Loading...
16-103177City of Federal Way Community & Eoon. Dev. Services 33325 8th Ave S FILE Federal Way, WA 98003 Ph: (253) 835 -2607 Fax: (253) 835 -2609 Project Name: SUGG Project Address: 33648 7TH PL SW Mechanical Permit #: 16- 103177 -00 -ME Inspection Request Line: (253) 835 -3050 Project Description: Like for like gas furnace replacement and add on air conditioner. Parcel Number: 729804 0360 Owner Aonlicant Contractor JOHN D SUGG DAVE TREAT AUBURN SHEET METAL INC (GENERAL) HEATHER E SUGG AUBURN SHEET METAL INC AUBURI'222RQ (4/30/17) 33648 7TH PL SW 844 S MT VILLA DR PO BOX 1354 FEDERAL WAY WA 98023 -5004 ENUMCLAW WA 98022 ENUMCLAW WA 98022 Additional Permit Information Mechanical Work Valuation ? ..... ...........................8500 Is this an Online or O.T.C. application ?................ Yes Mechanical Fixtures Air Conditioners - Stand Alone Un 1 Furnaces .......... ............................... 1 PERMIT EXPIRES Wednesday, December 28, 2016 Permit Issued on Friday, July 1, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in�accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: 4, ',3A CITY W 4A.� Federal Way PERMIT #: Project: i-,THIS,ICARD IS TO REMAIN ON- SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835 -3050 16- 103177 -00 -ME Address: 33648 7TH PL SW JOHN D SUGG FEDERAL WAY, WA 98023 -5004 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Q Mechanical Rough-in (4 6) Approved as aping ( Approved to release test Final - Mechanical Approved By Date By Date By Date _ t L Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date