16-105777Project Name: MATLICK
Project Address: 32622 6TH AVE SW
Project Description: Install AC. Lennox XC13 -036
Mechanical
Permit #:16- 105777 -00 -ME
Inspection Request Line: (253) 835 -3050
Parcel Number: 926491 0010
Owner
Applicant
City of Federal Way
FILE
Community Development Dept.
GREENWOOD HEATING (GENERAL)
33325 8th Ave S
AND A/C
Federal Way, WA 98003
FEDERAL WAY WA 98023 -5623
Ph: (253) 835-2607 Fax (253) 835 -2609
825 S STACY ST
Project Name: MATLICK
Project Address: 32622 6TH AVE SW
Project Description: Install AC. Lennox XC13 -036
Mechanical
Permit #:16- 105777 -00 -ME
Inspection Request Line: (253) 835 -3050
Parcel Number: 926491 0010
Owner
Applicant
Contractor
ELIZABETH MATLICK
KAULIE VANGGREENWOOD HEATING
GREENWOOD HEATING (GENERAL)
32622 6TH AVE SW
AND A/C
GREENHA922U7 (2/03/17)
FEDERAL WAY WA 98023 -5623
825 S STACY ST
825 S STACY ST
SEATTLE WA 98134
SEATTLE WA 98134
Additional Permit information
Mechanical Work Valuation? ... ............................... 5000 Is this an Online or O.T.C. application ?.................. Yes
Air Conditioners - Sta• Alont
PERMIT EXPIRES Monday, 5 June, 2017
Permit Issued on Wednesday, December 7, 2016
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: IN I I I h I P Date:
Y
B ,N 4.
VAI� -
THIS CARD IS TO REMAIN ON -SITE
FederMal Way Construction Inspection Record
INSPECTION REQUESTS: (253) 835 -3050
PERMIT #: 16105777 00
Address: 32622 6TH AVE SW
Project: DAVID MATLICK FEDERAL WAY WA 98023 -5623
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0
Mechanical Rough -in (4165)
l
Gas Piping (4125)
El
Final - Mechanical (4065)
Approved
111y
Approved to release test
Approved
Approved
By
Date
Date
By
IV* Date t 2,12- %
Rough Electrical
Final Electrical
Right of Way �-
Approved
Approved
Approved
By
Date
By
Date
By
Date