Loading...
16-104613Project Name: RUSSELL Project Address: 29948 4TH AVE S Project Description: Electrical connection for gas furnace replacement Electric2l Permit #: 16- 104613 -00 -EL Inspection Request Line: (253) 835 -3050 Parcel Number: 720535 0020 Owner ROBIN RUSSELL Annlicant JAIMIE HOW City of Federal Way 29948 4TH AVE S community & Econ. Dev. Services (ELECTRICAL 01) 33325 8th Ave S 4601 S 134TH PL Federal Way, WA .98003 FILE Ph: (253) 838-2807 Fax: (253) 835-2609 4601 S 134TH PL Project Name: RUSSELL Project Address: 29948 4TH AVE S Project Description: Electrical connection for gas furnace replacement Electric2l Permit #: 16- 104613 -00 -EL Inspection Request Line: (253) 835 -3050 Parcel Number: 720535 0020 Owner ROBIN RUSSELL Annlicant JAIMIE HOW Contractor BRENNAN HEATING & A/C LLC 29948 4TH AVE S BRENNAN HEATING & A/C (ELECTRICAL 01) FEDERAL WAY WA 98003 -3622 4601 S 134TH PL BRENNHA962DU (3/31/18) SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit information Electrical Work Valuation ? ........ ............................300 Is Use Educational or Institutional ? .......................No Electrical Fixtures Is this an Online or O.T.C. application ? .................Yes Circuits - Residential ...................... 1 Thermostat..... ............................... 1 PERMIT EXPIRES Friday, September 15, 2017 Permit Issued on Thursday, September 15, 2016 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: FINA�E� C" or Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON -SITE eonstruction Inspection Record INSPECTION REQ TS: (253) 835 -3050 16- 104613-00 -EL Address: 29948 4TH AVE S ROBIN RUSSELL FEDERAL WAY, VITA 98003 -3622 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card Pool Bonding (4195) Approved By Date Feeders/Sub- panels (4045) Approved By Date Final - Electrical (4055) Approved By ko Date 4ISO Ground 4 Ditch cover (4 030) Slab/Concrete Floor Date Approved Approved Approved to place concrete By Date By Date By Date Pool Bonding (4195) Approved By Date Feeders/Sub- panels (4045) Approved By Date Final - Electrical (4055) Approved By ko Date 4ISO Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date Temporary Power (4275) Approved By Date © Rough Electrical (4225) Approved By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date Service (4235) Approved By Date Ceiling Cover (4020) Approved By Date Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date