Loading...
16-105588Project Name: MORRIS Project Address: 34836 11TH AVE SW Project Description: Remove /replace gas water heater Mechanical Permit #:16- 105588 -00-ME Inspection Request Line: (253) 835 -3050 Parcel Number: 542242 0710 Owner Applicant City of Federal Way DAVID MORRIS SALINA THAPAFAST WATER HEATER Community Development Dept. 34836 11TH AVE SW COMPANY 01) 33325 8th Ave S 11715 NORTH CREEK PKWY S SUITE C -106 FASTWWH948BC (1/4/18) USA Federal Way, WA 98003 1715 NORTH CREEK PKWY S SUITE C -10, FILE Ph: (253) 835-2607 Fax: (253) 835 -2609 BOTHELL WA 98011 Project Name: MORRIS Project Address: 34836 11TH AVE SW Project Description: Remove /replace gas water heater Mechanical Permit #:16- 105588 -00-ME Inspection Request Line: (253) 835 -3050 Parcel Number: 542242 0710 Owner Applicant Contractor DAVID MORRIS SALINA THAPAFAST WATER HEATER FAST WATER HEATER CO (GENERAL 34836 11TH AVE SW COMPANY 01) FEDERAL WAY WA 98023 11715 NORTH CREEK PKWY S SUITE C -106 FASTWWH948BC (1/4/18) USA BOTHELL WA 98011 1715 NORTH CREEK PKWY S SUITE C -10, BOTHELL WA 98011 Additional Permit Information Mechanical Work Valuation ? .................................. 1536 Is this an Online or O.T.C. application ?.................. Yes Hot Water Tanks 1 PERMIT EXPIRES Saturday, 27 May, 2017 Permit Issued on Monday, November 28, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, nudes and regulations of the State of Washington and the City of Federal Way. Owner or agent: �' 1 �I Date: - �- �' J�' V, . ._ . CUT 4w '110;& Federal Way PERMIT #: 16105588 00 THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835 -3050 Address: 3483611TH AVE SW Q- . - . Project: PAMELA J MORRIS FEDERAL WAY WA 98023 -7014 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. E] Mechanical Rough -in (4165) 0 Gas Piping (4125) Q Final - Mechanical (4065) Approved Approved to release test Approved By Date By Date By 0 \, v N Date ^4--% E] Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date