Loading...
16-103808Project Name: DECLERK Project Address: 35712 2ND AVE S Electrical Permit #: 16- 103808 -00 -EL Inspection Request Line: (253) 835-3050 Parcel Number: 114000 0160 Project Description: Change out existing gas furnace. Electrical connection for gas furnace replacement. Owner Analicant City ROBERT G DECLERK Community & Econ. Dev. Services 25 FILE 8th Ave Say BRENNAN HEATING & A/C Federal Way, WA 98003 35712 2ND AVE S Ph: (253) 835 -2607 Fax: (253) 835 -2609 BRENNHA962DU (3/31/18) Project Name: DECLERK Project Address: 35712 2ND AVE S Electrical Permit #: 16- 103808 -00 -EL Inspection Request Line: (253) 835-3050 Parcel Number: 114000 0160 Project Description: Change out existing gas furnace. Electrical connection for gas furnace replacement. Owner Analicant Contractor ROBERT G DECLERK JAIMIE HOW BRENNAN HEATING & A/C LLC CAROLE E DECLERK BRENNAN HEATING & A/C (ELECTRICAL 01) 35712 2ND AVE S 4601 S 134TH PL BRENNHA962DU (3/31/18) FEDERAL WAY WA 98003 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Electrical Work Valuation ? ........ ............................300 Is Use Educational or Institutional ? ....................... No Is this an Online or O.T.C. application ? ................. es Electrical Fixtures Circuits - Residential ....................... 1 Thermostat...... ............................... 1 PERMIT EXPIRES Friday, August 4, 2017 Permit Issued on Thursday, August 4, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: I& I 1 0 N 0 rMs Date: I N L I IN �— i Federal Way PERMIT #: , THIS CARD IS TO -REMAIN ON WE _ Construction Inspection Record INSPECTION REQUESTS: (253) 835 -3050 16- 103808 -00 -EL Address: 35712 2ND AVE S Project: ROBERT G DECLERK FEDERAL WAY, WA 98003 -8614 Scheduled inspections may be failed if this card is not on -site. 2Q NOT LOSE THIS CARD, Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card UFER Ground ( 9 Ditch cover (4 030) Temporary Power (4275) Slab/Concrete Floor Approved Service (4235) Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) Temporary Power (4275) Right of Way Approved Service (4235) Date Approved By Date Approved By Date Approved By Date By Date By Date 0 0 0 Feeders/Sub- panels (4045) Rough Electrical (4225) Ceiling g Cover (4020) Approved Approved Approved By Date By Date By Date 0 Final - Electrical (4055) Approved By Date tb Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date