Loading...
15-1058190 Bectrical Permit #: 15- 105819 -00 -EL Inspection Request Line: (253) 835 -3050 Project Name: LAKE EASTER ESTATES CONDOMINIUM BLDG 10 UNIT 39 Project Address: 1211 S 308TH ST Unit 39 Parcel Number. 401540 0390 Project Description: Change out Receptacles and switches in 44 condo units. Job 1159194. Owner Applicant City of Federal Way UN CHU SON Community & Econ. ev. Services PRIME ELECTRIC INC 33325 8th Ave S FILE Federal Way, WA 98003 FEDERAL WAY WA 98003 Ph. (253) 835 -2607 Fax: (253) 835 -2609 13301 SE 26TH ST 0 Bectrical Permit #: 15- 105819 -00 -EL Inspection Request Line: (253) 835 -3050 Project Name: LAKE EASTER ESTATES CONDOMINIUM BLDG 10 UNIT 39 Project Address: 1211 S 308TH ST Unit 39 Parcel Number. 401540 0390 Project Description: Change out Receptacles and switches in 44 condo units. Job 1159194. Owner Applicant Contractor UN CHU SON JEREMY STEEB PRIME ELECTRIC INC 1211 S 308TH ST UNIT 39 PRIME ELECTRIC INC PRIMEEI134BT (1/30/17) FEDERAL WAY WA 98003 13301 SE 26TH ST 13301 SE 26TH ST BELLEVUE WA 98005 BELLEVUE WA 98005 Additional Permit Information Is this an Online or O.T.C. application ? .................Yes Electrical Fixtures Circuits - Residential ...................... 12 Is Use Educational or Institutional ? .......................No PERMIT EXPIRES Saturday, May 14, 2016 Permit Issued on Monday, November 16, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and1he itg of al Way. Owner or agent: I I I iN Date: '%moor Not FI NpLEo CITY OF -• Federal Way PERMIT #: I THIS CARD IS TO H&MAIN ON -SITE Construction In ection Record INSPECTION REQU TS: (253) 835 -3050 15- 105819 -00 -EL Address: 1211 S 308TH ST Unit 39 Project: UN CHU SON FEDERAL WAY, WA 98003 -4700 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be-covered-until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Final - Electrical (4055) Approved By LM�p Date UFER Ground (4295) E] Ditch cover (4030) Temporary Power (4275) Slab /Concrete Floor (4255) F] Approved By Approved Approved to place concrete By Date By Date By Date Final - Electrical (4055) Approved By LM�p Date Pool Bonding (4195) E] Temporary Power (4275) F] Service (4235) By Approved By Approved By Approved By Date By Date By Date E] E] 0 Feeders /Sub - panels (4045) Rough Electrical (4225) Ceiling Cover (4020) Approved Approved Approved By Date By Date By Date Final - Electrical (4055) Approved By LM�p Date Rough Electrical Approved EJ - Final Electrical Approved F] Right of Way Approved By Date By Date By Date