15-105378City of Federal Way Wchanical � � --� • //,.��
Community & Econ. Dev. Services Permit #: 15405378-00-ME
33325 8th Ave S
Federal Way, WA 98003 Ins ection Re uest Line: 253 835-3050
Ph: (253) 835 -2607 Fax: (253) 835 -2609 p q
Project Name: MOORE
Project Address: 2525 SW 325TH PL Parcel Number: 638660 0020
Project Description: Replace 60k gas furnace and 50 gal gas water heater
Owner
ARRlican
Contractor
MARY MOORE
NORTHWEST PERMIT / WESCO
PACIFIC AIR SYSTEMS (GENERAL)
2525 SW 325TH PL
1345 W GULF RD
PACIFAS093KA (9/8/17)
FEDERAL WAY WA 98023 -2530
POINT ROBERTS WA 98281
12811 PACIFIC HWY SW
LAKEWOOD WA 98499
Additional Permit Information
Is this an Online or O.T.C. application ? .................Yes
Mechanical Fixtures
Furnaces .......... ............................... 1 Hot Water Tanks ............................ 1
PERMIT EXPIRES Monday, April 18, 2016
Permit Issued on Wednesday, October 21, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: IONKII Ili Im Date:
e1D
CITY of �-' - --
Federal Way
PERMIT #:
15- 105378 -00 -ME
THIS CARD IS TO MAIN ON -SITE
Construction In ection Record
INSPECTION REQU TS: (253) 835 -3050
Address: 2525 SW 325TH PL
Project: MARY MOORE FEDERAL WAY, WA 98023 -2530
Scheduled inspections may be failed if this card is not on -site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On -going inspections are logged on the back of this card.
Mechanical Rough -in (4165)
Gas Piping (4125)
Final Electrical
Approved
Final - Mechanical (4065)
Approved
By
Approved to release test
Approved
By
Date
By
Date
By
( Date % I l 10 1 S
Rough Electrical
Approved
Final Electrical
Approved
Right of Way
Approved
By
Date
By
Date
By
Date