16-103808Project Name: DECLERK
Project Address: 35712 2ND AVE S
Electrical
Permit #: 16- 103808 -00 -EL
Inspection Request Line: (253) 835-3050
Parcel Number: 114000 0160
Project Description: Change out existing gas furnace. Electrical connection for gas furnace replacement.
Owner
Analicant
City
ROBERT G DECLERK
Community & Econ. Dev. Services
25
FILE
8th Ave Say
BRENNAN HEATING & A/C
Federal Way, WA 98003
35712 2ND AVE S
Ph: (253) 835 -2607 Fax: (253) 835 -2609
BRENNHA962DU (3/31/18)
Project Name: DECLERK
Project Address: 35712 2ND AVE S
Electrical
Permit #: 16- 103808 -00 -EL
Inspection Request Line: (253) 835-3050
Parcel Number: 114000 0160
Project Description: Change out existing gas furnace. Electrical connection for gas furnace replacement.
Owner
Analicant
Contractor
ROBERT G DECLERK
JAIMIE HOW
BRENNAN HEATING & A/C LLC
CAROLE E DECLERK
BRENNAN HEATING & A/C
(ELECTRICAL 01)
35712 2ND AVE S
4601 S 134TH PL
BRENNHA962DU (3/31/18)
FEDERAL WAY WA 98003
SEATTLE WA 98168
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Electrical Work Valuation ? ........ ............................300
Is Use Educational or Institutional ? ....................... No
Is this an Online or O.T.C. application ? ................. es
Electrical Fixtures
Circuits - Residential ....................... 1 Thermostat...... ............................... 1
PERMIT EXPIRES Friday, August 4, 2017
Permit Issued on Thursday, August 4, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: I& I 1 0 N 0 rMs Date:
I N L I IN �—
i
Federal Way
PERMIT #:
, THIS CARD IS TO -REMAIN ON WE _
Construction Inspection Record
INSPECTION REQUESTS: (253) 835 -3050
16- 103808 -00 -EL Address: 35712 2ND AVE S
Project: ROBERT G DECLERK FEDERAL WAY, WA 98003 -8614
Scheduled inspections may be failed if this card is not on -site. 2Q NOT LOSE THIS CARD, Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card
UFER Ground ( 9
Ditch cover (4 030)
Temporary Power (4275)
Slab/Concrete Floor
Approved
Service (4235)
Approved
Approved
Approved to place concrete
By
Date
By
Date
By
Date
Pool Bonding (4195)
Temporary Power (4275)
Right of Way
Approved
Service (4235)
Date
Approved
By
Date
Approved
By
Date
Approved
By
Date
By
Date
By
Date
0
0
0
Feeders/Sub- panels (4045)
Rough Electrical (4225)
Ceiling g Cover (4020)
Approved
Approved
Approved
By
Date
By
Date
By
Date
0
Final - Electrical (4055)
Approved
By
Date tb
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date