Loading...
13-100493 E t _ • Electrical Community&Federal Way Services Permit #: 13-100493-00-EL 33325 8th Ave S W Federal Way,WA 98003 (253)Li Request 835-3050 Inspection e uesne: Ph:(253)835-2607 Fax:(253)835-2609 p Q ' Project Name: SHAHRASBI,DDS Project Address: 33516 9TH AVE S Bldg 9 Parcel Number: 926925 0090 Project Description: Adding/altering up to(12)circuits for associated tenant improvement work Owner Applicant Contractor APADANA LLC PATRICK HALL TENANT ELECTRICAL SERVICES 33516 9TH AVE S TENANT ELECTRICAL SERVICES TENANES931K5(5/25/13) FEDERAL WAY WA 98003 19936 BALLINGER WAY NE 19936 BALLINGER WAY NE SHORELINE WA 98155 SEATTLE WA 98155 Additional Permit information Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Service greater than 999 Amps? No Electrical Fixtures ems , Circuits-Commercial 12 PERMIT EXPIRES Saturday, January 31, 2015 Permit Issued on Thursday, January 31, 2013 I hereby certify that the above information is correct and that the construction on the above described property and fY the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: ate: 1 19' 13 THIS CARD IS TO MAIN ON-SITE "TM°F THIS I ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 13-100493-00-EL Address: 33516 9TH AVE S Bldg 9 Project: APADANA LLC FEDERAL WAY, WA 98003-6322 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. LIFER Ground(4295) Ditch cover 4030 ❑ Approved ❑ Approved(4030)) ❑ Slab/Concrete Floor(4255) pp Approved to place concrete ' By Date By Date By Date Pool Bonding(4195) Temporary Power(4275) ❑ ❑ p pp (Approved App roved ) App❑ Service(4235) Approved By Date By Date By Date 0 Feeders/Sub-panels(4045) Rough Electrical (4225) • Ceiling Cover(4020) Approved Approved Approved By Date By 1-C S Date --�.-r 2 1.y Date --1 4—, ? ❑ Final-Electrical(4055) Approved By e Date 2,lc, \3 [-.] Rough Electrical El Approved Electrical El Right of Way Approved Approved 1 Approved By Date By Date By Date