Loading...
15-105378City of Federal Way Wchanical � � --� • //,.�� Community & Econ. Dev. Services Permit #: 15405378-00-ME 33325 8th Ave S Federal Way, WA 98003 Ins ection Re uest Line: 253 835-3050 Ph: (253) 835 -2607 Fax: (253) 835 -2609 p q Project Name: MOORE Project Address: 2525 SW 325TH PL Parcel Number: 638660 0020 Project Description: Replace 60k gas furnace and 50 gal gas water heater Owner ARRlican Contractor MARY MOORE NORTHWEST PERMIT / WESCO PACIFIC AIR SYSTEMS (GENERAL) 2525 SW 325TH PL 1345 W GULF RD PACIFAS093KA (9/8/17) FEDERAL WAY WA 98023 -2530 POINT ROBERTS WA 98281 12811 PACIFIC HWY SW LAKEWOOD WA 98499 Additional Permit Information Is this an Online or O.T.C. application ? .................Yes Mechanical Fixtures Furnaces .......... ............................... 1 Hot Water Tanks ............................ 1 PERMIT EXPIRES Monday, April 18, 2016 Permit Issued on Wednesday, October 21, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: IONKII Ili Im Date: e1D CITY of �-' - -- Federal Way PERMIT #: 15- 105378 -00 -ME THIS CARD IS TO MAIN ON -SITE Construction In ection Record INSPECTION REQU TS: (253) 835 -3050 Address: 2525 SW 325TH PL Project: MARY MOORE FEDERAL WAY, WA 98023 -2530 Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card. Mechanical Rough -in (4165) Gas Piping (4125) Final Electrical Approved Final - Mechanical (4065) Approved By Approved to release test Approved By Date By Date By ( Date % I l 10 1 S Rough Electrical Approved Final Electrical Approved Right of Way Approved By Date By Date By Date