Loading...
16-104392. ' - it City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835 -2607 Fax: (253) 835 -2609 Project Name: SUNIM ERS • + FILE Project Address: 1319 SW 348TH ST Project Description: Replacing gas water heater 0& - - Mechanical Permit #; 16- 104392 -06 -ME Inspection Request Line: (253) 835 -3050 Parcel Number: 542242 0480 Owner ERIC W SUMMERS Applicant ANGELA LUDWIG Contractor WASHINGTON CORROSION SRVC INC KRISTINA SUMMERS WASHINGTON CORROSION SRVC INC WASIRCS055KC (514/18) 1319 SW 348TH ST 2238 55TH ST SE 1425 BLAINE AVE NE FEDERAL WAY WA 98023 -7027 AUBURN WA 98092 RENTON WA 98056 -2774 Additional Permit Information Mechanical Work Valuation ? ......... ........................1000.00 Is this an Online or O.T.C. application? ................. Yes Mechanical Fixtures Hot Water Tanks ............................ 1 PERMIT EXPIRES Sunday, March 5, 2017 Permit Issued on Tuesday, September 6, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: OKII 11NIM Date: THISCARD IS TO REMAIN ON -,SITE Federal Way onstruction Inspection Record y INSPECTION REQUESTS: (253) 835 -3050 PERMIT #: 16- 104392 -00 -ME Address: 1319 SW 348TH ST Project: ERIC W SUMMERS FEDERAL WAY, WA 98023 -7027 Scheduled inspections may be failed if this card is not on -site. RQ NOT LOSE THIS CARD, Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Mechanical Rough-in (41 ) as Piping (1 in - Mechanical ( Approved By Approved to release test Approved By Date By Date By 4 Date 11 Ib Rough Electrical Approved Final Electrical Approved Right of Way -� Approved By Date By Date By Date