13-103434 • • Electrical
City of Federal Way Permit #: 13-103434-00-EL
Community&Econ.Dev.Services
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: 25
Ph:(253)835-2607 Fax:(253)835-2609 p q ( 3)835-3050
Project Name: CAMPUS GROVE BLDG 54
Project Address: 1300 SW CAMPUS DR BLDG 54 Parcel Number. 182104 9064
Project Description: Installing AES Radio Transmitter to Monitor FACP
Owner Applicant Contractor
CAMPUS GROVE LLC&BORN L KARINA VELIZ GUARDIAN SECURITY SYSTEMS
PO BOX 178 GUARDIAN SECURITY (ELECTRICAL)
BOW WA 98232-0178 1743 S FIRST AVE GUARDSS233K5(9/30/13)
SEATTLE WA 98134 1743 1 ST AVE S
SEATTLE WA 98134
Additional Permit information
Is this an Online or O.T.C.application's Yes Is Use Educational or Institutional? No
Service greater than 999 Amps? No
Electrical Fixtures
Low Voltage-Other(Residential). 1
PERMIT EXPIRES Wednesday, August 5, 2015
Permit Issued on Monday,August 5, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
a d the City f ederal Way.
Owner or agent " Date:
II
F" ' I i.1
�1 , THIS CARD IS TO ON-SITE > -
CITY OF 40110
Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 13-103434-00-EL Address: 1300 SW CAMPUS DR BLDG 54
Project: CAMPUS GROVE LLC & BORN L FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
Rough Electrical(4225) Ceiling Cover(4020) U Final-Electrical(4055)
Approved Approved Approved
O
By Date By Date = ' Date tJ( ..‘ZZ,,
. . .
40
I
1 FILE
El Rough Electrical Final Electrical Right of Way
Approved Approved U Approved
By Date By Date By Date