11-104797 II It uilding - Coinm.rcial
City of Federal Way • '� e A 00
Community&Econ.Dev.Services Permit ; A 1 1-1 04797- -V O
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253) 835-3050
Ph:(253)835-2607 Fax:(253)835-2609 p q
■
Project Name: LAKOTA PARK-SOUTH BALL FIELD
Project Address: 31334 SW DASH POINT RD Parcel Number: 122103 9016
Project Description: ALT-Replace backstop and foul line fencing.
Owner Applicant Contractor Lender
STEVE IKERD STEVE IKERD ALL AROUND FENCE CO
CITY OF FEDERAL WAY-PRCS CITY OF FEDERAL WAY-PRCS ALLARFC085BA(1/1/14)
33325 8TH AVE S 33325 8TH AVE S PO BOX 1029
FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 RAVENSDALE WA 98051
Census Category: 565 -Fence/retaining wall
Includes: #1 #2 #3 #4
Occupancy Class:
Construction Type:
Occupancy Load:
Floor Area(sq.ft.) 0 0 0 0
Mechanical to be Included? No Number of Stories 1
Permit for Building Shell Only? No Plumbing to be Included? No
New/Additional Sq.Feet-Total 0 Zoning Designation SE
PERMIT EXPIRES Wednesday, May 30, 2012
Permit Issued on Friday, December 2, 2011
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
d the City of Federal Way.
Owner or agent: - • 4--e.t-t Date: I 2 ' -2-' `
rIti4LW L1I1112'
THIS CARD IS TO REMAIN ON-SITE ,, v
CITY OF Construction Iliection Record "' `
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 11-104797-00-CO Address: 31334 SW DASH POINT RD
Project: STEVE IKERD FEDERAL WAY, WA 98023 ;,
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
▪ SWM Precon Site Mtg(4400) El Initial Erosion Control(4365) o Footings/Setback(4110)
Approved To be done prior to breaking ground Approved to place concrete
By Date By Date By i�i1 Date /2 /f1.- /
o Foundation Wall(4115) 0 Drainage/Downspout(4040) El Re-steel(4215)
Approved to place concrete Approved to backfill Approved to place concrete or grout
By Date By Date By Date
•
• Slab/Concrete Floor(4255) El Underfloor Framing(4285) El Floor Sheathing(4105)
Approved to place concrete Approved to sheath floor Approved to install flooring
By Date By Date By Date
Shear Walls(4245) El Roof Sheathing(4220) Fire/Draft Stops(4095
P (4095)
Approved to install siding Approved to install roofing Approved
By Date By Date By Date
0 Interim Erosion Control(4370)prior to scheduling a Framing inspection; Framing(4120)
Approved Electrical,Plumbing&Mechanical Rough-in and Approved to insulate
Fire/Draft Stop inspections must be signed-off and
By Date approved. IBC 109.3.4 By Date
El Insulation (4150) 0 Gypsum Wallboard Nailing(4130) El Suspended Ceiling Grid (4265)
Approved to install wallboard Approved to install mud&tape Approved to drop tile
By Date By Date By Date
Final-Fire Department(4060) El Final-Planning ❑ Final Erosion Control(4375)
Approved Approved Approved
By Date By Date By Date
❑ Final-Building(4050)
Approved
By /"ri Date /-//-7z._
Rough Electrical Final Electrical Right of Way
Approved Approved Approved
I By Date By Date By Date
I
r
1
• l _ 0 Y7i7
-
Fe , .,. UGC PERMIT
SF MF 0 E PL DE EN FP
Fede 0 C )
COMMUNITY DEVE •- E8 APPLICATION .., I''
253-835-2607•F• 253-835-2609
:owl:.ci o)federa5wau.:'am i) '� i1
Gad EC 5 AY
■
SITE ADDRESS 4Dttkr■
"' SUITE/UNIT#
-S Vcilk ki DtAc. tk Pcr 0-b
PROJECT VALUATION ZONING ASSESSORS TAX/PARCEL#
$ 4O0C)0 SE- � L 1 O � - 9
TYPE OF PERMIT / BUILDING ❑ PLUMBING ❑ MECHANICAL
❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
(Tenant Name/Homeowner Last Name) f h4{L._r 3' S t1/4LL ct .L1
g�`V%-017 c spirt-TOR`
C ow.ST' t,l k.-) 20( k ( µ Vic- KScof
PROJECT DESCRIPTION
Detailed description of work to k k 0" 4A 1(x17 co LA L L I LI c FMC-- .S
be included on this permit only
NAME PRIMARY Y P
HONNE
PROPERTY OWNER - ‘� O' Fet'L- rkq' {94L�S (z c 7gc3 -to q
11
MAILING ADDRESS E-MAIL
LAISTAX ZIri a)up,5
NAME
PHONE
All AvV tC ∎e l 4 tu , 7
MAILING ADDRESS , E-MAIL
CONTRACTOR 4.A
C C?,_cL1/u4JD c S7 y�! /(QZIP
FAX '
WAS TE CONTRALTO CE EXPIRATION DATE FED AY BUS N E# \
Uzi / / F L l/! t Sao��JI
NAS4'wd /�'y Cl PHONE
APPLICANT MAILING ADDRESS E-MAIL
CITY STATE ZIP FAX
PROJECT CONTACT Q 0 r A. s p
(The individual to receive and N 5 1`l (Z\"3S `
respond to all correspondence
MAILING ADDRESS MAI
concerning this application)
CITY I STATE ZIP FAX
ALTERNATE CONTACT NAME: PHONE E-MAIL
.k. t1' 63C-6)1
PROJECT FINANCING NAME
OWNER-FINANCED
Required value of$5,000 or more
1RCW 19.27.095) MAILING ADDRESS,CITY,STATE,ZIP PHONE
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit.I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in
the investigation and defense of such claim),which may be made by any person,including the undersigned,and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as a part of this application.
SIGNATURE: DATE t i -Z. II
PRINT NAME:
SIC-VC I 4-8,
Bulletin#100—January 1,2011 Page 1 of 3 k:\Handouts\Permit Application