Loading...
15-100595 Mechanical City of Comm unity&Econ.�Dev s Services Permit #: 15-100595-00-ME 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2809 /Lep Q Project Name: ILNZER �� Project Address: 1911 S 289TH ST Parcel Number: 422300 0250 Project Description: Replace gas furnace and hot water tank,both like for like. Owner Applicant Contractor KENNETH&GRACE KINZER JAIMIE HOW BRENNAN HEATING&A/C LLC 1911 S 289TH ST BRENNAN HEATING&A/C (GENERAL) FEDERAL WAY WA 98003 4601 S 134TH PL BRENNHA971R9(12/29/15) SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 • Additional Permit Information Is this an Online or O.T.C.application Yes Mechanical Fixtures Furnaces 1 Hot Water Tanks 1 PERMIT EXPIRES Saturday, August 8, 2015 Permit Issued on Monday, February 9, 2015 ! hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent0-11411AVE Date: THIS CARD IS TO MAIN ON-SITE CITYA OF Construction I ection Record Federal Way INSPECTION REQ TS: (253)835-3050 PERMIT#: 15-100595-00-ME Address: 1911 S 289TH ST Project: KENNETH & GRACE KINZER FEDERAL WAY, WA 98003-3815 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. E Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By Date 3 it, IS--" • . • • - Rough Electrical Final Electrical ID of Way ElApproved ElApproved Approved By Date By Date By Date City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835 -2607 Fax: (253) 835 -2609 r" f Mechanical Permit #: 15- 1005950 -ME FILE Inspection Request Line: (253) 835-3050 Project Name: RODRIGUEZ Project Address: 1911 S 289TH ST Parcel Number: 422300 0250 Project Description: Replace gas furnace and hot water tank, both like for like. Owner JONATHAN RODRIGUEZ ARnlicant JAME HOW Contractor BRENNAN HEATING & A/C LLC LAURIE RODRIGUEZ BRENNAN HEATING & A/C (GENERAL) 1911 S 289TH ST 4601 S 134TH PL BRENNHA971R9 (12/29/15) FEDERAL WAY WA 98003 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Is this an Online or O.T.C. application ? ................. es Mechanical Fixtures , Furnaces .......... ............................... 1 Hot Water Tanks ............................ PERMIT EXPIRES Saturday, August 8, 2015 Permit Issued on Monday, February 9, 2015 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: g& N now Date: 0 14 Ll N C FINALED CITY CW Federal-Way PERMIT #: TIIFS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835 -3050 15- 100595 -00 -ME Address: 1911 S 289TH ST Project: JONATHAN RODRIGUEZ FEDERAL WAY, WA 98003 -3815 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. 0 Mechanical Rough -in (4165) Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) Approved By Approved to release test Approved By Date By Date By 04 Date 3 x 15 El Rough Electrical Approved E3 Final Electrical Approved Right of Way Approved By Date By Date By Date