16-100067 City of Federal Way ; E1ctr cal
Permit {{��
Community&Econ.Dev.Services Permit #: 16-100067-00-EL
33325 8th Ave S
Federal Way,WA 98003 Inspection Request(253)835-2607 Fax:(253)835-2609 Ins ec� p equest Line: 253 835-3050
Project Name: PAVILION APARTMENTS BLDG 15
Project Address: 1900 SW CAMPUS DR Bldg 15 Parcel Number: 132103 9103
Project Description: Add an AES radio to the current FACP
Owner Applicant Contractor
FPA4 CASCADE RIDGE LLC MARK JENSEN INNOVATIVE SYSTEMS TECHNOLOGY
4685 N MACARTHUR CT SUITE 400 INNOVATIVE SYSTEMS TECH,INC. INC(ELECTRICAL)
NEWPORT BEACH CA 92660 6353 S ISLAND DR E INNOVST881B4(1/24/16)
BONNEY LAKE WA 98391 6353 S ISLAND DR
BONNEY LAKE WA 98391
Additional Permit Information
Electrical Work Valuation 600 Is this an Online or O.T.C.application? Yes
Is Use Educational or Institutional? No Service greater than 999 Amps9 No
Electrical Fixtures
Low Voltage-Fire Alarm(Comm( I
PERMIT EXPIRES Wednesday, July 6, 2016
Permit Issued on Friday,January 8, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: cJ L. I NJ E Date:
THIS CARD IS TO MAIN ON-SITE
CITY OF - Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 16-100067-00-EL Address: 1900 SW CAMPUS DR Bldg 15
Project: FPA4 CASCADE RIDGE LLC FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El UFER Ground (4295) - -121 Ditch cover(4030) Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
0 Pool Bonding(4195) El Temporary Power(4275) 0 Service(4235)
Approved Approved Approved
By Date By Date By Date
•
0 Feeders/Sub-panels(4045) 0 Rough Electrical(4225) 0 Ceiling Cover(4020) `
Approved Approved Approved
By Date By Date By Date
,
Final-Electrical(4055)
Approved
By 13 Date _ I`i‘•-1„L
❑ Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date