16-104743.__,
Al2RIican
Contractor
City of Federal Way
JAIMIE HOW
BRENNAN HEATING & A/C LLC (GENERAL
Community & Econ. Dev. Services
BRENNAN HEATING & A/C
01)
33325 8th Ave S
4601 S 134TH PL
BRENNHA971R9 (12/29/17)
Federal Way, WA 98003
SEATTLE WA 98168
4601 S 134TH PL
Ph: (253) 835 -2607 Fax: (253) 835 -2609
TUKWILA WA 98168
Project Name: MOON
Project Address: 3718 SW 319TH ST
Project Description: Replace existing gas furnace
Mechanical
Permit #: 16- 104743 -00 -ME
Inspection Request Line: (253) 835 -3050
Parcel Number: 8731981520
Owne
Al2RIican
Contractor
PHOEBE H MOON
JAIMIE HOW
BRENNAN HEATING & A/C LLC (GENERAL
3718 S 319TH ST
BRENNAN HEATING & A/C
01)
FEDERAL WAY WA 98023
4601 S 134TH PL
BRENNHA971R9 (12/29/17)
SEATTLE WA 98168
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation ? ..... ...........................2499 Is this an Online or O.T.C. application ?................ Yes
Mechanical Fixtures
Furnaces .......... ............................... 1
PERMIT EXPIRES Tuesday, March 21, 2017
Permit Issued on Thursday, September 22, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
0- and the City of Federal Way.
it
Owner or agent: 9 \ I Date:
1 1 4 '%� I '" 1-. LE
F1NALED
cnv "s 'i/
Federal Way
PERMIT #:
TIb3S CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835 -3050
16- 104743 -00 -ME Address: 3718 SW 319TH ST
Project: PHOEBE H MOON FEDERAL WAY, WA 98023 -2154
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Mechanical oug an (1
as Piping (4 125)
Final - Mechanical
Approved
Right of Wa y
Approved
Approved to release test
Approved
By
Date
By
Date
, //��
S Date— !`�—lv
Rough Electrical
Approved
Final Electrical
Approved
Right of Wa y
Approved
By
Date
By
Date
By
Date