Loading...
16-104910FILEMechanical CinityD deop —t Permit #:16- 104910 -00 -ME Community Development Dept. 33325 8th Ave S Federal Way, WA 98003 Inspection Request Line: (253) 835,3050 Ph: (253) 835 -2607 Fax: (253) 835 -2609 Project Name: LEWIS Project Address: 31418 28TH PL SW Parcel Number: 150330 0180 Project Description: REPLACE GAS FURNACE Additional Permit Information Mechanical Work Valuation ? .................................. 5799 Is this an Online or O.T.C. application ?.................. Yes Furnaces 1 PERMIT EXPIRES Saturday, 8 April, 2017 Permit Issued on Monday, October 10, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of 0RUNC 4L1tj� of Federal Way. Owner or agent: Date: Owner Applicant Contractor EDWARD C LEWIS CYNDAL MILLHOLLINNORTHWEST PACIFIC AIR SYSTEMS (GENERAL) 31418 28TH PL SW PERMIT/ WESCO PACIFAS093KA (9/8/17) FEDERAL WAY WA 98023 1345 W GULF RD 12811 PACIFIC HWY SW POINT ROBERTS WA 98281 LAKEWOOD WA 98499 Additional Permit Information Mechanical Work Valuation ? .................................. 5799 Is this an Online or O.T.C. application ?.................. Yes Furnaces 1 PERMIT EXPIRES Saturday, 8 April, 2017 Permit Issued on Monday, October 10, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of 0RUNC 4L1tj� of Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON -SITE Fetlera� Way THIS Inspection Record y INSPECTION REQUESTS: (253) 835 -3050 PERMIT #: 1610491000 Address: 31418 28TH PL SW Project: BEVERLY A LEWIS FEDERAL WAY WA 98023 -7837 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. El Mechanical Rough -in (4165) 0 Gas Piping (4125) Q Final - Mechanical (4065) Approved IBY Approved to release test Approved By Date Date By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date