Loading...
16-104360..0 - I._. I City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835 -2607 Fax: (253) 835 -2609 ` -. ° - � NItchanical FILE Permit #: 16- 104360 -00-ME Inspection Request Line. (253) 835 -3050 Project Name: HAMILTON Project Address: 1123 SW 335TH ST Parcel Number: 9264% 0140 Project Description: Replace 80% furnace - add on heat pump Owne MONTGOMERY HAMILTON ARRlican t JIM LEAIR Contractor LEAIR CLIMATE CONTROL INC JAMES R HAMILTON LEAIR CLIMATE CONTROL INC LEAIRCC881M4 (8/19/18) 1123 SW 335TH ST P.O. BOX 73307 PO BOX 73307 FEDERAL WAY WA 98023 PUYALLUP WA 98373 -0307 PUYALLUP WA 98373 Additional Permit Information Mechanical Work Valuation ? ....... ..........................12000 Is this an Online or O.T.C. application ? .................Yes Mechanical Fixtures Compressors / Heat Pumps............ 1 Furnaces .......... ............................... 1 PERMIT EXPIRES Sunday, March 6, 2017 Permit Issued on Tuesday, September 6, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: rA.i to Federal Way - THIS -CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835 -3050 PERMIT #: 16- 104360 -00 -ME Address: 1123 SW 335TH ST Project: MONTGOMERY HAMILTON FEDERAL WAY, WA 98023 -5305 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Mechanical Rough-in ( as Piping 2) 11 Final - ec anica 0 Approved By Approved to release test Approved By Date By Date By ho Date 17-1 15l Rough Electrical Approved Final Electrical Approved 0 Right of Way Approved By Date By Date By Date