Loading...
09-104083V . `� , Building - !: o>c>�mercial City of FedrrahWay '� • Community Development Services P r4lit #. 09- 104083-00 -C P.O. Box 9718 e Federal Way, WA 98063 -9718 Ph: (253) 835 -2607 Fax: (253) 835 -2609 Inspection Request Line: (253) 835 -3050 Project Name: CWT HARVEST BREAD CO Project Address: �';S$ S 320TH ST - Parcel Number: 092104 9208 Project Description: TI - Improvements to interior for new tenant including partition walls, doors and accessible restrooms. Includes plumbing; mechanical on separate permit. Owner Am)licant Contractor Lender SEATAC VILLAGE SHOPPING VICKI SOMPPI S G FOUST CONSTRUCTION INC SEATAC VILLAGE SHOPPING CENTER CONNELL. DESIGN GROUP SGFOUGF91 IKJ (5/11/11) CENTER PO BOX 2708 22002 64TH AVE W 23502 25TH DR SE PO BOX 2708 PORTLAND OR 97208 -2708 MOUNTLAKE TERRACE WA 9802 BOTHELL WA 98021 PORTLAND OR 97208 -2708 a 11 Census Category: 437 - Commercial alt / add / conversion Includes: #1 #2 #3 #4 Occupancy Class: B Number of Stories ............................ Construction Type: Plumbing to be Included? ....................................... Yes Occupancy Load: 45 Occupancy # I - Use................ ............................... Market/Grocery Zoning Designation ................................................ Flour Areas . ft.) 1 2,326 0 0 0 Building Pre -con. Meeting Required? ....... .........No Existing Sprinkler System in Building? .... ............. Yes Mechanical to be Included? ....... .............................No Number of Stories ............................ Permit for Building Shell Only? .............................No Plumbing to be Included? ....................................... Yes Special Inspection(s) Required? .............................No Occupancy # I - Use................ ............................... Market/Grocery Zoning Designation ................................................ CC -C ,. Drains.............. ............................... 5 Lavatories........ ............................... 3 Sinks................ ............................... 5 Water Closets .. ............................... 2 Water Heaters.. ............................... 1 PERMIT EXPIRES Monday, April 19, 2010 Permit Issued on Wednesday, October 21, 2009 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington / / , and the City of Federal Way. Owner or y � � FINALED U�, City of Federal Way i Certificate of Occupancy f..4 This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff- Tenant Name: GREAT HARVEST BREAD CO Address: 1758 S 320TH ST Permit #: 09- 104083 -00 -CO Includes: #1 #2 #3 #4 Occupancy Class: B Construction Type: Occupancy Load: 45 Floor Area (sq. ft.) 2,326 0 0 1 0 Owner Name: SEATAC VILLAGE SHOPPING CENT Owner Address: PO BOX 2708 PORTLAND OR 97208 -2708 Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most sevedy affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and/or occupant of the premises. y THIS CARD IS TO IN ON -SITE ry OF Federal Way Construction INSPECTION RE U TS: (25 85- 050 >�d Q PERMIT #: 09- 104083 -00 -CO Address: 1758 S 320TH ST Owner: SEATAC VILLAGE SHOPPING CEO FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ri SWM Precon Site Mtg (4400) E] Initial Erosion Control (4365) El Footings /Setback (4110) Approved to insulate Approved By To be done prior to breaking ground By Approved to place concrete By Date By Date By Date Re -steel (4215) Approved to place concrete or grout By Date Underfloor Framing (4285) Approved to sheath floor By Date 0 Plumbing Groundwork (4190) Approved to covers ,g By //y l l/ Date Floor Sheathing (41 Approved to install flooring By Date Slab /Concrete Floor (4255) Approved to