13-104784,,Mechanical
City of Federal Way Permit #: 13- 104784 -00 -ME
Community & Econ. ev. Services
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: 253 835 -3050
Ph: (253) 835 -2607 Fax: (253) 835 -2609 p q
Project Name: NISHIDA
Project Address: 32929 17TH AVE SW Parcel Number: 010455 0680
Project Description: Replace gas furnace
Owner
qg lin cant
Contractor
CAROL L NISHIDA
STEVE WOOD
SOUND ENERGY SOLUTIONS
LYLE NISHIDA
SOUND ENERGY SOLUTIONS
SOUNDES874QR (11/9/15)
3292917TH AVE SW
722 N 6TH ST
PO BOX 629
FEDERAL WAY WA 98023
MOUNT VERNON WA 98273
ARLINGTON WA 98223
Is this an Online or O.T.C. application ? .................Yes
'Mechanical fixtures
Furnaces ......... ......... .......................
PERMIT EXPIRES Saturday, April 26, 2014
Permit Issued on Monday, October 28, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: elml ' N IP Date:
FINALED
THIS CARD IS TO REMAIN ON -SITE
CITY OF Construction Inspection Record r
Federal Way INSPECTION REQUESTS: (253) 835 -3050
PERMIT #: 13- 104784 -00 -ME Address: 32929 17TH AVE SW
Project: CAROL L NISHIDA FEDERAL WAY, WA 98023 -5412
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
C0v4v>,•GI' t b, trL
Mechanical Rough -in (4165)
Gas Piping (4125)
Final Electrical
Approved
Final - Mechanical (40 5)
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
Date
C0v4v>,•GI' t b, trL
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date
Mechanical
y of EFWaSy Permit #: 13-104784-00-ME
CommunityCit & con.ederal Dev. ervices °'
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line:
Ph:(253)835-2607 Fax:(253)835-2609 p a (253)835-3050
Project Name: NISHIDA
Project Address: 32929 17TH AVE SW Parcel Number: 010455 0680
Project Description: Replace gas furnace
Owner Applicant Contractor
CAROL L NISHIDA STEVE WOOD SOUND ENERGY SOLUTIONS
LYLE NISHIDA SOUND ENERGY SOLUTIONS SOUNDES874QR (11/9/15)
32929 17TH AVE SW 722 N 6TH ST PO BOX 629
FEDERAL WAY WA 98023 MOUNT VERNON WA 98273 ARLINGTON WA 98223
Additional Permit Information
Is this an Online or O.T.C.application? Yes
Mechanical Fixtures
Furnaces 1
PERMIT EXPIRES Saturday, April 26, 2014
Permit Issued on Monday, October 28, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
O a he MEI Way.
Owner or agent: Date:
f 1
NALIEI:i
THIS CARD IS TO REMAIN ON-SITE
CITY4OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253)835-3050
PERMIT#: 13-104784-00-ME Address: 32929 17TH AVE SW
Project: CAROL L NISHIDA FEDERAL WAY, WA 98023-5412
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By Date
. . . .
6ava-
(011-1111.1Y
SiTE I TE
❑ Rough Electrical El Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date