FEDERAL WAY WA 98063 -9718
33325 8TH AVE S
FEDERAL WAY WA 98063 -9718
Occu anc Load:
FEDERAL WAY WA 98023
Census Category: 999 - Unknown
Includes:
# 1
#2
#3
#4
Occupancy Class:
Construction Type:
Occu anc Load:
Floor Areas . ft.
0
0
T 0
0
Permit for Building Shell Only ?...... ..............
New / Additional Sq. Feet - Total .........................
PERMIT EXPIRES Sunday, July 25, 2010
Permit Issued on Tuesday, January 26, 2010
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way. }}
Owner or agent: - Date: t Z(�, `
F►Nkult;� l?ilL3/tG
- . M&
CITY OF
Federal Way
PERMIT #:
Owner:
THIS CARD IS TO RE ON -SITE
10 Construction Insp ion Record
INSPECTION REQUESTS: (253) 835 -3050
09- 104990 -00 -CO Address: 876 S 333RD ST
CITY OF FEDERAL WAY FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Shear Walls (4245)
Approved to install siding
By Date
Interim Erosion Control (4370)
Approved
By Date
Insulation (4150)
Approved to install wallboard
By Date
Roof Sheathing (4220)
Approved to install roofing
By Date
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
E] Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
❑
SWM Precon Site Mtg (4400)
0
Initial Erosion Control (4365)
Drainage/Downspout (4040)
Footings/ etback (4110)
Final - Public Works (4080)
Approved
E]
To be done prior to breaking ground
Approved
Approved to place concrete
By
Date
By
Date
By
/�L Date 2l3 /Zoe a
Shear Walls (4245)
Approved to install siding
By Date
Interim Erosion Control (4370)
Approved
By Date
Insulation (4150)
Approved to install wallboard
By Date
Roof Sheathing (4220)
Approved to install roofing
By Date
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
E] Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
❑
Foundation Wall (4115)
0
Approved
Drainage/Downspout (4040)
Date
Final - Public Works (4080)
Re -steel (4215)
E]
Approved to place concrete
Approved
Approved to insulate
Approved to backfill
Date
By
Approved to place concrete or grout
By
Date
By
Date
By
Date
Slab /Concrete Floor (4255)
Underfloor Framing (4285)
Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
Approved to install flooring
By
Date
By
Date
By
Date
Shear Walls (4245)
Approved to install siding
By Date
Interim Erosion Control (4370)
Approved
By Date
Insulation (4150)
Approved to install wallboard
By Date
Roof Sheathing (4220)
Approved to install roofing
By Date
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 109.3.4
E] Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
By Date
❑
Fire/Draft Stops (4095)
0
Approved
By
Date
Final - Public Works (4080)
Right of Way
Approved
E]
Framing (4120)
Approved
Approved to insulate
By
Date
Suspended Ceiling Grid (4265)
Approved to drop tile
By Date
Final Erosion Control (4375) Final - Building (4050)
Approved Approved
By Date y Date Z, 7-3 11
Final - Fire Department (4060)
0
Final - Planning (4070)
Final Electrical
Approved
Final - Public Works (4080)
Right of Way
Approved
Approved
Date
Approved
By
Date
Approved
By
Date
By
Date
By
Date
Final Erosion Control (4375) Final - Building (4050)
Approved Approved
By Date y Date Z, 7-3 11
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date
C1" OF
Fe deral Way *PERMIT S F CO ME EL PL DE EN FP
Fe
COMMUNITY SERVICES
253- 835 -2607- F AX 253-8 35 -2609 APPLICATION
www.cituoffeder(ilwau.com
Bulletin 4100 — January 1, 2010 Page] of 4 k:\Handouts\Permit Application