12-100357 dtuilding - Multi Family
City of Federal Way
Community&Econ.on.D ev.Services Permit #: 12-100357-00-MF
b _::;
33325 8th Ave S
Federal Way,WA 98003 -4 Inspection Request Line: (253)835-3050
Ph (253)835-2607 Fax(253)835-2609 6.4444
P 4
Project Name: ST CROIX APARTMENTS BUILDING 10(Phase 2)
Project Address: 32152 18TH AVE SW Bldg 10 Parcel Number: 132103 9102
Project Description: REP-Remove existing shingle roof and replace with shingles.Install 301b felt,ice and
water shield.All metal flashing,30 yr certainteed shingle.
Owner Applicant Contractor Lender
LEEWARD STRATEGIC CENTIMARK CENTIMARK LEEWARD STRATEGIC
PROPERTIES 3416"B"ST NW SUITE D CENTIC*009NZ(6/16/13) PROPERTIES INC
4 EMBARCADERO CENTER SUITE AUBURN WA 98001 3416"B"ST NW SUITED 4 EMBARCADERO CENTER SUITE 1
SAN FRANCISCO CA 94111 AUBURN WA 98001 SAN FRANCISO CA 94111
Census Category: 555 - Non-structural roofing permits
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area(sq.ft.) 0 0 0 0
New/Additional Sq.Feet-3rd Floor 0 New/Additional Sq.Feet-Basement 0
Mechanical to be Included9 No Number of Stories. 2
Permit for Building Shell Only? No Plumbing to be Included9 No
New/Additional Sq.Feet-Total 0 Zoning Designation RM 2400
jiff t t ,,. A,A s ,„ 6,,,. :.., �: ,w..., , ` : «,.a'r
PERMIT EXPIRES Tuesday, July 24, 2012
Permit Issued on Thursday, January 26, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
See the City of Federal Way.
g
ent: V Application
Owner or agent: Date:
,JAN 2 6 2012
FAN 3/r;'/(z
' THIS CARD IS TO MAIN ON-SITE '
CITY OF • Construction I ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 12-100357-00-MF Address: 32152 18TH AVE SW Bldg 10
I Project: LEEWARD STRATEGIC PROPERTI FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Roof Sheathing(4220) 0 Final-Building(4050)
Approved to install roofing Approved
By /...2,1" Date 3 Zo ft By I i Date j .2-7-(Z
0 Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date
°� 1.Y
t9 4111/ iS - I 0 0 3 ±-.
am.....___A 0 '
Feder �y®��0 y PERMIT SF �F CO ME PL DE EN FP
COMMUNITYDEVELA SER.,.E� � V
AP P LI CAT I O N
253-835-2607•FAX 253-835t