Loading...
16-104970City of Federal Way Com De munity velopment Dept. 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Electrical FIPermit #:16- 104970 -00 -EL LE Inspection Request Line: 253 835 -3050 Project Name: NIPPON DYNAWAVE PACKAGING COMPANY Project Address: 32001 32ND AVE S Parcel Number: 215465 0010 Project Description: Running 30 cables for low voltage voice and data cabling for 26 locations Owner. Applicant Contractor STERLING REALTY ORG KYRIE ANSHUTZINTERFACE INTERFACE TECHNOLOGIES NW 600 106TH AVE NE SUITE 200 TECHNOLOGIES NW INTERTN858DS (3/10/17) BELLEVUE WA 98004 4425 164TH ST SW 4425 164TH ST SW LYNNWOOD WA 98087 LYNNWOOD WA 98087 Additional Permit Information Is this an Online or O.T.C. application ? .................. Yes E Low Voltage - Other (Commei PERMIT EXPIRES Wednesday, 11 October, 2017 Permit Issued on Tuesdav, October 11, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: n h l l IMP 1� P Date: ■ M e �APPL(CANT RAs SITE FjNq4 Az!o crry or rNN Federal Way PERMIT #: Project: THIS CARD IS TO REMAIN ON -SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835 -3050 1610497000 STERLING REALTY ORG Address: 3200132ND AVE S Unit 310 FEDERAL WAY WA 98001 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. ❑ UFER Ground (4295) ® Ditch cover (4030) 0 Slab /Concrete Floor (4255) Ceiling Cover (4020) Approved Approved Approved Approved Approved to place concrete By Date By Date By Date ® Pool Bonding (4195) ® Temporary Power (4275) ® Service (4235) Ceiling Cover (4020) Approved Approved Approved Approved Approved By Date By Date By Date Q Feeders/Sub- panels (4045) ® Rough Electrical (4225) Final Electrical ® Ceiling Cover (4020) Right of Way Approved Approved Approved Approved Approved By Date By Date By Date R O Final - Electrical (4055) Approved B Date p l Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date