16-103646Project Name: DONAHE
Project Address: 33235 26TH AVE SW
Project Description: Gas line to cook top
Y:
Mechanical
Permit #: 16- 103646 -00 -ME
Inspection Request Line: (253) 835 -3050
Parcel Number: 132103 9076
Owner
ARI21ican t
City of Federal Way
,
Community & Econ. Dev. Services
PINKY'S PLUMBING LLC
33325 8th th Ave S
FILE
Federal Way, WA 98003
33235 26TH AVE SW
Ph: (253) 835 -2607 Fax: (253) 835 -2609
PO BOX 68133
Project Name: DONAHE
Project Address: 33235 26TH AVE SW
Project Description: Gas line to cook top
Y:
Mechanical
Permit #: 16- 103646 -00 -ME
Inspection Request Line: (253) 835 -3050
Parcel Number: 132103 9076
Owner
ARI21ican t
Contractor
JAMES DONAHE
MEGAN HENRY
PINKY'S PLUMBING LLC
JENNY DONAHE
PINKY'S PLUMBING, LLC
PINKYPL905LS (6/10/18)
33235 26TH AVE SW
11012 ROSEBERG AVE S
PO BOX 68133
FEDERAL WAY WA 98023
SEATTLE WA 98168
SEATTLE WA 98168
Additional Permit Information
Mechanical Work Valuation ? ........ .........................697.00 Is this an Online or O.T.C. application ?................ Yes
Mechanical Fixtures
Ranges............. ............................... 1
PERMIT EXPIRES Tuesday, January 24, 2017
Permit Issued on Thursday, July 28, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the Ci Federal Way.
Owner or agent: Date:
THIS CARD IS TO REMAIN ON -SITE
C"OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253) 835 -3050
PERMIT #:
16- 103646 -00 -ME Address: 33235 26TH AVE SW
Project: JAMES DONAHE FEDERAL WAY, WA 98023 -2885
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Mechanical Rough-in 42 5)
Gas Piping 4
final - Mechanical
Approved
proved to release test
Approved
By Date
By < Date _
By Date
7a f.
FILE
Rough Electrical
Approved
0
Final Electrical
Approved
0
Right of Way
Approved
By
Date
By
Date
By
Date