16-105382$31Wechanical
CuniryD ahn- -t Permit # :16- 105382- 00 -A4E
Community Development Dept.
FILE 33325 8th Ave S
Federal way, WA 9M3 . Inspection Request Line: (253) 835 -3050
Ph: (253) 835.2607 Fax (253) 835 -2609
Project Name: MOERICKE
Project Address: 1917 S 289TH ST Parcel Number: 422300 0260
Project Description: Replace existing gas furnace and gas water heater
Owner
Applicant
Contractor
BRADLEY STEPHEN MOERICKE
)AIMIE HOWBRENNAN HEATING & A/C
BRENNAN HEATING & A/C LLC
1917 S 289TH ST
4601 S 134TH PL
(GENERAL 01)
FEDERAL WAY WA
SEATTLE WA 98168
BRENNHA971R9 (12/29/17)
98003
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation? ... ............................... 2724 Is this an Online or O.T.C. application ?.................. Yes
Furnaces
1 Hot Water Tanks
1
PERMIT EXPIRES Monday, 8 May, 2017
Permit Issued on Wednesday, November 9, 2016
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
THIS CARD IS TO REMAIN ON -SITE
Construction Inspection Record
Federal way INSPECTION REQUESTS: (253) 835 -3050
PERMIT #: 16105382 00 Address: 1917 S 289TH ST
Project: BRADLEY STEPHEN MOERICKE FEDERAL WAY WA 98003 -3815
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
0
Mechanical Rough-in (4165)
Gas Piping (4125)
Final Electrical
Final - Mechanical (4065)
Right of Way
Approved
Rough Electrical
Approved to release test
Approve(
Approved
By
Date
By
Date
By
Date _ Ili,_
Final Electrical
Right of Way
n
Rough Electrical
Approve(
Approved
Approved
By
Date
By
Date
By.
Date