10-102880 • •---14. Mechanical''
CiityDev Federal entS Perm!#: 10-102880-00-ME
Community Development Services
P.O.Box 9718
`�1S �
Federal Way,WA 98063-9718 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax (253)835-2609
Project Name: REESE
Project Address: 33014 4TH PL S Parcel Number: 132140 0950
Project Description: Replace gas 80k btu furnace,install 3 ton heat pump,and replace gas 50 gallon hot water
heater
Owner Applicant Contractor
ELVIN&CRYSTAL REESE WESCO NORTHWEST PERMIT WASHINGTON ENERGY SERVICES CO
33014 4TH PL S NORTHWEST PERMIT/WESCO (GENERAL)
FEDERAL WAY WA 98003-5941 1345 W GULF RD WASHIES971OB(9/2/11)
POINT ROBERTS WA 98281 2800 THORNDYKE AVE W
SEATTLE WA 98199
Mechanical Valuation 13249.00 Is this an Online or O.T.C.application? Yes
Compressors/Heat Pumps 1 Furnaces 1 Hot Water Tanks 1
PERMIT EXPIRES Wednesday, January 5, 2011
Permit Issued on Friday,July 9, 2010
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: ON 1,(146 Date: //4411)9/
Wz /'°
THIS CARD IS TO REMAIN ON-SITE '
CITY of Construction I ection Record
Federal Way INSPECTION REQU TS: (253)835-3050
PERMIT#: 10-102880-00-ME Address: 33014 4TH PL S
Owner: ELVIN & CRYSTAL REESE FEDERAL WAY, WA 98003-5941
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test p. Approved
By Date By Date By,C Date 1-1_2...%___i_
j
El Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date