Loading...
16-103165 • Electrical City of Federal Way Community&Econ.Dev.Services FILE Permit #: 16-103165-00-EL 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: 253 835-3050 Ph:(253)835-2607 Fax:(253)835-2609 P q Project Name: STARBUCKS COFFEE Project Address: 1656 SW DASH POINT RD Parcel Number: 189880 0010 Project Description: 20 AMP CIRCUIT FOR REFRIGERATOR/NITROGEN Owner Applicant Contractor DASH POINT VILLAGE LLC PATTY FULLER FULLER ELECTRIC(ELECTRICAL) 1201 PACIFIC AVE SUITE 1400 FULLER ELECTRIC INC FULLEEI027BK(1/12/18) TACOMA WA 98402 1220 S 356TH ST SUITE A-5 37107 12TH AVE S SUITE A-5 FEDERAL WAY WA 98003 FEDERAL WAY WA 98003 Additional Permit Information Electrical Work Valuation'? 600 Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Service greater than 999 Amps? No Electrical Fixtures Circuits-Commercial 1 PERMIT EXPIRES Saturday, July 1, 2017 Permit Issued on Friday, July 1, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ri Date: THIS CARD IS TO ON-SITE . ip& Construction In ection Record Federal Way INSPECTION REQ TS: (253)835-3050 PERMIT#: 16-103165-00-EL Address: 1656 SW DASH POINT RD Project: DASH POINT VILLAGE LLC FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 LIFER Ground(4295) El Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date a Pool Bonding(4195) 0 Temporary Power(4275) El Service(4235) Approved Approved Approved By Date By Date By Date 4 El ' • Feeders/Sub-panels(4045) El Rough Electrical(4225) El Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date 0 Final-Electrical(4055) Approved By 0_16,1 Date f'l^1 I-)is , 0 Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date