Loading...
16-103566Project Name: TERIYAKI HOUSE Project Address: 1608 SW DASH POINT RD Project Description: Lamp & Ballast replacement in linear fixtures EledricAl Permit #: 16- 103566 -00 -EL Inspection Request Line: (253) 835 -3050 Parcel Number: 189880 0010 Owner DASH POINT VILLAGE SHOPPING Applicant NICHOLAUS BERNOSKI City of Federal Way Community 8 Econ. ev. Services CENTER 33325 8th Ave S FILE Federal Way, WA 98003 19012 61ST AVE AVE NE Ph: (253) 835 -2607 Fax: (253) 835 -2609 16830 VENTURA BLVD Project Name: TERIYAKI HOUSE Project Address: 1608 SW DASH POINT RD Project Description: Lamp & Ballast replacement in linear fixtures EledricAl Permit #: 16- 103566 -00 -EL Inspection Request Line: (253) 835 -3050 Parcel Number: 189880 0010 Owner DASH POINT VILLAGE SHOPPING Applicant NICHOLAUS BERNOSKI Contractor WILLDAN LGHTNG/ELECT OF WA INC CENTER WILLDAN LGHTNG/ELECT OF WA INC WILLDLW8700L (9/13/17) C /O: ROBERT IRMAS 19012 61ST AVE AVE NE 2401 E KATTELLA AVE SUITE 300 16830 VENTURA BLVD ARLINGTON WA 98223 ANAHEIM CA ENCINO CA 91436 Additional Permit Information Electrical Work Valuation ? ........ ............................900 Is Use Educational or Institutional ? .......................No Electrical Fixtures Alt. Srvc / Feeder 0 to 200 amps (C 1 Is this an Online or O.T.C. application ? .................Yes Service greater than 999 Amps? .............................No PERMIT EXPIRES Tuesday, July 25, 2017 Permit Issued on Monday, July 25, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: UNLIN V:1%A► -ED r Federal Way PERMIT #: Project: -TM8 CARD IS REMAIN ON -SITE Construction Wspection Record INSPECTION REQUESTS: (253) 835 -3050 16- 103566-00 -EL Address: 1608 SW DASH POINT RD DASH POINT VILLAGE SHOPPING FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CAP& Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card 13 Rough Electrical Final Electrical Right of Way Approved 0 Approved 13 Approved By Date By Date By Date Ground-(4295) 0 D itch cover r] Slab/ Concrete Floor 0 Approved Service (4235) Approved Approved Approved to place concrete By Date By Date By Date 13 Rough Electrical Final Electrical Right of Way Approved 0 Approved 13 Approved By Date By Date By Date Pool Bonding (41") 0 Temporary Power (4275) 0 Service (4235) Approved Approved Approved By Date By Date By Date 0 11 0 Feeders/Sub- panels (4045) Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date ❑ Final - Electrical (4055) Approved By Date Ct v; `(b 13 Rough Electrical Final Electrical Right of Way Approved 0 Approved 13 Approved By Date By Date By Date