13-100861, '� • . ,, a .. �
wilding Multi Family
City Federal Way Permit #: 13- 100861 -00 -MF
Community & & Enron. Dev. Services
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: 253 835 -3050
Ph: (253) 835 -2607 Fax: (253) 835 -2609 p q
Project Name: TALL FIRS CONDOMINIUMS BUILDING 6
Project Address: 2011 SW 318TH PL Bldg 06 ?arcel Number: 8561100210-8561100
Project Description: Remove and replace composition shingles like for like
Owner
A alicant
Contractor
Lender
TALL FIRS CONDO
NORTHWEST ROOF SERVICE INC
NORTHWEST ROOF SERVICE INC
OWNER IS LENDER
ASSOCIATION
PO BOX 1697
NORTHRS088DW (10115113)
1733 SW 318TH PL
KENT WA 98035
PO BOX 1697
Occupancy Load
FEDERAL WAY WA 98109 -1320
KENT WA 98035
Census Category: 555 - Non - structural roofing permits
Includes:
#1
#2
#3
#4
Occupancy Class:
Construction Type:
Occupancy Load
Floor Areas . ft.
0
0
0
0
Additional Permit Information
Mechanical to be Included? ...... .............................No
Permit for Building Shell Only9 .............................No
Number of Stories ................... ..............................2
Plumbing to be Included? ......... .............................No
No Fixtures Associated With This Permit It
PERMIT EXPIRES Saturday, August 24, 2013
Permit Issued on Monday, February 25, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and th se will be in accordance with the laws, rules and regulations of the State of Washington
and a ity of FedgraI Way.
Owner or agent: / Date:
FINq��"
CITY OF
Federal Way
PERMIT #:
Project:
• THIS CARD IS T MAIN ON -SITE
Construction In ection Record
INSPECTION REQUE TS: (253) 835 -3050
13- 100861 -00 -MF Address: 2011 SW 318TH PL Bldg 06
TALL FIRS CONDO ASSOCIATION FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Rough Electrical Final Electrical Right of Way
Approved Approved 11 Approved
By Date By Date By Date
SWM Precon Site Mtg (4400)
Initial Erosion Control (4365)
Footings /Setback (411 0)
Approved
To be done prior to breaking ground
Approved to place concrete
By
Date
By
Date
By
Date
Rough Electrical Final Electrical Right of Way
Approved Approved 11 Approved
By Date By Date By Date
Foundation Wall (4115)
Drainage/Downspout (4040)
Re -steel (4215)
Approved to place concrete
Approved to backfll
Approved to place concrete or grout
By
Date
By
Date
By
Date
0
Slab /Concrete Floor (4255)
Underfloor Framing (4285)
Floor Sheathing (4105)
Approved to place concrete
Approved to sheath floor
Approved to install flooring
By
Date
By
Date
By
Date
Shear Walls (4245)
Roof Sheathing (4220)
Fire/Draft Stops (4095)
Approved to install siding
Approved to install roofing
Approved
By
Date
ByG
Date 3 3—
By
Date
Interim Erosion Control (4370)
Prior to scheduling a Framing inspection;
El
Framing (4120)
Approved
Electrical, Plumbing & Mechanical Rough -in and
Approved to insulate
By
Date
Fire/Draft Stop inspections must be signed -off and
By
Date
approved. IBC 1093.4
E]
Insulation (4150)
Gypsum Wallboard Nailing (4130)
Suspended Ceiling Grid (4265)
Approved to install wallboard
Approved to install mud & tape
Approved to drop tile
By
Date
By
Date
By
Date
E:]
Final -Fire Department (4060)
Final Erosion Control (4375)
0
Final - Building (4050)
Approved
Approved
Approved
By
Date
By
Date
By
rr Date 3
1141117
Rough Electrical Final Electrical Right of Way
Approved Approved 11 Approved
By Date By Date By Date
MY or = - I I
Federal Way
PERMIT NUMBER `.
�ITE ADDRESS �O
ECT VALUATION
15 C415 I &-e
TYPE OF PERMIT
NAME OF PROJECT
PROJECT DESCRIPTION
Detailed description of work to
be included on this permit only
PROPERTY OWNER
CONTRACTOR
APPLICANT
PROJECT CONTACT
(The individual to receive and
respond to all correspondence
concerning this application)
PROJECT FINANCING
Required value of $5,000 or more
(RCW 19.27.095)
PERMIT APPyR#1TjRN
FEB 2 2 2013
TARGET DATE CITY OF FEDERAL WAY
CDS
Sorts /UNIT +
ZONING ASSESSOR'S TAR /FAR U #
j U --
❑ BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
-Ta(I pws
NAME
PRIMARY PSpHE�r� zV rV
Ct
MAH DfG AD
STAT
PHONE o
Cr r I
WY/
NIMIZO ADDRESS
OAT
CITY I'
x\
FAR
...�0
WA ATS CONTRA s'S _#
EEPIRATION DATE
FEDERAL O y L O I SCSI(SE #I-
(Vl L
1lff�� SS
/ /
PR�Ry PHONE
N
MAILING ADDRESS
SMAII
CITT
STATE
ZIP
FAX
NAME
PRIMARY PRONE
MADdNG ADD ^ /j h
1V!`• S't�AJTE
W U � t
ec o
1. �l
CITY
ZIP
NAME
OWNER- FINANCED
MAILING ADDRESS, CITY, STATE, ZIP
PRONE
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as apart of th' pplication.
t �
SIGNATURE: DATE
C
PRINT NAME:
Bulletin #100 — January 1, 2013 Pa -e I of 3 k: 14andoutsTerm t Application