Loading...
16-103646Project Name: DONAHE Project Address: 33235 26TH AVE SW Project Description: Gas line to cook top Y: Mechanical Permit #: 16- 103646 -00 -ME Inspection Request Line: (253) 835 -3050 Parcel Number: 132103 9076 Owner ARI21ican t City of Federal Way , Community & Econ. Dev. Services PINKY'S PLUMBING LLC 33325 8th th Ave S FILE Federal Way, WA 98003 33235 26TH AVE SW Ph: (253) 835 -2607 Fax: (253) 835 -2609 PO BOX 68133 Project Name: DONAHE Project Address: 33235 26TH AVE SW Project Description: Gas line to cook top Y: Mechanical Permit #: 16- 103646 -00 -ME Inspection Request Line: (253) 835 -3050 Parcel Number: 132103 9076 Owner ARI21ican t Contractor JAMES DONAHE MEGAN HENRY PINKY'S PLUMBING LLC JENNY DONAHE PINKY'S PLUMBING, LLC PINKYPL905LS (6/10/18) 33235 26TH AVE SW 11012 ROSEBERG AVE S PO BOX 68133 FEDERAL WAY WA 98023 SEATTLE WA 98168 SEATTLE WA 98168 Additional Permit Information Mechanical Work Valuation ? ........ .........................697.00 Is this an Online or O.T.C. application ?................ Yes Mechanical Fixtures Ranges............. ............................... 1 PERMIT EXPIRES Tuesday, January 24, 2017 Permit Issued on Thursday, July 28, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the Ci Federal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON -SITE C"OF Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835 -3050 PERMIT #: 16- 103646 -00 -ME Address: 33235 26TH AVE SW Project: JAMES DONAHE FEDERAL WAY, WA 98023 -2885 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Mechanical Rough-in 42 5) Gas Piping 4 final - Mechanical Approved proved to release test Approved By Date By < Date _ By Date 7a f. FILE Rough Electrical Approved 0 Final Electrical Approved 0 Right of Way Approved By Date By Date By Date