16-104100City of Federal Way
Community & Econ. Dev. Services
8#1 Ave 33325 8th Av S'
Federal Way, WA 98003
Ph. (253) 835 -2607 Fax: (253) 835 -2609
r.
Mechanical
Permit #: 16- 104100 =00 -M E
Project Name: THE ESTELL EPSTEIN IRREVOCABLE TRUST
Project Address: 32225 10TH AVE S
Project Description: Remove /replace gas water heater
Inspection Request Line: (253) 835 -3050
Parcel Number: 609390 0140
Owner
W Agolicant
Contractor
THE ESTELL EPSTEIN IRREVOCABLE
SALINA THAPA
FAST WATER HEATER CO (GENERAL)
TRUST
FAST WATER HEATER COMPANY
FASTWWH948BC (1/4/18)
25834 26TH PL S UNIT G -306
11715 NORTH CREEK PKWY S SUITE C -106
11715 NORTH CREEK PKWY S SurrE,C -106
KENT WA 98032
BOTHELL WA 98011
BOTHELL WA 98011
Additional Permit Information
Mechanical Work Valuation ? ...... ...........................1221
Is this an Online or O.T.C. application ? .................Yes
Mechanical Fixtures s
Hot Water Tanks ............................ 1
PERMIT EXPIRES Saturday, February 18, 2017
Permit Issued on Monday, August 22, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
/ i
Owner or agent: K 1' ' i \ Date:
1 -" ne, \, -cods
. TIUS CARD IS TO REMAIN ON -SITE
C" CW al Way Construction Inspection Record
INSPECTION REQUESTS: (253) 835.3050
PERMIT #: 16- 104100 -00-ME Address: 32225 10TH AVE S
Project: THE ESTELL EPSTEIN IRREVOCAI FEDERAL WAY, WA 98003 -5924
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD, Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
echanical WNFIG7165)
Gas Piping (41 25)
❑ Final - ec anical
Approved
Approved to release test
Approved
By Date
By Date
By j.^j Date 10
Date
By
Rough Electrical
Approved
Final Electrical
Approved
❑
Right of Way -�
Approved
By
Date
By
Date
By
Date