Loading...
16-104355City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835 -2607 Fax: (253) 835 -2609 Project Name: TAI FILE M' i "ec anical Permit #: 16- 104355 -00 -ME Inspection Request Line: (253) 835 -3050 Project Address: 836 S MARINE HILLS WAY Parcel Number: 515293 0090 Project Description: Replace existing gas furnace and hot water heater Owner SELWYN C TAI Anglican JAIMIE HOW Contractor BRENNAN HEATING & A/C LLC (GENERAL HELEN L TAI BRENNAN HEATING & A/C 01) PO BOX 6134 4601 S 134TH PL BRENNBA971R9 (12/29/17) FEDERAL WAY WA 98063 -6134 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional-Permit Information Mechanical Work Valuation ? ...... ...........................3279 Is this an Online or O.T.C. application ? .................Yes Mechanical Fixtures Furnaces .......... ............................... 1 Hot Water Tanks ............................ 1 PERMIT EXPIRES Sunday, March 5, 2017 Permit Issued on Tuesday, September 6, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: crrr or 'l- Federal Way • TifilS CARD IS & REMAIN ON -SITE -> Construction Mspection Record INSPECTION REQUESTS: (253) 835.3050 16- 104355 -00 -ME Address: 836 S MARINE HILLS WAY Project: SELWYN C TAI FEDERAL WAY, WA 98003 -3183 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Mechanical Rough-in as Piping ( Final - Mechanical Approved Right of Way -� Approved Approved to release test Approved By Date By Date By Date Rough Electrical Approved Final Electrical Approved Right of Way -� Approved By Date By Date By Date