place concrete By Date Rough Plumbing (4230) Approved ByC Date I_ 8 S \tj Fire/Draft Stops (4095) Interim Erosion Control (4370) m Prior to scheduling a Framing inspection; Approved Approved Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and By Date By Date approved. IBC 109.3.4 Suspended Ceiling Grid (4265) Approved to drop tile By Date Final Erosion Control (4375) Approved By Date 0 Final - Fire Department (4060) Approved By Date Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date Z�v Final - Planning (4070) Approved By Date Final - Plumbing (4075) Final - Building (4050) Approved Approved By Date _ t BY3 C S Date Framing (4120) Insulation (4150) Approved to insulate Right of Way Approved By Approved to install wallboard By C Date _ 1 Date By Date Suspended Ceiling Grid (4265) Approved to drop tile By Date Final Erosion Control (4375) Approved By Date 0 Final - Fire Department (4060) Approved By Date Gypsum Wallboard Nailing (4130) Approved to install mud & tape By Date Z�v Final - Planning (4070) Approved By Date Final - Plumbing (4075) Final - Building (4050) Approved Approved By Date _ t BY3 C S Date Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date ctrr °� ERMIT Federal vikvE C 1 COMMA= APPLICATION 253 - 835 -2607• FAX 253 -835 -2609 t� www.cituoffederalwau.com OCT ,1 6 N09 SITE ADDRESS So 0tv-N CMO *"-n Yee* SUITE/ T ZONDY ASSESSOR'S TAX/PARCEL # 7 f9Z c O o 9 2 1 4 N - -- — NAME PROJECT r e Q� �✓�1 (� J CC). (Tenant or Homeowner Name) BUILDING PLUMBING MECHANICAL TYPE OF PERMIT ❑ DEMOLITION ❑ ELECTRICAL ❑ ENGINEERING ❑ FIRE PREVENTION e r V PROJECT DESCRIPTION Detailed description of work to L HC be included on this permit only i n r NAME PRIMARY PHONE PROPERTY OWNER S eA+ac, V1 WN 'S ho PP M8GTR, ( ) - MAILING ADDRESS, CITY, STATE, ZIP E-MAIL PO Box Z70 g R7aa 10 ❑ CONTRACTOR APPLICANT PROJECT CONTACT OWNER IS ALSO: NAME PRIMARY PHONE U55"' Cb SirVG ' T (L125) %77-1-7,3q MAD.ING ADDRESS, CITY, STATE, ZIP 23502 Z51-in ' vim. SE W H FAX (NZ5 ) ` 66 -12N7 ONTRACTOR WA STATE CONTRACTOR'S LIC i°c° NSE # EXPIRATION DATE i i FEDERAL WAY BUSINESS CENSE # h t-tic-t S F NAME PRMARY PHONE ) C P I (925)(M - 6706 APPLICANT MATUNG ADDRESS, CITY, STATE. ZIP w I q FAX 22CO v¢, W. NI T' PROJECT CONTACT NAME 1C ki 'So mm PRIMARY PHONE 6 S ) 6 A - (v 706 (The individual to receive and MAEUNG ADDRESS, CITY. STATE. ZIP gyp,,, ��OZ 6 'ice W. J�i.-r- WA _' o s FAX (y25 )77 - T?, respond to all correspondence . concerning this application) ALTERNATE CONTACT NAME: ri l i pp, PRIMARY PHONE 1((425 ) 670 - 676Co E-MAIL vieKi56 Cdnneft4avan PROJECT FINANCING -4py-0 NAME OWNER- FINANCED Required for projects with value of $5,000 or more MAILING ADDRESS. CITY. STATE, ZIP PRIMARY PHONE (RCW 19.27.095) I cert(fy under penalty of perjury that I am the property owner or authorized agent of the property owner. I certlfll that to the best of my knowledge, the igformation submitted in support of this permit application is true and correct. I cert(jy that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the igforlllation supplied to the city as a part of this application. DATE SI ATURE: f T NAME: Bulletin #100 —4/21/2009 1 Page 1 of 4 k:\Handouts\Permit Application com ` a Value of Mechanical Work $ !A OPY OF BID OR EST MATE MUST BE PROVIDED) Indicate number of each tope of fixtum to.W-InstWled or relowteckks P tt of this project. Do not include existing fixtures to remain. AIR HANDLING UNITS S ETS OTHER (Describe) AIR CONDITIONER N_ HOODS (com .mlaq BOILERS � HOT WATER TANKS (Gas) COMPRESSORS GAS G ETS 71— REFRIGERATION SYST DUCTIN GAS PI G WOODSTOVES Bulletin #100 — 4/21/2009 Page 2 of 4 k:\Handouts\Permit Application