Loading...
16-104743.__, Al2RIican Contractor City of Federal Way JAIMIE HOW BRENNAN HEATING & A/C LLC (GENERAL Community & Econ. Dev. Services BRENNAN HEATING & A/C 01) 33325 8th Ave S 4601 S 134TH PL BRENNHA971R9 (12/29/17) Federal Way, WA 98003 SEATTLE WA 98168 4601 S 134TH PL Ph: (253) 835 -2607 Fax: (253) 835 -2609 TUKWILA WA 98168 Project Name: MOON Project Address: 3718 SW 319TH ST Project Description: Replace existing gas furnace Mechanical Permit #: 16- 104743 -00 -ME Inspection Request Line: (253) 835 -3050 Parcel Number: 8731981520 Owne Al2RIican Contractor PHOEBE H MOON JAIMIE HOW BRENNAN HEATING & A/C LLC (GENERAL 3718 S 319TH ST BRENNAN HEATING & A/C 01) FEDERAL WAY WA 98023 4601 S 134TH PL BRENNHA971R9 (12/29/17) SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Mechanical Work Valuation ? ..... ...........................2499 Is this an Online or O.T.C. application ?................ Yes Mechanical Fixtures Furnaces .......... ............................... 1 PERMIT EXPIRES Tuesday, March 21, 2017 Permit Issued on Thursday, September 22, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington 0- and the City of Federal Way. it Owner or agent: 9 \ I Date: 1 1 4 '%� I '" 1-. LE F1NALED cnv "s 'i/ Federal Way PERMIT #: TIb3S CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQUESTS: (253) 835 -3050 16- 104743 -00 -ME Address: 3718 SW 319TH ST Project: PHOEBE H MOON FEDERAL WAY, WA 98023 -2154 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Mechanical oug an (1 as Piping (4 125) Final - Mechanical Approved Right of Wa y Approved Approved to release test Approved By Date By Date , //�� S Date— !`�—lv Rough Electrical Approved Final Electrical Approved Right of Wa y Approved By Date By Date By Date