13-105508 t S
Building - Commercial
City of Federal Way 41 ILE
Community&Econ.Dev.Services Permit #: 13-105508-00-CO
33325 8th Ave S
Federal Way,WA 98003
Ph:(253)835-2607 Fax (253)835-2609 Inspection Request Line: (253)835-3050
Project Name: FEDERAL WAY LITTLE LEAGUE
Project Address: 450 SW CAMPUS DR Parcel Number: 192104 9004
Project Description: ADD-Construct batting cage
Owner Applicant Contractor Lender
FEDERAL WAY NATIONAL SECOMA FENCE INC SECOMA FENCE INC OWNER IS LENDER
LITTLE LEAGUE 7720 PACIFIC HWY E SECOMFI176BJ(2/19/15)
1911 SW CAMPUS DRIVE MILTON WA 98354 7720 PACIFIC HWY E
PO BOX 214 MILTON WA 98354
FEDERAL WAY WA 98023
Census Category: 437-Commercial alt/add/conversion
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area(sq.ft.) 0 0 0 0
Additional Permit Information
Mechanical to be Included? No Number of Stories 0
Permit for Building Shell Only? No Plumbing to be Included? No
New/Additional Sq.Feet-Total 0 Zoning Designation RS 9.6
No Fixtures Associated With This Permit!!
PERMIT EXPIRES Wednesday, August 27, 2014
Permit Issued on Friday, February 28, 2014
I
hereby certify that the above information is correct and that the construction on the above described property and
fY
the occupancy a • the se will be in accordance with the laws, rules and regulations of the State of Washington
and the City of F-- al Way.
Owner or agent it Ai �::i►l Date: 2 r -2..?/26/4/
(
F
IN pkt..E.1)
Rovtc, ..41
c3o Co
THIS CARD IS TO MAIN ON-SITE
miry Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 13-105508-00-CO Address: 450 SW CAMPUS DR
Project: FEDERAL WAY NATIONAL LITTLE FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 SWM Precon Site Mtg(4400) 0 Initial Erosion Control(4365) Footings/Setback(4110)
Approved To be done prior to breaking ground Approved to place concrete
By Date By Date By3 Date 3 ' 1i ' I`t
.
O Foundation Wall(4115) 0 Drainage/Downspout(4040) Re-steel(4215)
Approved to place concrete Approved to backfill Approved to place concrete or grout
By Date By Date By Date
O Slab/Concrete Floor(4255) 0 Underfloor Framing(4285) El Floor Sheathing(4105)
Approved to place concrete Approved to sheath floor Approved to install flooring
By Date By Date By Date
•
.
O Shear Walls(4245) 0 Roof Sheathing(4220) Fire/Draft Stops(4095)
Approved to install siding Approved to install roofing Approved
By Date By By Date B Date
O Interim Erosion Control(4370) Prior to scheduling a Framing inspection; Framing(4120)
Approved Electrical,Plumbing&Mechanical Rough-in and Approved to insulate
Fire/Draft Stop inspections must be signed-off and
By Date approved. IBC 109.3.4 BY Date
.
o Insulation(4150) 0 Gypsum Wallboard Nailing(4130) 0 Suspended Ceiling Grid (4265)
Approved to install wallboard Approved to install mud&tape Approved t o drop p the
By Date By Date By Date
❑ Final-Fire Department(4060) El Final-Planning 0 Final-Public Works(4080)
Approved Approved Approved
By Date By Date By Date
O Final Erosion Control(4375) CI Final-Building(4050)
Approved Approved
By By Date �-- Ny\. iS-' Date s-(3- 1
I
1 0 0 Rough Electrical Final Electrical Right of Way
I Approved Approved Approved
By Date By Date By Date
Y Y Y
CITY OF PERM LIGATION
Federal Way
DEC 11 2013
PERMIT NUMBER _ 10 C. 5 V _ CO CITY O;FED {lAtrLNAY 1/a/4 --
AEDS
SITE ADDRESS SUITE/UNIT#
5C) SW GAf/(R) S -
PROJECT VALUATION iA ZONING ASSESSOR'S TAX/PARCEL#
- - - - -
TYPE OF PERMIT
BUILDING ❑ PLUMBING 0 MECHA
NICAL ❑ DEMOLTON ❑ ENGINEERING 0 FIRE PREVENTION
NAME OF PROJECT .F % t-Rilt- WAY V l TT-L : L W6V
PROJECT DESCRIPTION I N '1� y) (J\t
Detailed description of work to '`� � J � / G v�1 Vri
be included on this permit only
NAME PRIMARY PHONE
PROPERTY OWNER
MAILING ADDRESS E-MAIL
\ . C„OrIM�7 Lti CC w-t Gk: sCoV-vRAA6.. '
CIT STATE ZIP
`_1c:\e k\-ADCU \ 7C)( �`s -
---
NAME PHONE
Se-CC WtC Fe - C T-vt �3 926 S to b0
MAILING ADDRESS E-MAIL
CONTRACTOR 2,0 ?CAC., iL kirkkldk V10- WL`Q,` cco-clFe." "Cpt'/'k
CITY STAT ZIP FAX
I/V i` � h- Z 253 °/2(9 3oa�
WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE#
S 2 LO�►-� � l La 13� 20-\- --100132-1 -00-13L
NAME PRIMARY PHONE
APPLICANT MAILING ADDRESS E-MAIL
CITY STATE ZIP FAX
NAME PRIMARY PHONE
PROJECT CONTACT
----(The-individual to receive-and--- MAILING ADDRESS E-MAIL
respond to all correspondence
concerning this application) CITY STATE ZIP FAX
NAME
PROJECT FINANCING [J OWNER-FINANCED
Required value of$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE
(RCW 19.27.095)
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in
the investigation and defense of such claim),which may be made by any person,including the undersigned,and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the�city� as a part of this application.
SIGNATURE: A V DATE 1 2- / f 1 /20 r 3
A)
PRINT NAME: j )X t`f�GtCri
Bulletin#100—January 1,2013 Page 1 of 3 k:\Handouts\Permit Application
a